PaintSquare.com
      | Connect Follow us on Twitter Like us on Facebook
About | Subscribe | Advertise
  

 


C510-07 Double Check Valve Backflow Prevention Assembly

All Standards | AWWA Standards
Search Standards


Click to Purchase and Download this Standard or Test Method

Revision Date:
Updated On: October 22, 2013
Editorial Change:
 
This standard covers the double check valve backflow prevention assembly. The assembly shall be for operation on hot or cold water lines and capable of withstanding a working water pressure of at least 150 psi (1,034 kPa) without damage to working parts or impairment of function. This standard covers hot and cold water double check valve backflow prevention assemblies. All assemblies shall be designed to operate at a minimum temperature range of 33 degrees F to 140 degrees F (1 degree C to 60 degrees C). Hot water assemblies shall be designed to, at a minimum, operate in water at a temperature range of 33 degrees F to 180 degrees F (1 degree C to 82 degrees C). A complete assembly consists of two internally loaded, independently operating check valves, located between two tightly closing resilient-seated shutoff valves, with four properly placed resilient-seated test cocks.

(Back to all Standards)

 
   

Sidewinder/Persyst Enterprises, Inc.
The Sidewinder Model M2 Solvent Recycler

Combat the rising cost of gunwash, thinners, acetone & more while drastically reducing waste disposal coat.


BASF
New resins from BASF will have metals loving water:

Excellent corrosion resistance, low VOC, high gloss, thin films basf.us/industrialcoatings
polyorders@basf.com
800-231-7868


Nationwide Overspray
Profession Overspray Removal Services

The Finest Name in Safe Overspray Removal. We specialize in removing all contaminants from any surface. Family Owned and Operated for 33 years! Fully insured. Satisfaction is guaranteed.


SABRE Autonomous Solutions
Safety, Productivity, Quality. Robotic Blasting

Learn how this simple to use, field deployed, automatic robot is eliminating hazards in major confined, cluttered and complex surface preparation projects.


Monti Tools, Inc.
BRISTLE BLASTER® - THE ORIGINAL ONE

Surface cleanliness of SSPC-10 | Anchor profile
up to 4.7 mils | Removes corrosion & coatings |
ATEX approved for zone 1
| www.monti.com | 832-623-7970


Novatek Corporation
Novatek Corporation, Dustless Coatings Removal

Strip, clean and profile all dust free! Comply with new lead standards. Contact today: (866) 563-7800


Atlantic Design, Inc.
BUILDING INNOVATION, NOT IMITATION

The smallest version of our Blast Vacuum Recyclers, this ADI 2300CFM 2-Pot is a cleverly designed power package for those smaller jobs. 866.Call.ADI


CHLOR*RID International Inc.
HOLD*BLAST: Buy time for pennies per sq ft.

* Stop flash rust
* Vapor blasting
* Wet blasting
* UHP water jetting
* No residue


Bullard

The Next Generation
of Blasting

• Lightest
• Coolest
• Most Comfortable
• Most Dependable


WINOA Group
W Abrasives - Surf Prep Pack

Experts in surface preparation are not working only on greens. To discover the SURF PREP PACK dedicated to experts. Visit our website, www.wabrasives.com.

 
 
 
Technology Publishing

The Technology Publishing Network

The Journal of Protective Coatings & Linings (JPCL) PaintSquare
Durability + Design Paint BidTracker

 
EXPLORE:      JPCL   |   PaintSquare News   |   Interact   |   Buying Guides   |   Webinars   |   Resources   |   Classifieds
REGISTER AND SUBSCRIBE:      Free PaintSquare Registration   |   Subscribe to JPCL   |   Subscribe to PaintSquare News
MORE:      About PaintSquare.com   |   Privacy policy   |   Terms & conditions   |   Site Map   |   Search   |   Contact Us
 

© Copyright 2000-2016, Technology Publishing / PaintSquare, All rights reserved
2100 Wharton Street, Suite 310, Pittsburgh PA 15203-1951; Tel 1-412-431-8300; Fax 1-412-431-5428; E-mail webmaster@paintsquare.com