PaintSquare.com
Follow us on Twitter Follow us on LinkedIn Like us on Facebook Follow us on Instagram Visit the TPC Store
Search the site

 

Advertisement

PaintSquare


Coatings Industry News

Main News Page


Line 5 May Get Wrap After April Damage

Thursday, May 17, 2018

More items for Quality Control
More items from North America

Comment | More

The early-April incident that severed an electric cable under Michigan’s Straits of Mackinac left Enbridge Energy’s Line 5 pipeline with dents of up to three-quarters of an inch, according to the company, which may add protective sleeves to the affected area of the twin lines.

A tug operated by VanEnkevort Tug and Barge is believed to have dragged its anchor across the Straits in the area of the liquids pipelines and American Transmission Company’s electric lines, causing damage that was discovered April 1. One of the ATC cables was severed, causing a 600-gallon spill of dielectric fluid into the water.

Straits of Mackinac
U.S. Coast Guard

A tug operated by VanEnkevort Tug and Barge is believed to have dragged its anchor across the Straits in the area of Line 5, causing damage that was discovered April 1.

Enbridge temporarily shut down Line 5 after the incident, restarting it April 4 but revealing more than a week later that the twin pipelines were dented, presumably by the same strike that damaged the cable. Last week, the company revealed that the lines sustained dents of one-half to three-quarters of an inch. The company says the dents did not affect the 1-inch wall thickness of the 20-inch-diameter pipes.

On Monday (May 14), MLive reported that the company is likely to cover the affected areas with a protective wrap.

Pipeline Controversy

Line 5 has been a lightning rod for criticism in recent years due in part to its status as the only liquids pipeline running under the Great Lakes. Last year, Enbridge revealed that the lines’ protective coating had gaps, but only after a series of statements that critics, including Michigan’s governor, characterized as less-than-forthcoming.

In March 2017, a month after insisting the coal-tar enamel coating was intact, the company admitted there were 18 areas of coating delamination on the pipeline, but said that only the outer layer was affected, and that the company would not take steps to make repairs because the main coating was still intact. The company said at that time that there were no holidays, or areas of bare metal, on the pipeline.

The revelation in August that there were a number of areas of bare metal, some as large as one square foot, came with a promise that the company was working on repairs.

State Agreement

In December, Gov. Rick Snyder inked an agreement with Enbridge in which the company will explore options for the pipeline’s eventual replacement, though it does not place a timeline on the potential project. The twin lines could be replaced with a pipeline in a tunnel, one installed via horizontal direction drilling or one in a trench with a secondary containment structure around it.

After the damage was sustained in the reported anchor strike last month, Enbridge reduced the pipeline’s maximum operating pressure, though the company says the move did not affect its normal pressure, which is considerably lower than the maximum.

Enbridge has held that the pipeline’s integrity has never been compromised. The line has never had a leak in over six decades of service, and last summer, it passed a pressure test ordered as part of the company’s consent agreement, established after the 2010 spill on its Line 6B.

   

Tagged categories: Infrastructure; Oil and Gas; Pipelines

Comment Join the Conversation:

Sign in to our community to add your comments.

Advertisements
 
Fischer Technology Inc.
 
TSA Coatings on Stainless Steel
 
Fischer’s Phascope PMP10 and ESD20TSA probe are incredibly accurate and easy to use.
 

 
HoldTight Solutions Inc.
 
Clean surfaces simply don’t rust, and no other product cleans like HoldTight®102.
 
HoldTight®102 is a wet blasting additive that decreases the water’s surface tension, allowing it to get into the profile of the surface and remove ALL contamination, including salts, acids, abrasives, light oils, and greases. HoldTight®102 leaves behind no film and evaporates with the water, providing a surface that is thoroughly clean and ready for coating, rust-free for up to 72 hours.
 

 
KTA-Tator, Inc. - Corporate Office
 
New KTA Pipeline Inspection Kit
 
• Defelsko standard memory body
• Positector FTS 0-250 mils, cabled dry film thickness probe
• NEW Positector Shore D hardness probe
• All essential inspection equipment!
Visit www.ktagage.com
 

 
Jotun Paints Inc.
 
Jotun Jotachar 1709
 
Mesh-free passive fire protection epoxy designed to protect against hydrocarbon pool fire scenarios for up to four hours as defined in the ANSI/UL1709 standard.
 

 
DeFelsko Corporation
 
PosiTector SST Soluble Salt Tester
 
Measures the concentration of soluble salts on metal surfaces. Use with all Bresle patch types including the reusable, adhesive-free PosiPatch.
 

 
US Minerals
 
Hit Harder. Clean Faster.
 
Learn more at www.blackdiamondabrasives.com.
 

 
Industrial Vacuum Equipment Corp.
 
Hurricane Vacuums
& Dust Collectors
 
Vacuum and dust collector hose, filters and related accessories.
IndustrialVacuum.com
 

 
Dow Polyurethane Systems
 
The International WorkBoat Show
 
Join us for the 2018 edition of the WorkBoat Show! Held every year in New Orleans, this is the largest commercial marine trade show in North America!
 

 
Blastox/The TDJ Group, Inc.
 
Blastox® - One Step Lead Abatement
 
Sandblast additive delivered to jobsite pre-blended to eliminate hazardous abrasive wastes. Why mix, meter or apply at the job-site? Blast with ease and
Let your painters paint!
1(800)-252-7869
 

 
SABRE Autonomous Solutions
 
Imagine having an operator that takes less time to output more work
 
Once trained, a single operator can easily manage multiple SABRE systems.
 

 
 
 

Technology Publishing Co., 1501 Reedsdale Street, Suite 2008, Pittsburgh, PA 15233

TEL 1-412-431-8300  • FAX  1-412-431-5428  •  EMAIL webmaster@paintsquare.com


The Technology Publishing Network

Durability + Design PaintSquare the Journal of Protective Coatings & Linings Paint BidTracker

 
EXPLORE:      JPCL   |   PaintSquare News   |   Interact   |   Buying Guides   |   Webinars   |   Resources   |   Classifieds
REGISTER AND SUBSCRIBE:      Free PaintSquare Registration   |   Subscribe to JPCL   |   Subscribe to PaintSquare News
MORE:      About PaintSquare.com   |   Privacy Policy   |   Terms & Conditions   |   Support   |   Site Map   |   Search   |   Contact Us