Follow us on Twitter Follow us on LinkedIn Like us on Facebook Follow us on Instagram Visit the TPC Store
Search the site




Your Daily Quiz


Quiz Leaderboard: 2/15 - 3/17/2018    Sign in to track your quiz score! | Full Leaderboard

  • 1. Chuck Fite (20/21 answered correctly)

  • 2. willem van Gent (20/21 answered correctly)

  • 3. Mark Allen (20/21 answered correctly)

  • 4. Wes Carter (20/21 answered correctly)

  • 5. Robert Cloutier (20/21 answered correctly)

  • 6. Doug Driscoll, Sr. (20/21 answered correctly)

  • 7. Adam Carter (20/21 answered correctly)

  • 8. Mark Gierke (20/21 answered correctly)

  • 9. Michael Beitzel (19/21 answered correctly)

  • 10. Bryon Beck (19/21 answered correctly)

  • 11. Richard Williams (19/21 answered correctly)

  • 12. Glenn D. Hauser (19/21 answered correctly)

  • 13. Roland Peemans (19/21 answered correctly)

  • 14. Juan I. Ordinas (19/21 answered correctly)

  • 15. Mark Anater (19/21 answered correctly)

  • 16. Jerrod (Jake) McCann (18/21 answered correctly)

  • 17. Dave Heyne (18/21 answered correctly)

  • 18. Douglas Steitz (18/21 answered correctly)

  • 19. Ron Truman (18/21 answered correctly)

  • 20. Luis Ruiz (17/21 answered correctly)

Safety hazards of a permit-required confined space, according to OSHA, include one or more of the following conditions.

Hazardous atmosphere
Presence of material, like grain, that can engulf a worker
Configuration of the internal space that can cause entrapment of an entrant
All of these

Log in or register to PaintSquare save your results and track your cumulative quiz score!


Previous Quizzes from the Past Week

Friday, October 8, 2010
What does a notch gage measure?

Thursday, October 7, 2010
SSPC-QP 1, Standard Procedure for Evaluating Painting Contractors (Field Application to Complex Industrial Structures) indentifies 4 areas of a contractor's quality system that have to be evaluated. Which item below is not included among the 4 areas?

Wednesday, October 6, 2010
True or false: New rules recently issued by the EPA on lead paint removal involve residential and some institutional structures.

Tuesday, October 5, 2010
True or false: According to SSPC, a complete painting system specification includes all the requirements necessary for a complete paint job, including the qualifications required of the contractor.

Monday, October 4, 2010
What organization developed Performance Standards for Protective Coatings in ballast tanks on ships?

More previous quizzes
SABRE Autonomous Solutions
Personnel are free to do other tasks while the ALPHA1 does the “dirty work”.

Industrial Vacuum Equipment Corp.
Hurricane Vacuums
& Dust Collectors
Vacuum and dust collector hose, filters and related accessories.

SAFE Systems, Inc.
Portable Dust Collectors for Tough Environments
Trailer and skid-mounted models in numerous sizes, powered by electric and/or diesel. Sloped roofs, multiple dust inlets, high static, dampered fans. Lockable power & drive compartments.

Tarps manufacturing, Inc.
QUALITY MADE IN AMERICA —Available near you!
CLICK to get a behind-the-scenes look at how Tarps Manufacturing makes the highest-quality tarps right here in the USA — available nationwide.

US Minerals
Hit Harder. Clean Faster.
Black Diamond abrasive products are the toughest, most effective blasting media and supply the superior power you need to get any job done.

Modern Safety Techniques
Modern Safety Techniques
With our unique LTCat, we can help to provide clean, safe breathing air to your workers. Take a look at our Breathing Air Systems, we supply at least twice as much charcoal as our competitors! Modern

Absolute Equipment/Grand Rental Station
We have Tier 4 Equipment including Air Compressors & Generators for Sale & Rent! Your job may now require Tier-4. or Call 412-931-6655.

Sauereisen, Inc.
SewerGard® 210XHB
• 300 mils in a single coat by plural component equipment
• Fast Setting
• 100% Solids Epoxy
• Chemical-resistant barrier for municipal wastewater environments

KTA-Tator, Inc. - Corporate Office
New KTA Pipeline Inspection Kit
• Defelsko standard memory body
• Positector FTS 0-250 mils, cabled dry film thickness probe
• NEW Positector Shore D hardness probe
• All essential inspection equipment!


Technology Publishing Co., 1501 Reedsdale Street, Suite 2008, Pittsburgh, PA 15233

TEL 1-412-431-8300  • FAX  1-412-431-5428  •  EMAIL

The Technology Publishing Network

Durability + Design PaintSquare the Journal of Protective Coatings & Linings Paint BidTracker

EXPLORE:      JPCL   |   PaintSquare News   |   Interact   |   Buying Guides   |   Webinars   |   Resources   |   Classifieds
REGISTER AND SUBSCRIBE:      Free PaintSquare Registration   |   Subscribe to JPCL   |   Subscribe to PaintSquare News
MORE:      About   |   Privacy policy   |   Terms & conditions   |   Site Map   |   Search   |   Contact Us