PaintSquare.com
Follow us on Twitter Follow us on LinkedIn Like us on Facebook Follow us on Instagram Visit the TPC Store
Search the site

 


C304-07 Design of Prestressed Concrete Cylinder Pipe

All Standards | AWWA Standards
Search Standards


Click to Purchase and Download this Standard or Test Method

Revision Date: November 01, 2007
Updated On: October 22, 2013
Editorial Change:
 
This standard defines the methods to be used in the structural design of buried prestressed concrete cylinder pipe under internal pressure. These methods are provided for the design of pipe subjected to the effects of working, transient, and field-test load and internal pressure combinations. The design procedures of this standard are applicable to lined-cylinder pipe having inside diameters of 16in. through 60 in. (410 mm through 1,520 mm) and to embedded-cylinder pipe having inside diameters of 24 in. (610 mm) and larger. Topics covered include: loads and internal pressures; load and internal-pressure combinations; moments and thrusts; design material properties; stresses from prestressing; criteria for limit-state loads and pressures; and, calculation of limit-state loads and pressures.

(Back to all Standards)

 
   
Advertisements
 
DeFelsko Corporation
 
PosiTest LPD Low voltage Pinhole Detector
 
Uses a wet sponge to detect holidays, pinholes and other discontinuities on metal and concrete substrates. Easy to use ergonomic design and 4 voltage outputs.
 

 
Montipower, Inc.
 
The MBX Bristle Blaster
 
Get a 2.7 to 3.3 mil profile and a Near White Metal Clean. For info visit www.mbxit.com or call 877 629-8777
 

 
CHLOR*RID International Inc.
 
SOLUTIONS THAT WORK
 
Companies that invest in corrosion control use CHLOR RID products
  • Soluble salt removal liquid
  • Test kits to verify contamination levels
  • Surface passivation to hold the blast
INFO@CHLOR-RID.COM 800.422.3217
 

 
Industrial Vacuum Equipment Corp.
 
Hurricane Vacuums
& Dust Collectors
 
Vacuum and dust collector hose, filters and related accessories.
IndustrialVacuum.com
 

 
Clemco Industries Corp.
 
Maximum Dust Suppression Systems Start at $14,950
 
The system comprises proven technology and equipment with user-friendly flexibility in mind. See it in action.
 

 
SSPC: The Society for Protective Coatings
 
http://www.sspc.org/
 
Join SSPC and Enhance
Your Career !
 

 
Absolute Equipment/Grand Rental Station
 
TIER 4 EQUIPMENT
 
We have Tier 4 Equipment including Air Compressors & Generators for Sale & Rent! Your job may now require Tier-4. www.absoluteequip.com or Call 412-931-6655.
 

 
Axxiom Manufacturing
 
Revolutionary Units
 
By integrating Schmidt's Aftercoolers with our blast pots, these systems remove moisture from air and minimize equipment footprint on jobsite.
Call 1-800-231-2085
 

 
Termarust Technologies
 
Termarust (HR CSA) Chemically Stops
Active Corrosion
 
Arch truss treated with Termarust's (HR CSA) in 2003. This steel arch bridge is rust free on all surfaces including the crevice corroded joints and connections.
 

 
Aggreko
 
Dehumidification, Power and Temperature Control Rentals
 
Aggreko offers rental solutions for your painting/coating project. Dehumidifiers, cooling, heating, power and 24/7 service, nationwide.
844-433-9802
 

 
 
 

Technology Publishing Co., 1501 Reedsdale Street, Suite 2008, Pittsburgh, PA 15233

TEL 1-412-431-8300  • FAX  1-412-431-5428  •  EMAIL webmaster@paintsquare.com


The Technology Publishing Network

Durability + Design PaintSquare the Journal of Protective Coatings & Linings Paint BidTracker

 
EXPLORE:      JPCL   |   PaintSquare News   |   Interact   |   Buying Guides   |   Webinars   |   Resources   |   Classifieds
REGISTER AND SUBSCRIBE:      Free PaintSquare Registration   |   Subscribe to JPCL   |   Subscribe to PaintSquare News
MORE:      About PaintSquare.com   |   Privacy policy   |   Terms & conditions   |   Site Map   |   Search   |   Contact Us