Supporting the Troops: Complex Strategy Worked for Repainting Ft. Lewis Water Tank
From JPCL, June 2010
By Susan Drozdz, U.S. Army Engineer Research and Development Center, with contributions from Mike Hasbrook, Washington Industrial Coatings
by Susan Drozdz, U.S. Army Engineer Research and Development Center, with contributions from Mike Hasbrook, Washington Industrial Coatings | |
![]() |
In this photo essay, the authors depict the maintenance painting of a 200,000-gallon elevated steel water storage tank with an existing lead-bearing primer located in the middle of the residential area at the Fort Lewis, WA, military base....
|