PaintSquare.com
Follow us on Twitter Follow us on LinkedIn Like us on Facebook Follow us on Instagram Visit the TPC Store
Search the site

 

Advertisement

PaintSquare



June 16 - June 20, 2014

A California utility wants the authority to remove trees and structures from private property if they threaten pipeline integrity. What do you think?

More items for Program/Project Management
Answers Votes
A third-party mediator should help the parties forge a compromise. 50%
It's a public safety issue; the utility should have the final say. 30%
The property owner should have the final say. 16%
Settle it in the courts, before a judge. 4%


Suggest a topic

   

Tagged categories: Pipeline; Pipelines

Comment from Karen Fischer, (6/18/2014, 9:25 AM)

Another erosion of property rights.... If the pipeline came AFTER the structures, why should the property owner lose their house, garage, shed, barn etc;? When it comes down to it, this could mushroom into a lot of problems for millions of property owners who have a natural gas pipeline running in front of their houses as most Urban dwellers have. The text and meaning of new laws never remain the same, they morph into just more regulation & control. This is a land grab and an erosion of property rights, government handing over our rights to a mega-business.


Comment from Tom Schwerdt, (6/19/2014, 8:14 AM)

Not a lot of pipelines come AFTER the structures, if the structure is close enough to cause integrity concerns. Typically pipelines are installed open-trench. Lots cheaper that way.


Comment from M. Halliwell, (6/19/2014, 10:38 AM)

The mediator solution seems like the best option for those that are existing. Perhaps for future installations, the utilities need to look at routing their pipes within a small right-of-way. Then all you need in the right-of-way is agreements for maintenance (i.e. landowner gets a small stipend to do upkeep such as mowing the grass) but the utility can come in to prevent root issues (with proper restoration once the work is completed).


Comment from Karen Fischer, (6/19/2014, 12:26 PM)

Tom, this is not necessarily the case. In my geographical area, a pipeline was placed right on the property line between two residential properties. The homes (which existed at the time) are less than 50' from the buried pipeline. Emminent domain at work on that one. Property owners had NO say in it. It does happen...


Comment from Tom Schwerdt, (6/20/2014, 8:28 AM)

Karen, sure - it can happen that a pipeline is installed later near structures. However, it's a pretty big engineering screwup if the existing structures "threaten pipeline integrity" - which was the topic here. The engineering analysis performed before the pipeline goes in must take those structures into account.


Comment Join the Conversation:

Sign in to our community to add your comments.

Advertisements
 
Tarps manufacturing, Inc.
 
QUALITY MADE IN AMERICA —Available near you!
 
CLICK to get a behind-the-scenes look at how Tarps Manufacturing makes the highest-quality tarps right here in the USA — available nationwide.
 

 
Industrial Vacuum Equipment Corp.
 
Hurricane Vacuums
& Dust Collectors
 
Vacuum and dust collector hose, filters and related accessories.
IndustrialVacuum.com
 

 
Novatek Corporation
 
Dustless Coatings Removal
 
Novatek Corporation, Dustless Coatings Removal Strip, clean and profile all dust free! Comply with new lead standards. Contact today: (866) 563-7800 www.Novatekco.com
 

 
SABRE Autonomous Solutions
 
Repeatability
 
The ALPHA1 provides reliable results consistently allowing you to cost your next job with confidence.
 

 
KTA-Tator, Inc. - Corporate Office
 
KTA-TATOR LABORATORY SERVICES
 
• Coating failure analysis
• Independent testing
• Accelerated weathering testing
• Abrasives Testing
• Oil & Gas Material Qualification
• A2LA Certificate #2455.01
Contact: Rob Leggat
at 412-788-1300 x176
 

 
Fischer Technology Inc.
 
DUALSCOPE®FMP100 with DataCenter IP
 
Transfer customized inspection plans from PC to FMP100 using step-by-step guidance with prompts and pictures throughout the measurement procedure
 

 
BASF
 
New resins from BASF will have metals loving water!
 
Excellent corrosion resistance, low VOC, high gloss, thin films www.basf.us/industrialcoatings dpsolutions@basf.com 800-231-7868
 

 
Blastox/The TDJ Group, Inc.
 
Blastox® - One Step Lead Abatement
 
Sandblast additive delivered to jobsite pre-blended to eliminate hazardous abrasive wastes. Why mix, meter or apply at the job-site? Blast with ease and
Let your painters paint!
1(800)-252-7869
 

 
Sika-Us
 
Sika® Industrial Floor Coatings
 
Click to learn about floor and wall systems relied upon for performance, durability, easy maintenance and aesthetics across the every industry and environment.
 

 
Absolute Equipment/Grand Rental Station
 
TIER 4 EQUIPMENT
 
We have Tier 4 Equipment including Air Compressors & Generators for Sale & Rent! Your job may now require Tier-4. www.absoluteequip.com or Call 412-931-6655.
 

 
 
 

Technology Publishing Co., 1501 Reedsdale Street, Suite 2008, Pittsburgh, PA 15233

TEL 1-412-431-8300  • FAX  1-412-431-5428  •  EMAIL webmaster@paintsquare.com


The Technology Publishing Network

Durability + Design PaintSquare the Journal of Protective Coatings & Linings Paint BidTracker

 
EXPLORE:      JPCL   |   PaintSquare News   |   Interact   |   Buying Guides   |   Webinars   |   Resources   |   Classifieds
REGISTER AND SUBSCRIBE:      Free PaintSquare Registration   |   Subscribe to JPCL   |   Subscribe to PaintSquare News
MORE:      About PaintSquare.com   |   Privacy Policy (Updated 5/24/2018)   |   Terms & Conditions   |   Support   |   Site Map   |   Search   |   Contact Us