PaintSquare.com
Follow us on Twitter Follow us on LinkedIn Like us on Facebook Follow us on Instagram Visit the TPC Store
Search the site

 

Advertisement

PaintSquare


Coatings Industry News

Main News Page


MI Governor Won't Shut Down Line 5

Wednesday, January 31, 2018

More items for Quality Control
More items from North America

Comment | More

Six weeks after members of Michigan’s Pipeline Safety Advisory Board called on Gov. Rick Snyder to temporarily shut down Enbridge Energy’s Line 5 liquids pipeline under the Straits of Mackinac, the governor has rejected the idea, telling the board an immediate and unexpected shutdown isn’t the proper approach to dealing with the controversial pipeline.

In a letter dated Jan. 26, Snyder addressed the PSAB’s request, noting that while gaps in the pipeline’s protective coating have raised safety concerns, the line did recently pass a high-pressure hydrotest with no problems, and a sudden shutdown could create a propane supply crisis during a winter when home heating fuel shortages are already anticipated.

Line 5 underwater inspection
Enbridge

Gov. Rick Snyder will not immediately shut down Enbridge's Line 5 pipeline under the Straits of Mackinac, despite a call to do so from members of the Michigan Pipeline Advisory Board.

The PSAB met Dec. 11 to discuss Line 5, which has been subject to increased scrutiny over the past year as Enbridge has denied, then later admitted, a number of gaps in the protective coating on the dual pipeline, the only such pipeline that stretches under the Great Lakes. The board, with seven members abstaining, voted to advise an immediate, temporary shutdown of the pipeline; PSAB has the power to advise the governor, but its suggestions are not binding.

Agreement Deadline Extended

Rather than shut down the pipeline, which transports crude oil from Alberta to Sarnia, Ontario, and also moves natural gas liquids including propane throughout Michigan, Snyder opted to keep with the agreement he reached with Enbridge in November, which includes a full risk analysis to be performed on the pipeline. Snyder wrote in his letter last week that the risk analysis may not be finished until mid-September, so he has agreed to extend the deadline for a final decision on the pipeline until Sept. 30; the deadline was originally Aug. 15.

Straits of Mackinac
© iStock.com / Dough4537

Citizens, environmentalists and lawmakers have expressed concerns about the condition of the pipeline, the only one that runs under the Great Lakes.

Other provisions of the agreement include replacing Line 5 under the St. Clair River—an action Enbridge says it is working actively toward—and shutting down Line 5 under the Straits anytime sustained waves of over 8 feet are documented. The pipeline was shut down for a period of about four hours on Dec. 5 because of high waves.

Pipeline Concerns

Enbridge has been under increasing fire over the past year from citizens, activists and lawmakers in Michigan who are concerned about the condition of the 65-year-old dual pipeline under the Straits. In November, Snyder publicly called on Enbridge to be more transparent about the line after a series of revelations of coating damage on the pipes under the Straits.

In February, Enbridge denied reports of coating loss on the pipeline. In March, the company acknowledged that there were areas of coating loss, but that they only affected the outer layer of the coating system.

More recently, it was revealed that there were areas of bare metal on the line under the Straits, and some Enbridge personnel knew about the gaps soon after they were created in 2014, but the company hadn’t acknowledged their existence for three years. In November, Enbridge revealed that, rather than the three gaps in the coating that the company originally reported, there were dozens of areas of bare metal, some larger than one square foot in area.

Enbridge has held that the pipeline’s integrity has never been compromised, citing the recent pressure test as evidence that the coating gaps have not led to any increased risk at this time.

   

Tagged categories: Government; Oil and Gas; Pipeline

Comment Join the Conversation:

Sign in to our community to add your comments.

Advertisements
 
Fischer Technology Inc.
 
FISCHER Expands Corrosion Product Line
 
Rounding out Fischer’s extensive line of products for measuring protective coatings in the corrosion industry is the new ultrasonic wall thickness gauge UMP series.
 

 
KTA-Tator, Inc. - Corporate Office
 
KTA-Tator EH&S Services
 
• Ambient & Worker Exposure Air Monitoring
• Safety & Health Program Development
• Lead Paint Assessments
& Specifications
• Health Hazard & Jobsite Safety Assessments
Call 1-800-532-3633
 

 
DeFelsko Corporation
 
PosiTector SHD Shore Hardness Durometer
 
PosiTector SHD measures the hardness of non-metallic materials. Features a measurement timer, auto ignore mode and internal memory. Shore A or D available.
 

 
Jotun Paints Inc.
 
Jotun Jotachar 1709
 
Mesh-free passive fire protection epoxy designed to protect against hydrocarbon pool fire scenarios for up to four hours as defined in the ANSI/UL1709 standard.
 

 
HoldTight Solutions Inc.
 
Full Surface Protection for Up to One Year
 
HT 365 is a preservation, single component, anti-corrosive coating, a water displacing agent, a lubricant, and a penetrating fluid. It creates an imperceptible thin-film coating that offers excellent salt contaminant and humidity protection. Contact your HoldTight® representative or visit Holdtight.com for more information.
 

 
Absolute Equipment/Grand Rental Station
 
TIER 4 EQUIPMENT
 
We have Tier 4 Equipment including Air Compressors & Generators for Sale & Rent! Your job may now require Tier-4. www.absoluteequip.com or Call 412-931-6655.
 

 
SAFE Systems, Inc.
 
Enduroguard -
The Tough Cable
for a Tough Industry.
 
Reduce maintenance costs and down time, increase job site safety with Enduroguard Cable. Available exclusively from SAFE Systems. UL listed, flexible, abrasion resistant and cut resistant.
 

 
BASF
 
New resins from BASF will have metals loving water!
 
Excellent corrosion resistance, low VOC, high gloss, thin films www.basf.us/industrialcoatings dpsolutions@basf.com 800-231-7868
 

 
Sauereisen, Inc.
 
Substrate Repair Materials
 

Substrate Repair Materials and Filler Compounds

Sauereisen's full line of underlayments are the ideal substrate repair materials to restore structural integrity prior to the application of SewerGard©
 

 
ARC / A.W. Chesterton Company
 
Erosion Resistant Coating
 
It’s high gloss low drag, abrasion resistant surface extends equipment life, improves material flow, enhances equipment efficiency, and reduces downtime.
 

 
 
 

Technology Publishing Co., 1501 Reedsdale Street, Suite 2008, Pittsburgh, PA 15233

TEL 1-412-431-8300  • FAX  1-412-431-5428  •  EMAIL webmaster@paintsquare.com


The Technology Publishing Network

Durability + Design PaintSquare the Journal of Protective Coatings & Linings Paint BidTracker

 
EXPLORE:      JPCL   |   PaintSquare News   |   Interact   |   Buying Guides   |   Webinars   |   Resources   |   Classifieds
REGISTER AND SUBSCRIBE:      Free PaintSquare Registration   |   Subscribe to JPCL   |   Subscribe to PaintSquare News
MORE:      About PaintSquare.com   |   Privacy Policy (Updated 5/24/2018)   |   Terms & Conditions   |   Support   |   Site Map   |   Search   |   Contact Us