PaintSquare.com


The First Word in Protective & Marine Coatings

A Product of Technology Publishing / PaintSquare
JPCL | PaintSquare News | Durability + Design | Paint BidTracker


1910-120.120 App C Compliance Guidelines

All Standards | OSHA Standards
Search Standards


Click to Purchase and Download this Standard or Test Method

Revision Date:
Updated On: May 17, 2005
Editorial Change:
 
Occupational Safety and Health Program. Each hazardous waste site clean-up effort will require a site specific occupational safety and health program headed by the site coordinator or the employer's representative. The purpose of the program will be the protection of employees at the site and will be an extension of the employer's overall safety and health program work. The program will need to be developed before work begins on the site and implemented as work proceeds as stated in paragraph (b). The program is to facilitate coordination and communication of safety and health issues among personnel responsible for the various activities which will take place at the site. It will provide the overall means for planning and implementing the needed safety and health training and job orientation of employees who will be working at the site. The program will provide the means for identifying and controlling worksite hazards and the means for monitoring program effectiveness. The program will need to cover the responsibilities and authority of the site coordinator for the safety and health of employees at the site, and the relationships with contractors or support services as to what each employer's safety and health responsibilities are for their employees on the site. Each contractor on the site needs to have its own safety and health program so structured that it will smoothly interface with the program of the site coordinator or principal contractor.

(Back to all Standards)

 
   

SSPC: The Society for Protective Coatings
http://www.sspc.org/

Join SSPC and Enhance
Your Career !


DeHumidification Technologies
HUMIDITY PROBLEMS?

DH Tech has the most innovative and reliable equipment available to
control humidity efficiently
and effectively.
IT'S UNDER CONTROL!


Graco Inc.
Eco-friendly surface prep blasting equipment

EcoQuip blast equipment adds a fine water mist during the spraying process for less dust. Less media consumption. Less cleanup. Easy to use. Call 877.326.7847


Keizer Technologies, Inc.
Fast • Safe • Clean • Silent

The innovative RPR Induction Disbonder, the world’s fastest, safest, cleanest and very cost effective method for removing paint and coatings from steel surfaces.


Abrasives Inc.
One Call Orders it All!

Life is good when it’s simple. We distribute Clemco blast equipment, nozzles & parts alongside our proven blast media. Make your call: Abrasives Inc. 800-584-7524


DRYCO
Environmental Controls
Equipment & Service

Temporary climate control equipment. Dehumidifiers,
Heaters, A/C, Power, More…
Toll Free: 866-379-2600


Dampney Co., Inc.
Rubber In a can!

Rubberized Spray in a
Handy Aerosol Can

• Stays flexible
• Seals off moisture penetration
• Non sagging formulation
• Will not crack, chip or peel
• Apply to wet and dry surfaces
• Paintable

 
 
 
Technology Publishing

The Technology Publishing Network

The Journal of Protective Coatings & Linings (JPCL) PaintSquare
Durability + Design Paint BidTracker JPCL Europe

 
EXPLORE:      JPCL   |   PaintSquare News   |   Interact   |   Buying Guides   |   Webinars   |   Resources   |   Classifieds
REGISTER AND SUBSCRIBE:      Free PaintSquare Registration   |   Subscribe to JPCL   |   Subscribe to PaintSquare News
MORE:      About PaintSquare.com   |   Privacy policy   |   Terms & conditions   |   Site Map   |   Search   |   Contact Us
 

© Copyright 2000-2014, Technology Publishing / PaintSquare, All rights reserved
2100 Wharton Street, Suite 310, Pittsburgh PA 15203-1951; Tel 1-412-431-8300; Fax 1-412-431-5428; E-mail webmaster@paintsquare.com