PaintSquare.com
      | Connect Follow us on Twitter Like us on Facebook
About | Subscribe | Advertise
  

 

 

Poll (10)


The Keystone XL pipeline project is back on hold after a presidential veto, while the State Department reviews the project again. No action date has been set. What should happen next?


Five mega-projects are competing for ASCE’s Outstanding Civil Engineering Achievement Award. Which gets your vote?


Who, in your experience, is usually the weakest link in the project team?


What, in your experience, is the top cause of coating project failures?


What type of information/articles in Durability + Design Magazine would be of most value to you?


What do you think is the most effective way to prevent or resolve project disputes?


The U.S. has removed limits on the value of contracts that may be set aside for women-owned small businesses. Do you think this is a good move?


Overall, who do you think makes the better managers on construction projects?


Where do you turn first when you encounter a significant problem on a coatings project?


Half of Massachusetts’ bridge and highway projects are completed late—many of them, years late, a new report shows. In your experience, what is the chief cause of project delays?


 
 
   

**Commercial white papers, product videos, and other sponsored documents posted on this site are paid content from third-party companies; inclusion and posting on this site does not imply an endorsement nor recommendation of the content by Technology Publishing/PaintSquare. By signing in and viewing or downloading this paid content, you agree to make your name and full contact information available to the sponsor of the content.

Sherwin-Williams
Heat-FLex® Hi-Temp 1200

Improved Corrosion
Resistance
Enhanced Durability
Faster Shop Throughput


Bullard

The Next Generation
of Blasting

• Lightest
• Coolest
• Most Comfortable
• Most Dependable


CS Unitec
Surface Prep & Material Removal

CS Unitec’s Floor Planers remove coatings & corrosion from concrete & metal surfaces. Produce keyed profiles for waterproofing applications. info@csunitec.com


U.S. Zinc
Historic Reliability. Innovative Performance.

As an industry leader with an established global footprint, we provide the products that prolong the life your paints and coatings. U.S. Zinc – Helping the world work™


Polyval Coatings
Polyflex® Polyurea Linings

Polyflex ™ new Polyurea Geotextile Membrane System has been specifically engineered to protect the environment in containment applications.
www.polyflexlinings.com


Axxiom Manufacturing
Schmidt Improves
Portable Blasters

Schmidt's VBS System reduces blowdown intensity, prevents exhaust from damaging floor while using no screens or filters. Reduces sound; Increasing safety.
Call 1-800-231-2085


Atlantic Design, Inc.
OUR INDUSTRY IS CHANGING!

We should know. We’re the ones leading the way. Cleverly simple. Clearly ADI. 866.Call.ADI


KTA-Tator, Inc. - Corporate Office
KTA Analyzes
Coating Failures

• Field Diagnosis
• Lab Diagnosis
• Determination of Cause
• Recommendations
www.kta.com
800-245-6379


Wasser High-Tech Coatings Inc.
Wasser Coatings Protect

Wasser Coatings offer a complete range of Moisture Cure Urethane (NEPCOAT approved) systems in addition to Polyurea membranes and linings(NSF).
www.wassercoatings.com

 
Technology Publishing

The Technology Publishing Network

The Journal of Protective Coatings & Linings (JPCL) PaintSquare
Durability + Design Paint BidTracker

 
EXPLORE:      JPCL   |   PaintSquare News   |   Interact   |   Buying Guides   |   Webinars   |   Resources   |   Classifieds
REGISTER AND SUBSCRIBE:      Free PaintSquare Registration   |   Subscribe to JPCL   |   Subscribe to PaintSquare News
MORE:      About PaintSquare.com   |   Privacy policy   |   Terms & conditions   |   Site Map   |   Search   |   Contact Us
 

© Copyright 2000-2015, Technology Publishing / PaintSquare, All rights reserved
2100 Wharton Street, Suite 310, Pittsburgh PA 15203-1951; Tel 1-412-431-8300; Fax 1-412-431-5428; E-mail webmaster@paintsquare.com