Click to Purchase and Download this Standard or Test Method
Revision Date: May 14, 2012
Updated On: May 14, 2012
Editorial Change:
This practice is used to prepare concrete for coatings where optimum bond is desired for service conditions such as continuous or intermittent immersion, temperature cycling, or mechanical loading.