PaintSquare.com
Follow us on Twitter Follow us on LinkedIn Like us on Facebook Follow us on Instagram Visit the TPC Store
Search the site

 

Advertisement

PaintSquare


Coatings Industry News

Main News Page


Line 5 Halted Briefly Due to Wave Height

Thursday, December 7, 2017

More items for Program/Project Management
More items from North America

Comment | More

Days after entering into an agreement with Michigan Gov. Rick Snyder that includes provisions to shut down its Line 5 pipeline under the Straits of Mackinac during adverse weather conditions, Enbridge Energy did just that Tuesday (Dec. 5), according to state regulators.

On Nov. 28, Enbridge agreed to a number of new practices related to the 64-year-old liquids pipeline, which has come under fire over the past year due to concerns over its stability and the state of its protective coating. In addition to exploring options for the potential replacement of the stretch of twin pipeline that stretches under the Straits, the Canadian firm agreed to shut down operation any time waves reach more than 8 feet.

Mackinac Straits
Bridge Cam image courtesy of Mackinac Bridge Authority

Waves on the Straits of Mackinac reached 9 feet Tuesday and Wednesday, leading Enbridge to shut down its Line 5 underwater pipeline per a new agreement with the state of Michigan.

On Tuesday morning, NOAA weather forecasting indicated waves of about 9 feet, and a gale warning continued through Wednesday. Enbridge reportedly shut down the pipeline for about four hours Tuesday morning and afternoon before resuming operation.

Residents, environmentalists and lawmakers have expressed concerns over the pipeline, especially in light of revelations over the past year regarding the loss of protective coating on some areas of the pipeline under the straits.

A report issued earlier this year by the National Wildlife Federation, authored by former Dow Chemical engineer and fluid dynamics expert Edward Timm, held that “certain sections of the twinned sections of Line 5 under the Straits may be only one peak current event away from catastrophic failure.”

   

Tagged categories: Coating failure; Government; Pipeline; Pipelines

Comment Join the Conversation:

Sign in to our community to add your comments.

Advertisements
 
Novatek Corporation
 
Dustless Coatings Removal
 
Novatek Corporation, Dustless Coatings Removal Strip, clean and profile all dust free! Comply with new lead standards. Contact today: (866) 563-7800 www.Novatekco.com
 

 
Industrial Vacuum Equipment Corp.
 
Hurricane Vacuums
& Dust Collectors
 
Vacuum and dust collector hose, filters and related accessories.
IndustrialVacuum.com
 

 
SAFE Systems, Inc.
 
Portable Dust Collectors for Tough Environments
 
Trailer and skid-mounted models in numerous sizes, powered by electric and/or diesel. Sloped roofs, multiple dust inlets, high static, dampered fans. Lockable power & drive compartments.
 

 
SABRE Autonomous Solutions
 
Safety
 
Removing blasting operators from harmful environments is our key objective.
 

 
KTA-Tator, Inc. - Corporate Office
 
New KTA Pipeline Inspection Kit
 
• Defelsko standard memory body
• Positector FTS 0-250 mils, cabled dry film thickness probe
• NEW Positector Shore D hardness probe
• All essential inspection equipment!
Visit www.ktagage.com
 

 
Absolute Equipment/Grand Rental Station
 
TIER 4 EQUIPMENT
 
We have Tier 4 Equipment including Air Compressors & Generators for Sale & Rent! Your job may now require Tier-4. www.absoluteequip.com or Call 412-931-6655.
 

 
Mitsubishi Gas Chemical America
 
Performance Amine 1,3-BAC
 
A highly reactive cycloaliphatic diamine offering superior performance. Reasonable cost and curing efficacy makes it suitable for all types of epoxy resin applications.
 

 
ARC / A.W. Chesterton Company
 
Corrosion Resistant Coating
 
ARC HT-S incorporates fine graded sizes of reinforcement which contributes to its excellent permeation resistance, resistance to cold-wall delamination, and resistance to thermal-mechanical shock
 

 
Fischer Technology Inc.
 
FISCHER Expands Corrosion Product Line
 
Rounding out Fischer’s extensive line of products for measuring protective coatings in the corrosion industry is the new ultrasonic wall thickness gauge UMP series.
 

 
Bullard
 
Bullard Made in the USA
 
 

 
 
 

Technology Publishing Co., 1501 Reedsdale Street, Suite 2008, Pittsburgh, PA 15233

TEL 1-412-431-8300  • FAX  1-412-431-5428  •  EMAIL webmaster@paintsquare.com


The Technology Publishing Network

Durability + Design PaintSquare the Journal of Protective Coatings & Linings Paint BidTracker

 
EXPLORE:      JPCL   |   PaintSquare News   |   Interact   |   Buying Guides   |   Webinars   |   Resources   |   Classifieds
REGISTER AND SUBSCRIBE:      Free PaintSquare Registration   |   Subscribe to JPCL   |   Subscribe to PaintSquare News
MORE:      About PaintSquare.com   |   Privacy Policy   |   Terms & Conditions   |   Support   |   Site Map   |   Search   |   Contact Us