Coatings Industry News

Main News Page


NE County Seeking Courthouse Improvements

Thursday, December 14, 2017

Comment | More

Colfax County, Nebraska, is seeking proposals for improvements at its county courthouse.

The pre-bid meeting is scheduled for Jan. 3, 2018, and bids are due Jan. 9.

Scope of Work 

This building is listed on the National Register of Historic places due to its architectural and political significance.  Consequently, extra care must be taken to ensure that all historic features remain undamaged during the construction process.

Ammodramus, Public Domain, via Wikimedia Commons

Colfax County, Nebraska, is seeking proposals for improvements at its county courthouse.

The awarded contractor will first oversee that existing site retaining walls and sidewalks are properly cleaned. Any cracks or fractured joints will require the existing caulking to be removed and replaced. Any damage to concrete will be patched and properly repaired. Following all repairs, the contractor will apply various exterior finishes.

Once the walls and sidewalks have been completed, new code-compliant metal handrails and/or guardrails will be installed by the exiting concrete dock, accessible ramp and concrete stairs located along the retaining walls of the exterior perimeter of the site. These rails will be coated with a protective metals application to avoid future corrosion.

Built between 1921 and 1922, the courthouse was constructed to replace the previous courthouse to accommodate the growing population of Colfax County. The structure itself consists of load-bearing exterior and interior masonry walls, steel frame interior and concrete floors. Designed in the vein of the Beaux-Arts neoclassical architectural style, the courthouse features a symmetrical facade, paired pilasters, terra cotta motifs and corners highlighted by brick quoins.

Since construction, the layout and facade have undergone various improvements and renovations including replacing the original wood entry storefronts with an aluminum system, the installation of a concrete ramp for handicap accessibility in 1980, the replacement of the majority of the courthouse windows and the installation of a new sloped metal roof on top of the existing parapet in 2008.

Commencement of work is expected in spring 2018.

Reported by Paint BidTracker, a construction reporting service devoted to identifying contracting opportunities for the coatings community. Try Paint BidTracker free!

   

Tagged categories: Bidding; Contract awards; Contracts; Government; Government contracts; Jobs; Maintenance + Renovation; North America; Paint BidTracker

Comment Join the Conversation:

Sign in to our community to add your comments.


Advertisements
 
RCG America

 
ABKaelin, LLC

 
Sauereisen, Inc.

 
SABRE Autonomous Solutions

 
Modern Safety Techniques

 
Mitsubishi Gas Chemical America

 
NLB Corporation

 
SAFE Systems, Inc.

 
 
 

Technology Publishing Co., 1501 Reedsdale Street, Suite 2008, Pittsburgh, PA 15233

TEL 1-412-431-8300  • FAX  1-412-431-5428  •  EMAIL webmaster@paintsquare.com


The Technology Publishing Network

PaintSquare the Journal of Protective Coatings & Linings Paint BidTracker

 
EXPLORE:      JPCL   |   PaintSquare News   |   Interact   |   Buying Guides   |   Webinars   |   Resources   |   Classifieds
REGISTER AND SUBSCRIBE:      Free PaintSquare Registration   |   Subscribe to JPCL   |   Subscribe to PaintSquare News
MORE:      About PaintSquare.com   |   Privacy Policy   |   Terms & Conditions   |   Support   |   Site Map   |   Search   |   Contact Us