PaintSquare.com
Follow us on Twitter Follow us on LinkedIn Like us on Facebook Follow us on Instagram Visit the TPC Store
Search the site

 

Advertisement

Safway Services


Coatings Industry News

Main News Page


MI, Enbridge to Discuss Straits Utility Tunnel

Friday, June 8, 2018

More items for Program/Project Management
More items from North America

Comment | More

Michigan officials are reportedly working with Enbridge Energy on a possible plan to create a new “utility corridor” under the Straits of Mackinac that would contain the company’s Line 5 liquids pipeline as well as other infrastructure running under the waterway.

Straits of Mackinac
U.S. Coast Guard

The new proposal is for a utility corridor to be bored beneath the Straits of Mackinac.

Enbridge is currently finalizing a report to the state, ordered as part of an agreement reached last fall with Gov. Rick Snyder, in which it will discuss the feasibility and merits of several possible replacements for the controversial oil pipeline. According to The Detroit News, the company is expected to recommend a tunnel as a replacement for the submerged pipeline.

The Michigan Tech Proposal

A group of engineering students from Michigan Technological University approached the state last month with a proposal for a shared utility tunnel under the Straits that would consolidate a Line 5 replacement pipeline with utilities like the American Transmission Company’s electric cable, which was damaged in April by what is now believed to have been an anchor strike from a passing tug. Line 5 was dented in that incident.

The Michigan Tech group, working under professor Michael Drewyor and industry advisor James A. Morrison, of ILF Consultants Inc., presented its idea to the Michigan Pipeline Safety Advisory Board in mid-May. The board, which consists of stakeholders including citizens, environmentalists and pipeline operators, serves to advise the state on pipeline matters but does not have decision-making authority.

Tunnel proposal
Michigan Tech, via Michigan Pipeline Safety Advisory Board

The tunnel would have a 21-foot diameter as proposed, to allow for maintenance access via vehicle and to accommodate possible future utility expansion.

The tunnel as proposed by the students would align roughly with the current Line 5 and would accommodate replacements for Line 5, the ATC cables, high-voltage lines Cloverland Electric Cooperative has under the Straits currently, and a natural gas pipeline operated by TransCanada that has been in operation since 1968.

The Detroit News reports that AT&T also has a fiber-optic cable running under the Straits.

The tunnel would have a 21-foot diameter as proposed, to allow for maintenance access via vehicle and to accommodate possible future utility expansion. Rail and rubber-tire vehicles would have access to the tunnel for maintenance purposes.

The tunnel would, according to the Michigan Tech group, cost just under $570 million to build, including $380 million for the tunnel-boring itself. The group estimates the project would take seven years to complete.

Enbridge’s assessment of possible alternatives for the replacement of Line 5 will reportedly be released Friday.

About Line 5

Line 5, which originates in Superior, Wisconsin, where several other Enbridge lines terminate, moves crude oil and natural gas liquids to Sarnia, Ontario, via Michigan. According to Enbridge, while much of the crude coming from Alberta goes to refineries in Sarnia, some is also refined in Michigan and Ohio. At points, sweet crude produced in Michigan is pumped into Line 5 to make its way to refineries as well.

The controversial 65-year-old liquids pipeline has experienced coating loss in recent years. Some citizens, environmentalists and lawmakers insist the line should be shut down due to the risk for an environmental disaster should a breach occur.

Enbridge has held that the pipeline’s integrity has never been compromised. The line has never had a leak in over six decades of service, and this past summer, it passed a pressure test ordered as part of the company’s consent agreement, established after the 2010 spill on its Line 6B.

   

Tagged categories: Government; Infrastructure; Oil and Gas; Pipelines; Tunnel

Comment from Robert Shaw, (6/8/2018, 10:06 AM)

Let's hope the experience of the power tunnel fire that shut down ATL in Atlanta is remembered and considered in design. Power cables and flammable/combustible liquids piping in the same tunnel can be a dangerous situation.


Comment from Michael Halliwell, (6/11/2018, 12:52 PM)

Same thing with the lighting and the rails / vehicle space. Need to make sure that the gas and oil lines are properly isolated so that one short, a blown bulb or someone going to do maintenance doesn't cause an inferno under the Straits of Mackinac.


Comment Join the Conversation:

Sign in to our community to add your comments.

Advertisements
 
SAFE Systems, Inc.
 
Enduroguard -
The Tough Cable
for a Tough Industry.
 
Reduce maintenance costs and down time, increase job site safety with Enduroguard Cable. Available exclusively from SAFE Systems. UL listed, flexible, abrasion resistant and cut resistant.
 

 
SABRE Autonomous Solutions
 
Imagine having an operator that takes less time to output more work
 
Once trained, a single operator can easily manage multiple SABRE systems.
 

 
Novatek Corporation
 
Dustless Coatings Removal
 
Novatek Corporation, Dustless Coatings Removal Strip, clean and profile all dust free! Comply with new lead standards. Contact today: (866) 563-7800 www.Novatekco.com
 

 
Absolute Equipment/Grand Rental Station
 
TIER 4 EQUIPMENT
 
We have Tier 4 Equipment including Air Compressors & Generators for Sale & Rent! Your job may now require Tier-4. www.absoluteequip.com or Call 412-931-6655.
 

 
Jotun Paints Inc.
 
Jotun Jotachar 1709
 
Mesh-free passive fire protection epoxy designed to protect against hydrocarbon pool fire scenarios for up to four hours as defined in the ANSI/UL1709 standard.
 

 
KTA-Tator, Inc. - Corporate Office
 
New KTA Pipeline Inspection Kit
 
• Defelsko standard memory body
• Positector FTS 0-250 mils, cabled dry film thickness probe
• NEW Positector Shore D hardness probe
• All essential inspection equipment!
Visit www.ktagage.com
 

 
HoldTight Solutions Inc.
 
Clean surfaces simply don’t rust, and no other product cleans like HoldTight®102.
 
HoldTight®102 is a wet blasting additive that decreases the water’s surface tension, allowing it to get into the profile of the surface and remove ALL contamination, including salts, acids, abrasives, light oils, and greases. HoldTight®102 leaves behind no film and evaporates with the water, providing a surface that is thoroughly clean and ready for coating, rust-free for up to 72 hours.
 

 
Blastox/The TDJ Group, Inc.
 
Blastox® - One Step Lead Abatement
 
Sandblast additive delivered to jobsite pre-blended to eliminate hazardous abrasive wastes. Why mix, meter or apply at the job-site? Blast with ease and
Let your painters paint!
1(800)-252-7869
 

 
 
 

Technology Publishing Co., 1501 Reedsdale Street, Suite 2008, Pittsburgh, PA 15233

TEL 1-412-431-8300  • FAX  1-412-431-5428  •  EMAIL webmaster@paintsquare.com


The Technology Publishing Network

Durability + Design PaintSquare the Journal of Protective Coatings & Linings Paint BidTracker

 
EXPLORE:      JPCL   |   PaintSquare News   |   Interact   |   Buying Guides   |   Webinars   |   Resources   |   Classifieds
REGISTER AND SUBSCRIBE:      Free PaintSquare Registration   |   Subscribe to JPCL   |   Subscribe to PaintSquare News
MORE:      About PaintSquare.com   |   Privacy Policy   |   Terms & Conditions   |   Support   |   Site Map   |   Search   |   Contact Us