PaintSquare.com
Follow us on Twitter Follow us on LinkedIn Like us on Facebook Follow us on Instagram Visit the TPC Store
Search the site

 

Advertisement

Safway Services


Coatings Industry News

Main News Page


EPA Assesses Wastewater Infrastructure

Friday, January 15, 2016

More items for Program/Project Management
More items from North America

Comment | More

A recent survey by the U.S. Environmental Protection Agency (EPA) suggests that $271 billion is needed to maintain and improve the nation’s wastewater infrastructure over the next five years, the agency announced in a statement Wednesday (Jan. 13).

The EPA worked with states, the District of Columbia, Puerto Rico and other U.S. territories to collect information regarding the pipes that carry wastewater to treatment plants, the technology that treats the water and methods for managing stormwater runoff.

istock/minemero
© iStock.com / minemero

The EPA says it will take $271 billion to maintain and improve the nation’s wastewater infrastructure over the next five years, according to a recent survey.

“The only way to have clean and reliable water is to have infrastructure that is up to the task,” said Joel Beauvais, EPA’s acting deputy assistant administrator for water.

“Our nation has made tremendous progress in modernizing our treatment plants and pipes in recent decades, but this survey tells us that a great deal of work remains,” he added.

Clean Watersheds Needs Survey

As required by Congress, the EPA conducts a Clean Watersheds Needs Survey (CWNS) every four years. The CWNS provides a comprehensive assessment of the capital costs (or needs) to meet the water quality goals of the Clean Water Act (CWA) and address water quality and water quality-related public health concerns.

It collects information on:

  • Publicly owned wastewater collection and treatment facilities;
  • Stormwater and combined sewer overflows control facilities;
  • Nonpoint source pollution control projects; and
  • Decentralized wastewater management.

Study participants submit project proposals that include a description and location of a water quality-related public health problem, a site-specific solution and detailed information on project cost.

The national and state needs are then compiled in a report to Congress and used by that body and state legislatures in their budgeting efforts.

Survey Findings

From the data collected, the EPA has determined that, to address infrastructure projects needed within five years, $271 billion in funding would be required.

istock/Cylonphoto
© iStock.com / Cylonphoto

Every four years, the EPA provides a comprehensive assessment of the capital costs (or needs) to meet the water quality goals of the Clean Water Act and address water quality and water quality-related public health concerns.

The agency notes that $51.2 billion would be needed to rehabilitate and repair existing conveyance systems, while another $44.5 billion would be targeted to the installation of new sewer collection and conveyance systems, interceptor sewers and pumping stations.

Another $6.1 billion would be slated for the billion for conveyance, distribution and further treatment of wastewater for reuse.

The planning and implementation of structural and nonstructural measures to control polluted runoff from storm events would call for $19.2 billion.

In order to prevent periodic discharges of mixed stormwater and untreated wastewater during wet-weather events, $48 billion would be needed for combined sewer overflow correction.

For wastewater treatment, $52.4 billion would go toward meeting secondary treatment standards (using biological processes to meet the minimum level of treatment required by law), and $49.6 billion would help provide upgrades so treatment plants can provide a more advanced level of treatment and protection (treating for nonconventional or toxic pollutants such as nitrogen, phosphorus, ammonia or metals).

Wastewater infrastructure improvements such as these, the EPA notes, not only promote a healthy ecosystem, but also support healthy economies as construction projects create good-paying jobs and, where new facilities are built, workers are needed to operate and maintain them.

Financing Strategies

To help states and communities identify innovative financing strategies for drinking water, wastewater and stormwater infrastructure projects, the EPA launched the Water Infrastructure and Resiliency Finance Center in January 2015.

istock/tsz01
© iStock.com / tsz01

Wastewater infrastructure improvements also support healthy economies as construction projects create jobs and new facilities require workers to operate and maintain them, EPA says.

The center recently selected regional Environmental Finance Centers to help communities across the country develop sustainable funding solutions to meet environmental goals.

This financial expertise and technical assistance serves to help communities make informed funding decisions for resilient infrastructure projects that best meet local needs.

The EPA also offers financial assistance to address the types of infrastructure needs covered in the CWNS.

The Clean Water State Revolving Fund has provided more than $111 billion in low-interest loans since its inception in 1987, with $5.8 billion in fiscal year 2015 alone.

Grant funding is also available through the Alaska Native Villages and Rural Communities program, the Clean Water Indian Set-Aside and the U.S.-Mexico Border Water Infrastructure program.

According to the agency, the average American receives a much higher level of wastewater treatment today compared to 1972, when the CWA was passed.

Between 1972 and 2012, the U.S. population receiving secondary treatment increased from about 75 million to 90 million, and the population receiving advanced treatment increased from 7.8 million to 127 million.

Over the same period, the population receiving less-than-secondary treatment decreased from almost 60 million to 4.1 million. This has resulted in dramatic improvements in the waterways receiving discharges from these treatment plants.

   

Tagged categories: Environmental Protection Agency (EPA); Funding; Infrastructure; Pipeline; Pipes; Waste Processing Plant; Wastewater Plants; Water Tanks

Comment Join the Conversation:

Sign in to our community to add your comments.

Advertisements
 
Industrial Vacuum Equipment Corp.
 
Hurricane Vacuums
& Dust Collectors
 
Vacuum and dust collector hose, filters and related accessories.
IndustrialVacuum.com
 

 
Novatek Corporation
 
Dustless Coatings Removal
 
Novatek Corporation, Dustless Coatings Removal Strip, clean and profile all dust free! Comply with new lead standards. Contact today: (866) 563-7800 www.Novatekco.com
 

 
SAFE Systems, Inc.
 
SAFE Systems'
Blast Lights &
Deadman Switches
 
Halogen or LED blast lights available with our NEW urethane bumper. Switches available in many colors for color coding your hoses.
 

 
SABRE Autonomous Solutions
 
Imagine having an operator that takes less time to output more work
 
Once trained, a single operator can easily manage multiple SABRE systems.
 

 
Sauereisen, Inc.
 
Substrate Repair Materials
 

Substrate Repair Materials and Filler Compounds

Sauereisen's full line of underlayments are the ideal substrate repair materials to restore structural integrity prior to the application of SewerGard©
 

 
Tarps manufacturing, Inc.
 
QUALITY MADE IN AMERICA —Available near you!
 
CLICK to get a behind-the-scenes look at how Tarps Manufacturing makes the highest-quality tarps right here in the USA — available nationwide.
 

 
SEMicro Division, M.E. Taylor Engineering, Inc.
 
Stop Guessing the Classification Rating of Your Cross Hatch Adhesion Testing Results
 
SEMicro's newly-patented Adhesion Testing Analyzer takes the guesswork out of cross hatch tape adhesion testing standards such as ASTM D3359 and ISO 2409.
 

 
Graco Inc.
 
Graco EcoQuip 2: Experience the Difference
 
While others claim their equipment is the same, none of them compare to Graco’s EcoQuip 2™ Vapor Abrasive® blasting line. Visit graco.com/ecoquip to learn more.
 

 
Carboline Company
 
New product: Carbozinc® 608 HB
 
Introducing a new high build zinc-rich primer that can save you time and money by eliminating the epoxy intermediate coat!
 

 
Bullard
 
Bullard Made in the USA
 
 

 
 
 

Technology Publishing Co., 1501 Reedsdale Street, Suite 2008, Pittsburgh, PA 15233

TEL 1-412-431-8300  • FAX  1-412-431-5428  •  EMAIL webmaster@paintsquare.com


The Technology Publishing Network

Durability + Design PaintSquare the Journal of Protective Coatings & Linings Paint BidTracker

 
EXPLORE:      JPCL   |   PaintSquare News   |   Interact   |   Buying Guides   |   Webinars   |   Resources   |   Classifieds
REGISTER AND SUBSCRIBE:      Free PaintSquare Registration   |   Subscribe to JPCL   |   Subscribe to PaintSquare News
MORE:      About PaintSquare.com   |   Privacy Policy   |   Terms & Conditions   |   Support   |   Site Map   |   Search   |   Contact Us