PaintSquare.com
      | Connect Follow us on Twitter Like us on Facebook
About | Subscribe | Advertise
  

 

Your Daily Quiz

| More

Quiz Leaderboard: 11/11 - 12/11/2016    Sign in to track your quiz score! | Full Leaderboard

  • 1. Michael Beitzel (18/19 answered correctly)

  • 2. willem van Gent (18/19 answered correctly)

  • 3. Mark Allen (18/19 answered correctly)

  • 4. Mark Gierke (18/19 answered correctly)

  • 5. Robert Cloutier (18/19 answered correctly)

  • 6. Robin Hasak (18/19 answered correctly)

  • 7. Doug Driscoll, Sr. (18/19 answered correctly)

  • 8. Farooq M (18/19 answered correctly)

  • 9. Luis Ruiz (18/19 answered correctly)

  • 10. Don Gruszka (18/19 answered correctly)

  • 11. Peter Farrell (17/19 answered correctly)

  • 12. Michael Durbin (17/19 answered correctly)

  • 13. Juan I. Ordinas (17/19 answered correctly)

  • 14. SUDALAI RAJ (17/19 answered correctly)

  • 15. David Stringfellow (17/19 answered correctly)

  • 16. Adam Carter (17/19 answered correctly)

  • 17. Bryon Beck (17/19 answered correctly)

  • 18. Stephen Lipsham (17/19 answered correctly)

  • 19. Roland Peemans (17/19 answered correctly)

  • 20. Mark Anater (17/19 answered correctly)


Tuesday, October 12, 2010

A kitagawa tube is used for what?

Measuring paint viscosity
Checking the wear of blast nozzles
Feeding powder into a thermal spray gun
Field detection of chloride ions

Log in or register to PaintSquare save your results and track your cumulative quiz score!

   


Previous Quizzes from the Past Week

Monday, October 11, 2010
Safety hazards of a permit-required confined space, according to OSHA, include one or more of the following conditions.

Friday, October 8, 2010
What does a notch gage measure?

Thursday, October 7, 2010
SSPC-QP 1, Standard Procedure for Evaluating Painting Contractors (Field Application to Complex Industrial Structures) indentifies 4 areas of a contractor's quality system that have to be evaluated. Which item below is not included among the 4 areas?

Wednesday, October 6, 2010
True or false: New rules recently issued by the EPA on lead paint removal involve residential and some institutional structures.

Tuesday, October 5, 2010
True or false: According to SSPC, a complete painting system specification includes all the requirements necessary for a complete paint job, including the qualifications required of the contractor.


More previous quizzes

Carlisle Fluid Technologies
Built for Tough Jobs

From Epoxies to Urethanes to other high solid coatings, the new Binks Airless 75 delivers a great finish using an ergonomic design. Visit binks.com for more information.


Safway Services
Safeguard Assets. Ensure Productivity. HAKI®

Protect assets and equipment. Keep facilities open and operational. Maintain schedules regardless of weather. Ensure smooth and continuous production. Easy to erect. Safway is the primary distributor of HAKI® products including HAKISPAN and HAKITEC® 750 – in North America.


Novatek Corporation
Novatek Corporation, Dustless Coatings Removal

Strip, clean and profile all dust free! Comply with new lead standards. Contact today: (866) 563-7800


KTA-Tator, Inc. - Corporate Office
KTA Analyzes
Coating Failures

• Field Diagnosis
• Lab Diagnosis
• Determination of Cause
• Recommendations
www.kta.com
Call 1-800-245-6379


Advanced Recycling Systems
ADVANCED RECYCLING SYSTEMS (ARS)

Recycling Machines, Dust Collectors, Rapid Deployment units are time-tested and approved for the rugged industrial environment. Contact ARS today!
(330)536-8210


Fischer Technology Inc.
MP0R with rotating display screen

Automatic rotating display screen just like your smart phone. Click for Video
Call 800-243-8417


Atlantic Design, Inc.
GOING BEYOND INDUSTRY STANDARDS

The ADI HD40 Dust Collector is a smaller, more economical way to meet/ exceed Industry standards. Watch the video for details on our website. 866.Call.ADI


NLB Corporation
NLB Sure Shroud: Greater Protection and Flexibility

NLB’s Sure Shroud’s lighter weight and flexibility reduces operator fatigue and offers unmatched protection against high pressure hose ruptures. 10k to 40k psi rated.

 
 
 
Technology Publishing

The Technology Publishing Network

The Journal of Protective Coatings & Linings (JPCL) PaintSquare
Durability + Design Paint BidTracker

 
EXPLORE:      JPCL   |   PaintSquare News   |   Interact   |   Buying Guides   |   Webinars   |   Resources   |   Classifieds
REGISTER AND SUBSCRIBE:      Free PaintSquare Registration   |   Subscribe to JPCL   |   Subscribe to PaintSquare News
MORE:      About PaintSquare.com   |   Privacy policy   |   Terms & conditions   |   Site Map   |   Search   |   Contact Us
 

© Copyright 2000-2016, Technology Publishing / PaintSquare, All rights reserved
2100 Wharton Street, Suite 310, Pittsburgh PA 15203-1951; Tel 1-412-431-8300; Fax 1-412-431-5428; E-mail webmaster@paintsquare.com