PaintSquare.com
Follow us on Twitter Follow us on LinkedIn Like us on Facebook Follow us on Instagram Visit the TPC Store
Search the site

 

Advertisement

Clemco Industries Corp.


Coatings Industry News

Main News Page


Sunoco Pipeline Build Stalled Again

Wednesday, May 30, 2018

More items for Health & Safety
More items from North America

Comment | More

Pennsylvania Public Utility Commission Judge Elizabeth Barnes recently ordered the suspension of gas transportation through Sunoco’s Mariner East 1 pipeline, while also stopping any further construction on the Mariner East 2 pipelines, citing contaminated water wells, sinkholes and poor managerial decisions on the company’s part.

In response, Sunoco’s parent company, Energy Transfer Partners, said that the decision was based on “extrajudicial claims,” rather than due process.

Pipeline History

Mariner East 2, set to move ethane, propane and other petroleum products from Ohio and West Virginia east to the Philadelphia region, is planned for completion later this year, according to Sunoco.

Mariner East 2 is being constructed of 350 miles of 16-inch pipe and 250 miles of 20-inch pipe, most rolled, milled and coated in the United States, according to Sunoco. The first Mariner East pipeline, 300 miles long, was completed in 2016 and conveys liquid propane and ethane to from the Marcellus shale drilling region of Western Pennsylvania east to Sunoco’s Marcus Hook, Pennsylvania, refinery.

© iStock.com / rootstocks

Pennsylvania Public Utility Commission judge Elizabeth Barnes recently ordered the suspension of gas transportation through Sunoco’s Mariner East 1 pipeline, while also stopping any further construction on the Mariner East 2 pipelines, citing contaminated water wells, sinkholes and poor managerial decisions on the company’s part.

In January, the Pennsylvania Department of Environmental Protection stopped construction of Mariner East 2 pipeline after a series of incidents in which drilling fluids were released into the environment over the course of seven months.

In March, sinkholes caused by the construction of the new pipelines caused the PUC to suspend operation of Mariner East 1. The pipeline was allowed to resume operation earlier this month, once the PUC was satisfied that the integrity of the structure wasn’t compromised.

Cessation Order

Judge Barnes’ order was issued in response to a petition filed by Sen. Andy Dinniman, D-Pennsylvania.

According to the Pittsburgh Post-Gazette, the Mariner East 2 pipeline is nearly done—only 20 more miles of its 350-mile trajectory are needed for completion. Mariner East 2X will reportedly follow the same route, and is expected to come online mid-2019.

In her decision, Barnes cited Sunoco’s record of construction and operational mishaps in Pennsylvania and elsewhere, including an incident in Texas two years ago, where the company used unqualified welders in the construction of a pipeline, which later failed.

The judge also charged that Sunoco failed to notice and report three leaks from the Mariner East 1 pipeline from within the past year, which were all located in “high-consequence” areas.

The company has disputed the validity and relevance of what Barnes used in her verdict, going on to emphasize that by allowing Mariner East 1 to restart earlier this month, the PUC found the pipeline to be safe.

“The public needs protection from sinkholes, water contamination, damage to public and private property, degradation of natural resources, physical injury and death,” the judge wrote. “It would be injurious to the public to not slow down this project.”

The judge also rejected Sunoco’s request that Dinniman be obligated to post $192 million in bonds for the losses during the shutdown if an injunction is granted. Sunoco also plans to file an appeal.

   

Tagged categories: Construction; Environmental Protection; Government; Oil and Gas; Pipelines

Comment Join the Conversation:

Sign in to our community to add your comments.

Advertisements
 
Bullard
 
Bullard Made in the USA
 
 

 
Novatek Corporation
 
Dustless Coatings Removal
 
Novatek Corporation, Dustless Coatings Removal Strip, clean and profile all dust free! Comply with new lead standards. Contact today: (866) 563-7800 www.Novatekco.com
 

 
SAFE Systems, Inc.
 
SAFE Systems'
Blast Lights &
Deadman Switches
 
Halogen or LED blast lights available with our NEW urethane bumper. Switches available in many colors for color coding your hoses.
 

 
Industrial Vacuum Equipment Corp.
 
Hurricane Vacuums
& Dust Collectors
 
Vacuum and dust collector hose, filters and related accessories.
IndustrialVacuum.com
 

 
Absolute Equipment/Grand Rental Station
 
TIER 4 EQUIPMENT
 
We have Tier 4 Equipment including Air Compressors & Generators for Sale & Rent! Your job may now require Tier-4. www.absoluteequip.com or Call 412-931-6655.
 

 
Jotun Paints Inc.
 
Jotun Jotachar 1709
 
Mesh-free passive fire protection epoxy designed to protect against hydrocarbon pool fire scenarios for up to four hours as defined in the ANSI/UL1709 standard.
 

 
Mitsubishi Gas Chemical America
 
Performance Amine 1,3-BAC
 
A highly reactive cycloaliphatic diamine offering superior performance. Reasonable cost and curing efficacy makes it suitable for all types of epoxy resin applications.
 

 
NLB Corporation
 
More Rental Equipment than Anyone Else.
 
NLB has more water jetting equipment – from pumps to accessories - available for immediate rental than anyone else at seven regionally-placed service offices. 800-441-5059.
 

 
Diversified Communications
 
The International WorkBoat Show
 
Join us for the 2018 edition of the WorkBoat Show! Held every year in New Orleans, this is the largest commercial marine trade show in North America!
 

 
Carboline Company
 
New product: Carbozinc® 608 HB
 
Introducing a new high build zinc-rich primer that can save you time and money by eliminating the epoxy intermediate coat!
 

 
 
 

Technology Publishing Co., 1501 Reedsdale Street, Suite 2008, Pittsburgh, PA 15233

TEL 1-412-431-8300  • FAX  1-412-431-5428  •  EMAIL webmaster@paintsquare.com


The Technology Publishing Network

Durability + Design PaintSquare the Journal of Protective Coatings & Linings Paint BidTracker

 
EXPLORE:      JPCL   |   PaintSquare News   |   Interact   |   Buying Guides   |   Webinars   |   Resources   |   Classifieds
REGISTER AND SUBSCRIBE:      Free PaintSquare Registration   |   Subscribe to JPCL   |   Subscribe to PaintSquare News
MORE:      About PaintSquare.com   |   Privacy Policy   |   Terms & Conditions   |   Support   |   Site Map   |   Search   |   Contact Us