G55 Standard Test Method for Evaluating Pipeline Coating Patch Materials

All Standards | ASTM Standards
Search Standards


Click to Purchase and Download this Standard or Test Method

Revision Date: July 08, 2013
Updated On: July 10, 2013
Editorial Change:
 
3.1 Holidays in pipeline coatings may be repaired by circumferential wrapping with a suitable pipe wrap tape. However, this technique is not always practicable and patching may be required. The effectiveness of a patch material depends upon its adhesion to the original pipeline coating to effect sealing.

3.2 The results of this accelerated test have been found to yield comparative data useful for the selection of patching materials. The user is cautioned against the use of this method for absolute material properties characterization.

3.3 This procedure provides an accelerated method by exposing the patch to a severe radius of curvature on small-diameter pipe. The specimen is also exposed to a stress voltage in the presence of a highly conductive electrolyte.

(Back to all Standards)

 
   
Advertisements
 
WEFTEC Show

 
KTA-Tator, Inc. - Corporate Office

 
Induron Coatings, Inc.

 
DeFelsko Corporation

 
Mitsubishi Gas Chemical America

 
Tarps manufacturing, Inc.

 
ABKaelin, LLC

 
NLB Corporation

 
Sidewinder/Persyst Enterprises, Inc.

 
SAFE Systems, Inc.

 
 
 

Technology Publishing Co., 1501 Reedsdale Street, Suite 2008, Pittsburgh, PA 15233

TEL 1-412-431-8300  • FAX  1-412-431-5428  •  EMAIL webmaster@paintsquare.com


The Technology Publishing Network

PaintSquare the Journal of Protective Coatings & Linings Paint BidTracker

 
EXPLORE:      JPCL   |   PaintSquare News   |   Interact   |   Buying Guides   |   Webinars   |   Resources   |   Classifieds
REGISTER AND SUBSCRIBE:      Free PaintSquare Registration   |   Subscribe to JPCL   |   Subscribe to PaintSquare News
MORE:      About PaintSquare.com   |   Privacy Policy   |   Terms & Conditions   |   Support   |   Site Map   |   Search   |   Contact Us