PaintSquare.com
Follow us on Twitter Follow us on LinkedIn Like us on Facebook Follow us on Instagram Visit the TPC Store
Search the site

 


D7167 Standard Guide for Establishing Procedures to Monitor the Performance of Safety-Related Coating Service Level III Lining Systems in an Operating Nuclear Power Plant

All Standards | ASTM Standards
Search Standards


Click to Purchase and Download this Standard or Test Method

Revision Date: February 25, 2013
Updated On: March 26, 2013
Editorial Change:
 
Establishment of an in-service linings monitoring program permits planning and prioritization of lining maintenance work as needed to maintain lining integrity and performance in nuclear Coating Service Level III systems. Refer to ASTM MNL-8, Manual on Maintenance Coatings for Nuclear Power Plants,7 and Guide D7230, which provides guidance for selecting lining materials for new construction or maintenance of safety-related lining systems.

A linings monitoring program enables early identification and detection of potential problems in lining systems. Some Coating Service Level III lining systems may be known in advance to be suspect, deficient, or degraded. Monitoring lining performance will assist in developing follow-up procedures to resolve any significant deficiency relative to lining work.

Degraded linings may generate debris under normal operation and testing or during upset conditions that could adversely affect the performance of safety-related systems. In most cases, the consequence of the debris generation is flow blockage, essential heat transfer reduction, or both; ultimately leading to degradation of equipment or system performance. A linings monitoring program may be required to fulfill licensing commitments for Coating Service Level III lining work.

This guide covers procedures for establishing a program to monitor the performance of Coating Service Level III lining (and coating) systems in operating nuclear power plants. Monitoring is an ongoing process of evaluating the condition of the in-service lining systems.

It is the intent of this guide to provide a recommended basis for establishing a linings monitoring program, not to mandate a singular basis for all programs. Variations or simplifications of the program described in this guide may be appropriate for any given operating nuclear power plant depending on its licensing commitments. Similar guidelines may be applicable for certain Coating Service Level II applications such as fluid immersion systems.

(Back to all Standards)

 
   
Advertisements
 
Advanced Recycling Systems
 
ARS C-Class Recyclers
 
World leading abrasive blast recycling systems in a compact size. Quality, performance, savings… www.arsrecycling.com 330.536.8210
 

 
Axxiom Manufacturing
 
Schmidt Introduces
the New miniBRS
 
Reduced in size, it is incredibly easy to maneuver and operate! The perfect alternative to larger blast & recovery units when project space is limited.
Call 1-800-231-2085
 

 
Abrasives Inc.
 
Discover the MAGIC.
 
Black Magic® coal slag. It’s consistent, cleaner, cuts better, less dust. Get it where you need it, when you need it. Abrasives Inc. info@abrasivesinc.com
 

 
International WorkBoat Show
 
Power Forward
 
Join us Nov. 29 – Dec. 1 in New Orleans for the 2017 International WorkBoat Show. If it can power your business forward, you’ll find it here. Register Now!
 

 
Atlantic Design, Inc.
 
ENGINEERING SOLUTIONS, NOT EXCUSES
 
See our website for features of our best seller, the ADI 3500CFM 4-Pot Blast Vacuum Recycler. A smaller package with all the ADI power you need. 866.Call.ADI
 

 
Tnemec Company, Inc.
 
Online Coating Courses from Tnemec
 
For decades, Tnemec has offered its expertise to clients presenting face-to-face coatings courses. Now, these presentations are available to anyone for CEUs at Tnemec University.
 

 
Sherwin-Williams
 
Sherwin-Williams General Polymers Resinous Flooring App
 
Our coatings and linings expertise available 24/7, allowing you to explore the Sherwin-Williams systems best suited for your flooring needs. Android Users Click here to Download the app today!
 

 
Aggreko
 
Dehumidification, Power and Temperature Control Rentals
 
Aggreko offers rental solutions for your painting/coating project. Dehumidifiers, cooling, heating, power and 24/7 service, nationwide.
844-433-9802
 

 
Absolute Equipment/Grand Rental Station
 
TIER 4 EQUIPMENT
 
We have Tier 4 Equipment including Air Compressors & Generators for Sale & Rent! Your job may now require Tier-4. www.absoluteequip.com or Call 412-931-6655.
 

 
NLB Corporation
 
NLB Sure Shroud: Greater Protection and Flexibility
 
NLB’s Sure Shroud’s lighter weight and flexibility reduces operator fatigue and offers unmatched protection against high pressure hose ruptures. 10k to 40k psi rated.
 

 
 
 

Technology Publishing Co., 1501 Reedsdale Street, Suite 2008, Pittsburgh, PA 15233

TEL 1-412-431-8300  • FAX  1-412-431-5428  •  EMAIL webmaster@paintsquare.com


The Technology Publishing Network

Durability + Design PaintSquare the Journal of Protective Coatings & Linings Paint BidTracker

 
EXPLORE:      JPCL   |   PaintSquare News   |   Interact   |   Buying Guides   |   Webinars   |   Resources   |   Classifieds
REGISTER AND SUBSCRIBE:      Free PaintSquare Registration   |   Subscribe to JPCL   |   Subscribe to PaintSquare News
MORE:      About PaintSquare.com   |   Privacy policy   |   Terms & conditions   |   Site Map   |   Search   |   Contact Us