PaintSquare.com
Follow us on Twitter Follow us on LinkedIn Like us on Facebook Follow us on Instagram
Search the site

 

 

News (11)


Refinery Faces $720K in EPA Fines

Six years after a deadly explosion at a Washington state refinery, the federal agency responsible for protecting human health and the environment has filed a complaint against the Tesoro Ref...


Asbestos Pipe Work Leads to Guilty Plea

The improper removal and disposal of asbestos during pipeline work led a 60-year-old Kennard, TX, man to admit guilt for federal environmental violations, U.S. Attorney John M. Bales announc...


Pipe Plant Settles Lead Issues with EPA

A now defunct pipe production plant will pay almost $1 million dollars and take steps to lower its lead emissions in an agreement with the Environmental Protection Agency.


Coating Makers Seek Delay on Risk RFI

Calling the data demands too much and too soon, U.S. paint and coating makers have requested three additional months to produce information on their risk-management plans for chemical releas...


Asbestos to Land Contractor in Prison

Six months in prison, followed by six months of house arrest, and a $10,000 fine await a South Carolina renovation company owner who contaminated a beach and oceanfront properties with asbes...


DuPont Accepts $800K EPA Fine

Coatings chemical giant DuPont has agreed to pay an $800,000 fine and add several programs to settle long-running federal allegations of air-pollution violations at its massive Washington Wo...


Arrest at EPA Sparks Call for Probe

A former top-ranking Environmental Protection Agency official has been charged with skimming nearly $900,000 from the agency over more than a decade—and a U.S. senator wants to know just how...


EPA Adds Time to Comply with Tank Rule

Facilities that use oil and gas storage tanks are getting a reprieve on their October deadline to install emissions controls.


EPA: Plants Ducked Years of Permits

Federal regulators have filed suit against Oklahoma Gas and Electric, alleging that the utility ignored permit laws for more than $60 million in power plant upgrades that date back a decade.


Plant Changes to Cost CEMEX $3M+

The largest U.S. producer of cement and ready-mix concrete will pay more than $3 million to settle long-running federal allegations that it illegally modified a cement plant near Rocky Mount...


EPA Rule Could Put Out 15 GA Plants

More than a dozen power plants in Georgia could be out of commission soon after the approval of a new federal rule regulating mercury and toxic air goes into effect.


 
 
   

**Commercial white papers, product videos, and other sponsored documents posted on this site are paid content from third-party companies; inclusion and posting on this site does not imply an endorsement nor recommendation of the content by Technology Publishing/PaintSquare. By signing in and viewing or downloading this paid content, you agree to make your name and full contact information available to the sponsor of the content.

Advertisements
 
SABRE Autonomous Solutions
 
Safety, Productivity, Quality. Robotic Blasting
 
Learn how this simple to use, field deployed, automatic robot is eliminating hazards in major confined, cluttered and complex surface preparation projects.
 

 
SAFE Systems, Inc.
 
SAFE Systems'
Blast Lights &
Deadman Switches
 
Halogen or LED blast lights available with our NEW urethane bumper. Switches available in many colors for color coding your hoses.
 

 
SEMicro Division, M.E. Taylor Engineering, Inc.
 
Coatings Adhesion Testers
 
The PATTI® accurately measures the bond strength between coating & substrate. Outfitted properly, the surface can be rough, porous, or curved & >10K psi strong!
 

 
Detail Masters
 
Overspray Removal
 
We offer professional, turnkey service and unparalleled quality!
Our process can save hundreds— even thousands of dollars. It's fast, environmentally safe and 100% guaranteed.
 

 
Axxiom Manufacturing
 
Schmidt Introduces
the New miniBRS
 
Reduced in size, it is incredibly easy to maneuver and operate! The perfect alternative to larger blast & recovery units when project space is limited.
Call 1-800-231-2085
 

 
DRYCO
 
Humidity & Temperature Control Equipment
 
Rental Desiccant Dehumidifiers, ArcticDRY Units, Air Conditioners, Heaters and Generators to help control the climate on your next industrial painting project. Nationwide locations, 24/7 service: (866) 379-2600 www.drycogroup.com”
 

 
Clemco Industries Corp.
 
Maximum Dust Suppression Systems Start at $14,950
 
The system comprises proven technology and equipment with user-friendly flexibility in mind. See it in action.
 

 
Novatek Corporation
 
Novatek Corporation, Dustless Coatings Removal
 
Strip, clean and profile all dust free! Comply with new lead standards. Contact today: (866) 563-7800
 

 
Advanced Recycling Systems
 
ADVANCED RECYCLING SYSTEMS (ARS)
 
Recycling Machines, Dust Collectors, Rapid Deployment units are time-tested and approved for the rugged industrial environment. Contact ARS today!
(330)536-8210
 

 
DeFelsko Corporation
 
PosiTector SHD Shore Hardness Durometer
 
PosiTector SHD measures the hardness of non-metallic materials. Features a measurement timer, auto ignore mode and internal memory. Shore A or D available.
 

 

Technology Publishing Co., 2100 Wharton Street, Suite 310, Pittsburgh PA 15203-1951

TEL 1-412-431-8300  • FAX  1-412-431-5428  •  EMAIL webmaster@paintsquare.com


The Technology Publishing Network

Durability + Design PaintSquare the Journal of Protective Coatings & Linings Paint BidTracker

 
EXPLORE:      JPCL   |   PaintSquare News   |   Interact   |   Buying Guides   |   Webinars   |   Resources   |   Classifieds
REGISTER AND SUBSCRIBE:      Free PaintSquare Registration   |   Subscribe to JPCL   |   Subscribe to PaintSquare News
MORE:      About PaintSquare.com   |   Privacy policy   |   Terms & conditions   |   Site Map   |   Search   |   Contact Us