PaintSquare.com
      | Connect Follow us on Twitter Like us on Facebook
About | Subscribe | Advertise
  

 


SP0110-2010 SP0110-2010 Wet Gas Internal Corrosion Direct Assessment Methodology for Pipelines

All Standards | NACE Standards
Search Standards


Click to Purchase and Download this Standard or Test Method

Revision Date: January 25, 2011
Updated On: July 22, 2012
Editorial Change:
 
Formalizes the process of internal corrosion direct assessment (ICDA) for pipelines carrying natural gas with condensed water, or with water and liquid hydrocarbons, termed wet gas internal corrosion direct assessment (WG-ICDA). The two primary purposes of the WG-ICDA method are (1) to enhance the assessment of internal corrosion in natural gas pipelines, and (2) to improve pipeline integrity. This standard covers the four components of ICDA: Preassessment, Indirect Inspection, Detailed Examination, and Postassessment.

(Back to all Standards)

 
   

Industrial Vacuum Equipment Corp.
Hurricane Vacuums
& Dust Collectors

Vacuum and dust collector hose, filters and related accessories.
IndustrialVacuum.com


Novetas Solutions
Abrasive Blasting near or over water?

100% Recycled Glass! NO Arsenic, Beryllium or other Toxic Metals! Great White Metal Finish and Safer than Slags! Call us at 866-775-6226


SABRE Autonomous Solutions
Safety, Productivity, Quality. Robotic Blasting

Learn how this simple to use, field deployed, automatic robot is eliminating hazards in major confined, cluttered and complex surface preparation projects.


Novatek Corporation
Novatek Corporation, Dustless Coatings Removal

Strip, clean and profile all dust free! Comply with new lead standards. Contact today: (866) 563-7800


SAFE Systems, Inc.
Custom blast rooms
by SAFE Systems

Don't waste time and money "making do" with a "standard" design. Let us work with you to design and build the system that best fits your requirements.
Call 1-800-634-7278


NLB Corporation
NLB Sure Shroud: Greater Protection and Flexibility

NLB’s Sure Shroud’s lighter weight and flexibility reduces operator fatigue and offers unmatched protection against high pressure hose ruptures. 10k to 40k psi rated.


Axxiom Manufacturing
Schmidt Introduces
the New miniBRS

Reduced in size, it is incredibly easy to maneuver and operate! The perfect alternative to larger blast & recovery units when project space is limited.
Call 1-800-231-2085


Montipower, Inc.
The MBX Bristle Blaster

Get a 2.7 to 3.3 mil profile and a Near White Metal Clean. For info visit www.mbxit.com or call 877 629-8777


WINOA Group
W Abrasives - Surf Prep Pack

Experts in surface preparation are not working only on greens. To discover the SURF PREP PACK dedicated to experts. Visit our website, www.wabrasives.com.


Absolute Equipment/Grand Rental Station
TIER 4 EQUIPMENT

We have Tier 4 Equipment including Air Compressors & Generators for Sale & Rent! Your job may now require Tier-4. www.absoluteequip.com or Call 412-931-6655.

 
 
 
Technology Publishing

The Technology Publishing Network

The Journal of Protective Coatings & Linings (JPCL) PaintSquare
Durability + Design Paint BidTracker

 
EXPLORE:      JPCL   |   PaintSquare News   |   Interact   |   Buying Guides   |   Webinars   |   Resources   |   Classifieds
REGISTER AND SUBSCRIBE:      Free PaintSquare Registration   |   Subscribe to JPCL   |   Subscribe to PaintSquare News
MORE:      About PaintSquare.com   |   Privacy policy   |   Terms & conditions   |   Site Map   |   Search   |   Contact Us
 

© Copyright 2000-2016, Technology Publishing / PaintSquare, All rights reserved
2100 Wharton Street, Suite 310, Pittsburgh PA 15203-1951; Tel 1-412-431-8300; Fax 1-412-431-5428; E-mail webmaster@paintsquare.com