Delays were not an option during the coating of the interior and exterior of 276 pipe sections for a new three-mile-long, treated water transmission main in British Columbia, Canada. This article explains how fast-set exterior coatings and interior linings helped coating contractors efficiently comp...
Delays were not an option during the coating of the interior and exterior of 276 pipe sections for a new three-mile-long, treated water transmission main in British Columbia, Canada. This article explains how fast-set exterior coatings and interior linings helped coating contractors efficiently comp...
This article recaps the repainting of the Ohio Street Lift Bridge in Buffalo, New York, which required extra coordination to allow both tourist and industrial boat traffic under the bridge to pass through uninterrupted—and how a father-son contractor duo came full-circle, with both having rehabbed t...
This article recaps the repainting of the Ohio Street Lift Bridge in Buffalo, New York, which required extra coordination to allow both tourist and industrial boat traffic under the bridge to pass through uninterrupted—and how a father-son contractor duo came full-circle, with both having rehabbed t...