PaintSquare.com
Follow us on Twitter Follow us on LinkedIn Like us on Facebook Follow us on Instagram Visit the TPC Store
Search the site

 

Advertisement

PaintSquare


Coatings Industry News

Main News Page


Enbridge, MI Plan for Line 5 Changes

Tuesday, December 5, 2017

More items for Quality Control
More items from North America

Comment | More

Canadian energy firm Enbridge entered into an agreement last week with the state of Michigan, promising to evaluate options for replacing its Line 5 liquids pipeline under the Straits of Mackinac and to take action to replace the same line under the St. Clair River.

According to the new agreement, Enbridge will, by next June, evaluate three alternatives for the “eventual” replacement of Line 5 under the Straits: building a new pipeline in a tunnel, installing a new pipeline via horizontal directional drilling, or installing a new pipeline in a trench under the Straits, within some sort of secondary containment structure.

Line 5 inspection
Images: Enbridge Energy

Enbridge will shut the pipeline down under the Straits when weather creates sustained waves of over 8 feet on the body of water.

The agreement does not actually require Line 5’s replacement or put a timeline on the job, but reflects the pressure the state is putting on Enbridge to plan for that outcome.

More immediately, Enbridge says in the agreement that it will shut the pipeline down under the Straits when weather creates sustained waves of over 8 feet on the body of water. A report issued earlier this year by the National Wildlife Federation, authored by former Dow Chemical engineer and fluid dynamics expert Edward Timm, held that “certain sections of the twinned sections of Line 5 under the Straits may be only one peak current event away from catastrophic failure.”

Other Provisions

Enbridge will also begin work on replacing the stretch of Line 5 under the St. Clair River using horizontal directional drilling immediately upon receiving government permits. As part of the agreement, the company says it will increase transparency and coordination with the state regarding the safety of the pipeline.

Line 5 map

Line 5, which itself runs from Wisconsin to Sarnia, Ontario, conveys crude oil and natural gas liquids originating in Alberta to Ontario.

“Business as usual by Enbridge is not acceptable and we are going to ensure the highest level of environmental safety standards are implemented to protect one of Michigan’s most valuable natural resources,” Gov. Rick Snyder said in a press release. “The items required in this agreement are good strides forward. The state is evaluating the entire span of Enbridge’s Line 5 pipeline and its future, but we cannot wait for the analyses to be completed before taking action to defend our waterways.”

Pipeline Controversy

Enbridge has been under increasing fire over the past year from citizens, activists and lawmakers in Michigan who are concerned about the condition of the 64-year-old dual pipeline under the Straits. Last month, Gov. Rick Snyder publicly called on Enbridge to be more transparent about the line after a series of revelations of coating damage on the pipes under the Straits.

In February, Enbridge denied reports of coating loss on the pipeline. In March, the company acknowledged that there were areas of coating loss, but that they only affected the outer layer of the coating system.

More recently, it was revealed that there were areas of bare metal on the line under the Straits, and some Enbridge personnel knew about the gaps soon after they were created in 2014, but the company hadn’t acknowledged their existence for three years. In November, Enbridge revealed that, rather than the three gaps in the coating that the company originally reported, there were dozens of areas of bare metal, some larger than one square foot in area.

Safety Record

Line 5, which originates in Superior, Wisconsin, where several other Enbridge lines terminate, moves crude oil and natural gas liquids to Sarnia, Ontario, via Michigan. According to Enbridge, while much of the crude coming from Alberta goes to refineries in Sarnia, some is also refined in Michigan and Ohio. And it’s not all Canadian oil moving through the pipeline: At points, sweet crude produced in Michigan is pumped into Line 5 to make its way to refineries as well.

Enbridge has held that the pipeline’s integrity has never been compromised. The line has never had a leak in over six decades of service, and this past summer, it passed a pressure test ordered as part of the company’s consent agreement, established after the 2010 spill on its Line 6B.

Enbridge has repeatedly asserted that many of citizens’ and government officials’ concerns about the state of the pipeline have stemmed from misinterpretations of internal documents and procedures.

“We realize our internal technical studies and understanding haven’t translated well into reassuring the public or Michigan leaders about the ongoing safe operation of Line 5,” the company said in a press release on the agreement. “We apologize if our actions sometimes have created confusion.”

   

Tagged categories: Government; Infrastructure; Pipelines

Comment Join the Conversation:

Sign in to our community to add your comments.

Advertisements
 
KTA-Tator, Inc. - Corporate Office
 
New KTA Pipeline Inspection Kit
 
• Defelsko standard memory body
• Positector FTS 0-250 mils, cabled dry film thickness probe
• NEW Positector Shore D hardness probe
• All essential inspection equipment!
Visit www.ktagage.com
 

 
Fischer Technology Inc.
 
Maximize Profits by Monitoring Coating Thickness
 
Learn more by contacting Fischer Technology today: 1.860.683.0781
 

 
Absolute Equipment/Grand Rental Station
 
TIER 4 EQUIPMENT
 
We have Tier 4 Equipment including Air Compressors & Generators for Sale & Rent! Your job may now require Tier-4. www.absoluteequip.com or Call 412-931-6655.
 

 
DeFelsko Corporation
 
PosiTector SST Soluble Salt Tester
 
Measures the concentration of soluble salts on metal surfaces. Use with all Bresle patch types including the reusable, adhesive-free PosiPatch.
 

 
HoldTight Solutions Inc.
 
Full Surface Protection for Up to One Year
 
HT 365 is a preservation, single component, anti-corrosive coating, a water displacing agent, a lubricant, and a penetrating fluid. It creates an imperceptible thin-film coating that offers excellent salt contaminant and humidity protection. Contact your HoldTight® representative or visit Holdtight.com for more information.
 

 
BASF
 
New resins from BASF will have metals loving water!
 
Excellent corrosion resistance, low VOC, high gloss, thin films www.basf.us/industrialcoatings dpsolutions@basf.com 800-231-7868
 

 
SABRE Autonomous Solutions
 
Quality
 
The ALPHA1 provides a consistent finish day-in
day-out; job to job.
 

 
SAFE Systems, Inc.
 
Custom blast rooms
by SAFE Systems
 
Don't waste time and money "making do" with a "standard" design. Let us work with you to design and build the system that best fits your requirements.
Call 1-800-634-7278
 

 
International Bridge Conference
 
Bridge conference 2018
 
Registration for the 2018 IBC is now open! Join us in June for the biggest and best IBC ever! View the Program, Workshops and Exhibitors by clicking in the banner.
 

 
 
 

Technology Publishing Co., 1501 Reedsdale Street, Suite 2008, Pittsburgh, PA 15233

TEL 1-412-431-8300  • FAX  1-412-431-5428  •  EMAIL webmaster@paintsquare.com


The Technology Publishing Network

Durability + Design PaintSquare the Journal of Protective Coatings & Linings Paint BidTracker

 
EXPLORE:      JPCL   |   PaintSquare News   |   Interact   |   Buying Guides   |   Webinars   |   Resources   |   Classifieds
REGISTER AND SUBSCRIBE:      Free PaintSquare Registration   |   Subscribe to JPCL   |   Subscribe to PaintSquare News
MORE:      About PaintSquare.com   |   Privacy Policy   |   Terms & Conditions   |   Support   |   Site Map   |   Search   |   Contact Us