| Connect Follow us on Twitter Like us on Facebook
About | Subscribe | Advertise


Download our free e-book! Overcoating bridges and other structures.

Your Daily Quiz

| More

Quiz Leaderboard: 9/24 - 10/24/2016    Sign in to track your quiz score! | Full Leaderboard

  • 1. arieh calahorra (21/21 answered correctly)

  • 2. willem van Gent (21/21 answered correctly)

  • 3. Robert Cloutier (21/21 answered correctly)

  • 4. Gustavo Vidal (21/21 answered correctly)

  • 5. Farooq M (20/21 answered correctly)

  • 6. Doug Driscoll, Sr. (20/21 answered correctly)

  • 7. Mark Allen (20/21 answered correctly)

  • 8. Mark Gierke (20/21 answered correctly)

  • 9. Bryon Beck (20/21 answered correctly)

  • 10. Roland Peemans (20/21 answered correctly)

  • 11. Juan I. Ordinas (19/21 answered correctly)

  • 12. Stephen Lipsham (19/21 answered correctly)

  • 13. Michael Beitzel (19/21 answered correctly)

  • 14. Dave Heyne (19/21 answered correctly)

  • 15. Robin Hasak (19/21 answered correctly)

  • 16. L. Steven Moore (18/21 answered correctly)

  • 17. John Ladage (18/21 answered correctly)

  • 18. Peter Farrell (18/21 answered correctly)

  • 19. Adam Carter (18/21 answered correctly)

  • 20. Mark Anater (18/21 answered correctly)

Monday, September 12, 2011

According to OSHA, what is the primary problem with this marine scaffolding assembly?

According to OSHA, what is the <i>primary</i> problem with this marine scaffolding assembly?

It should extend higher above the work surface.
It lacks guardrails.
It should be built on a larger platform.
It will not support the required weight.

Log in or register to PaintSquare save your results and track your cumulative quiz score!


Previous Quizzes from the Past Week

Friday, September 9, 2011
When does OSHA require that an aerial lift operator undergo retraining?

Thursday, September 8, 2011
ASTM International’s Committee D-1 is developing its first-ever standard for what?

Wednesday, September 7, 2011
Which US President signed the Environmental Protection Act, establishing the now-controversial EPA?

Tuesday, September 6, 2011
On a coating job, what is the normal meaning of the term "hold point"?

Friday, September 2, 2011
True or false: Two- and three-coat epoxy systems are often recommended for ships' ballast tank linings.

More previous quizzes


The Next Generation
of Blasting

• Lightest
• Coolest
• Most Comfortable
• Most Dependable

Desco Mfg. Co., Inc.

Steel Fabrication

• Shipyards
• Plate Fabrication
• Structural Steel
• Maintenance

DESCO Mfg.Co., Inc.

Specialty Products, Inc. (SPI)
Polyurea & Polyurethane Spray Foam Training

SPI is committed to industry leading technical training for polyurea & polyurethane spray foam professionals. Attendees receive hands-on, in-depth training for using and troubleshooting plural-component equipment, spray guns, machine hoses & parts.

SAFE Systems, Inc.
Portable Blast &
Recovery Equipment

Trailer or skid mounted blast and recovery equipment. Systems designed for maximum versatility, environmental compliance
and overall cost savings.
Call 1-800-634-7278

Sidewinder/Persyst Enterprises, Inc.
The Sidewinder Model M2 Solvent Recycler

Combat the rising cost of gunwash, thinners, acetone & more while drastically reducing waste disposal coat.

ABKaelin, LLC
ABkaelin, LLC

MONITORING-Environmental and worker monitoring CONSULTING & INSPECTION – Coatings, EHS, and compliance.

Blastman Robotics Ltd.
Robotic Blast Cleaning

Replace manual blasting with new Blastman robot models. Contact us to boost your production and save costs!

Absolute Equipment/Grand Rental Station

We have Tier 4 Equipment including Air Compressors & Generators for Sale & Rent! Your job may now require Tier-4. or Call 412-931-6655.

Clemco Industries Corp.
Powerful Protection in a Small Package

Mounts inside blast helmet, alerts operator to dangerous breathing-air condition by audible, visual, and vibratory alarms. Easily calibrated, battery operated.

Blastox/The TDJ Group, Inc.
Blastox® - One Step Lead Abatement

Sandblast additive delivered to jobsite pre-blended to eliminate hazardous abrasive wastes. Why mix, meter or apply at the job-site? Blast with ease and
Let your painters paint!

Technology Publishing

The Technology Publishing Network

The Journal of Protective Coatings & Linings (JPCL) PaintSquare
Durability + Design Paint BidTracker

EXPLORE:      JPCL   |   PaintSquare News   |   Interact   |   Buying Guides   |   Webinars   |   Resources   |   Classifieds
REGISTER AND SUBSCRIBE:      Free PaintSquare Registration   |   Subscribe to JPCL   |   Subscribe to PaintSquare News
MORE:      About   |   Privacy policy   |   Terms & conditions   |   Site Map   |   Search   |   Contact Us

© Copyright 2000-2016, Technology Publishing / PaintSquare, All rights reserved
2100 Wharton Street, Suite 310, Pittsburgh PA 15203-1951; Tel 1-412-431-8300; Fax 1-412-431-5428; E-mail