A specification for a bridge to be built of high-performance weathering steel (HPS GR50/GR70W) requires an SSPC-SP 10, a profile of 3 to 5 mils, and metallizing with a final dft of 10-12 mils. What challenges, time, and costs are associated with obtaining the profile, primarily in the shop but also in the field? Are there any long-term performance issues with metallizing over weathering steel?


Selected Answers

From Chuck Pease of MMI Tank on May 5, 2010:
It can be very difficult and costly to achieve a 3-5 mil blast profile on weathering steel because it has an inherent surface hardness greater than conventional carbon steel. It can therefore take 30-40 percent more hours of labor to achieve a 3-5 mil profile.

Weathering steel construction plays a part because a typical weathering steel bridge girder is unique in design to minimize the accumulation of debris and moisture.

We could not achieve a 3-5 mil profile using even using G-25 steel grit with a 40-50 Rockwell C hardness while meeting an SSPC-SP 10 degree of cleanliness. The best we could come up with was 1.75 mils. We were finally able to achieve an average of 4.2 mils using a mixture of G18/G16 steel grit.

We were able to convince the DOT to allow a more aggressive profile as a better anchor profile for the subsequent metallizing.

As for long-term performance issues with metallizing over weathering steel, I am not aware of any to date.

In specifying weathering steel for structures to be metallized, the specifier should take care not to include stitch welds; stiffener connections to bottom flanges should be specified to be continuous welds all along the stiffeners, and snipes should be eliminated or continously welded to the webs.

Other areas of concern for long-term metallizing performance would be to eliminate areas that will hold water or condensation for long periods of time, as crevice corrosion can develop and the oxide coating found on typical weathering steel will not develop on surfaces that are continually wet or covered with debris.

Zinc metallizing systems are porous until the zinc oxidizes, so care should be taken to design weathering or carbon steel structures where these micro-enviroments cannot develop.

Please sign in to submit your answer this question    

Tagged categories: Bridges


Current PSF Question | Submit a PSF Question | Full PSF Archive

Advertisements
 
SABRE Autonomous Solutions
 
Quality
 
The ALPHA1 provides a consistent finish day-in
day-out; job to job.
 

 
Novatek Corporation
 
Dustless Coatings Removal
 
Novatek Corporation, Dustless Coatings Removal Strip, clean and profile all dust free! Comply with new lead standards. Contact today: (866) 563-7800 www.Novatekco.com
 

 
SAFE Systems, Inc.
 
Portable Dust Collectors for Tough Environments
 
Trailer and skid-mounted models in numerous sizes, powered by electric and/or diesel. Sloped roofs, multiple dust inlets, high static, dampered fans. Lockable power & drive compartments.
 

 
Industrial Vacuum Equipment Corp.
 
Hurricane Vacuums
& Dust Collectors
 
Vacuum and dust collector hose, filters and related accessories.
IndustrialVacuum.com
 

 
International Bridge Conference
 
Bridge conference 2018
 
Registration for the 2018 IBC is now open! Join us in June for the biggest and best IBC ever! View the Program, Workshops and Exhibitors by clicking in the banner.
 

 
HoldTight Solutions Inc.
 
NO FLASH RUST - NO CONTAMINANTS
 
Our HoldTight®102 salt remover & flash rust
preventer prevents flash
rust by removing surface contaminants. Contact us
for your nearest distributor.
(800) 319.8802 sales@holdtight.com
 

 
KTA-Tator, Inc. - Corporate Office
 
Instrument Service Department
 
Are you a QP certified contractor? KTA’s Instrument Service Department can help keep you compliant!
Click or call 1-800-KTA-GAGE.
 

 
Sky Climber, LLC
 
Solutions in Suspended Access
 
Safely reach workspaces regardless of size or purpose with our full line of Hoists, modular Platforms, and versatile Workcages.
 

 
CHLOR*RID International Inc.
 
SOLUTIONS THAT WORK
 
Companies that invest in corrosion control use CHLOR RID products
  • Soluble salt removal liquid
  • Test kits to verify contamination levels
  • Surface passivation to hold the blast
INFO@CHLOR-RID.COM 800.422.3217
 

 
Carboline Company
 
Carboline launches new website!
 
The completely revamped website, offers quick and easy access to essential product information and is now mobile-friendly.
 

 
 
 

Technology Publishing Co., 1501 Reedsdale Street, Suite 2008, Pittsburgh, PA 15233

TEL 1-412-431-8300  • FAX  1-412-431-5428  •  EMAIL webmaster@paintsquare.com


The Technology Publishing Network

Durability + Design PaintSquare the Journal of Protective Coatings & Linings Paint BidTracker

 
EXPLORE:      JPCL   |   PaintSquare News   |   Interact   |   Buying Guides   |   Webinars   |   Resources   |   Classifieds
REGISTER AND SUBSCRIBE:      Free PaintSquare Registration   |   Subscribe to JPCL   |   Subscribe to PaintSquare News
MORE:      About PaintSquare.com   |   Privacy Policy   |   Terms & Conditions   |   Support   |   Site Map   |   Search   |   Contact Us