PaintSquare.com
      | Connect Follow us on Twitter Like us on Facebook
About | Subscribe | Advertise
  

 

Your Daily Quiz

| More

Quiz Leaderboard: 6/29 - 7/29/2016    Sign in to track your quiz score! | Full Leaderboard

  • 1. willem van Gent (18/18 answered correctly)

  • 2. Mark Allen (18/18 answered correctly)

  • 3. Juan I. Ordinas (18/18 answered correctly)

  • 4. Mark Gierke (17/18 answered correctly)

  • 5. Stephen Lipsham (17/18 answered correctly)

  • 6. thomas woods (17/18 answered correctly)

  • 7. Robert Cloutier (17/18 answered correctly)

  • 8. Robin Hasak (17/18 answered correctly)

  • 9. Michael Durbin (16/18 answered correctly)

  • 10. L. Steven Moore (16/18 answered correctly)

  • 11. Bryon Beck (16/18 answered correctly)

  • 12. Doug Driscoll, Sr. (16/18 answered correctly)

  • 13. Dave Heyne (16/18 answered correctly)

  • 14. Mark Anater (16/18 answered correctly)

  • 15. Paul Lebedev (16/18 answered correctly)

  • 16. David Zuskin (15/18 answered correctly)

  • 17. Adam Carter (15/18 answered correctly)

  • 18. Gunnar Ackx (15/18 answered correctly)

  • 19. Michael Beitzel (15/18 answered correctly)

  • 20. Shabbir Hussain Shah (15/18 answered correctly)


Tuesday, October 12, 2010

A kitagawa tube is used for what?

Measuring paint viscosity
Checking the wear of blast nozzles
Feeding powder into a thermal spray gun
Field detection of chloride ions

Log in or register to PaintSquare save your results and track your cumulative quiz score!

   


Previous Quizzes from the Past Week

Monday, October 11, 2010
Safety hazards of a permit-required confined space, according to OSHA, include one or more of the following conditions.

Friday, October 8, 2010
What does a notch gage measure?

Thursday, October 7, 2010
SSPC-QP 1, Standard Procedure for Evaluating Painting Contractors (Field Application to Complex Industrial Structures) indentifies 4 areas of a contractor's quality system that have to be evaluated. Which item below is not included among the 4 areas?

Wednesday, October 6, 2010
True or false: New rules recently issued by the EPA on lead paint removal involve residential and some institutional structures.

Tuesday, October 5, 2010
True or false: According to SSPC, a complete painting system specification includes all the requirements necessary for a complete paint job, including the qualifications required of the contractor.


More previous quizzes

Desco Mfg. Co., Inc.

Dust - Free Surface Prep
Made EASY!

Efficient-Fast clean/remove
Advanced Containment
Safe - Well Below OSHA
Yes! - Innovative Solutions!
DESCO Mfg.Co., Inc.
www.descomfg.com
800-337-2648


Blastox/The TDJ Group, Inc.
Blastox - One Step
Lead Abatement

Don't waste money on added labor steps with other methods. Don't mix, meter or apply at the job-site. Avoid strict hazardous waste rules.
Let your painters paint


Waterjet Technology Association (WJTA)
2016 WJTA-IMCA Expo Nov. 2-3, New Orleans

See the latest advances in automated and handheld UHP waterjetting tools/systems for paint/coating removal, surface prep, industrial cleaning. Exhibits, live demos.


able equipment rental
RENTALS | SALES | SERVICE | PARTS

Construction equipment, plus compressors up to 1,800 cfm of air power & a fleet of service vehicles providing repairs to customer owned fleets. 866-468-2666.
www.ableequipment.com


Jotun Paints Inc.
Jotachar JF750 - The Time Saving Solution

The only mesh free solution for jet fire scenarios. Jotachar saves installation time and material costs - the next generation of epoxy passive fire protection.


Nationwide Overspray
Profession Overspray Removal Services

The Finest Name in Safe Overspray Removal. We specialize in removing all contaminants from any surface. Family Owned and Operated for 33 years! Fully insured. Satisfaction is guaranteed.


Carboline Company
Fireproofing Solutions

Pyroclad® X1 Thermo-Lag® Pyrocrete® – protecting against hydrocarbon and jet fires, explosions, and cryogenic spills.


US Minerals
US Minerals -
Black Magnum

With nationwide production and distribution capabilities, U.S. Minerals supplies a complete range of coal slag and other abrasives to meet all of your blasting needs.


Covestro Deutschland
What keeps contractors one layer ahead when finishing their projects?

The answer: Pasquick®. Thanks to Pasquick®, one layer of coating is saved – resulting in faster workflows and earlier project finishing. Learn more.


Vector Technologies Ltd.
The Original Performance Proven Vacuum Solutions

Vecloader DV 145, 350hp 6200 CFM & 28’’hg. For those big jobs, choose Vector for the most powerful trailer mounted vacuum in the industry today. 800-832-4010, 414-247-7100.

 
 
 
Technology Publishing

The Technology Publishing Network

The Journal of Protective Coatings & Linings (JPCL) PaintSquare
Durability + Design Paint BidTracker

 
EXPLORE:      JPCL   |   PaintSquare News   |   Interact   |   Buying Guides   |   Webinars   |   Resources   |   Classifieds
REGISTER AND SUBSCRIBE:      Free PaintSquare Registration   |   Subscribe to JPCL   |   Subscribe to PaintSquare News
MORE:      About PaintSquare.com   |   Privacy policy   |   Terms & conditions   |   Site Map   |   Search   |   Contact Us
 

© Copyright 2000-2016, Technology Publishing / PaintSquare, All rights reserved
2100 Wharton Street, Suite 310, Pittsburgh PA 15203-1951; Tel 1-412-431-8300; Fax 1-412-431-5428; E-mail webmaster@paintsquare.com