During newbuilding, do I have to stripe coat edges if I am using an edge retention primer?



More items for Coating Application


Selected Answers

From FRIDAY OWAJI of DELATTRE BEZONS on September 7, 2013:
Yes stripe coating the edge is the best thing, but the applicator should determine if the spec calls for it.

From Empty Jasson of Hai Phong on February 22, 2013:
     Yes, during newbuilding, stripe coat must be carried out on all edges.

From James Albertoni of CA Department of Water Resources on January 22, 2013:
     Technically, you only have to do what the spec says. If your spec doesn't call for stripe coating, then it is not required. However, it is always a good idea and will prolong the life of the coating.

From Per Gabrielsson of Free Lance Consultations and Inspections on January 22, 2013:
     Yes, of course. Physical forces drive the coating away from edges. Always stripe coat with brush, if possible. Stripe also a few cm's from edges.

From Tom Schwerdt of Texas Department of Transportation on January 24, 2013:
     Best practices would be to stripe-coat the edges. I have seen numerous "edge retentive" primers which had 50% or less thickness at an edge when compared to the flat.

From Atanas Cholakov of ACT on January 23, 2013:
     Per, if this is not highlighted in the coating spec, then RFI needs to be risen to seek clarification. Stripe coat is almost always necessary, but IOZ systems might be exempted. The coating spec insists (rules)... nobody else.

From Atanas Cholakov of ACT on January 21, 2013:
     This question can be best answered from your Coating Spec., pre-job meeting. Assessment of structure complexity and accessibility for spray will be an important step with following highlight on areas to be stripe-coated. The paint supplier's tech. rep's opinion is of importance as well.

From Daniel Liu of APC on February 6, 2013:
     Before the project starts, the application procedure, of course including stripe coating, is normally  fixed, mainly based on the specs, during the pre-job conference. If this point is not required or highlighted in the specs, you can apply the stripe coat where necessary, such as poor manual welds with undercuts, etc. In this case, trust your experience!

From Per Gabrielsson of Free Lance Consultations and Inspections on January 23, 2013:
     Atanas, accessibility for spraying has nothing to do with the need for stripe coating. If you aim to spray an edge, how much paint do you actually have on that? And how much dry spraying of adjacent areas? In shipping we know the limitations of the paint supplier;  this is why WE (the owner's inspectors) have to insist in stripe coatings.

Please sign in to submit your answer this question    

Tagged categories: Edge-retentive Primers; Edges


Current PSF Question | Submit a PSF Question | Full PSF Archive

Commercial Sandblasting & Painting Ltd.
Reliable Service & Superior Workmanship

We’re ready to meet any of your protective coating and lining needs. We can work on your site or in our facilities, with large shops (60,000 sq ft), 40 acres of yard space, and cranes and forklifts on site.


US Minerals
US Minerals -
Black Magnum

With nationwide production and distribution capabilities, U.S. Minerals supplies a complete range of coal slag and other abrasives to meet all of your blasting needs.


International Paint LLC

International Paint Engineered Coatings

Learn about our solutions for:
  • Structural Steel
  • Piping & Equipment
  • Storage Tanks
  • Pressure Vessels
  • Secondary Containment


    U.S. Zinc
    Historic Reliability. Innovative Performance.

    As an industry leader with an established global footprint, we provide the products that prolong the life your paints and coatings. U.S. Zinc – Helping the world work™


    Atlantic Design, Inc.
    POWER ON WITH ADI!

    The most air flow possible… In the smallest package imaginable… For a price you won’t believe! 866.Call.ADI


    KTA-Tator, Inc. - Corporate Office
    KTA-TATOR LABORATORY SERVICES

    • Coating failure analysis
    • Independent
      comparative testing
    • Accelerated
      weathering testing
    • Toxic metals testing
    • A2LA Accredited
    800-245-6379


    PreTox Products - NexTec, Inc.
    GOT LEAD? Specify Pretox System products

    The ONLY Lead Stabilizer Compatible with All Paint Removal Methods. Works with all Blast Media: Grits | Recyclable Abrasives | CO2 | Water | Power Tools | Etc. Call Dave Steffen at 800.338.8296.


    NLB Corporation
    VacLance cleans up as you do surface preparation

    Add vacuum recovery to any NLB rotating water jet lance with a VacLance attachment and vacuum source. Model DM32283 works vertically, horizontally and in corners.


    GMA Garnet USA
    GMA Garnet™
    Natural Abrasives

    - Superior cleaning
      performance
    - Even Profile
    - Low Dust
    - Cost-Effective
    - Environmentally friendly
    - Recyclable up to 5 times
    Tel : +1 832 243 9300

  •  
     
     
    Technology Publishing

    The Technology Publishing Network

    The Journal of Protective Coatings & Linings (JPCL) PaintSquare
    Durability + Design Paint BidTracker

     
    EXPLORE:      JPCL   |   PaintSquare News   |   Interact   |   Buying Guides   |   Webinars   |   Resources   |   Classifieds
    REGISTER AND SUBSCRIBE:      Free PaintSquare Registration   |   Subscribe to JPCL   |   Subscribe to PaintSquare News
    MORE:      About PaintSquare.com   |   Privacy policy   |   Terms & conditions   |   Site Map   |   Search   |   Contact Us
     

    © Copyright 2000-2015, Technology Publishing / PaintSquare, All rights reserved
    2100 Wharton Street, Suite 310, Pittsburgh PA 15203-1951; Tel 1-412-431-8300; Fax 1-412-431-5428; E-mail webmaster@paintsquare.com