June 16 - June 20, 2014

A California utility wants the authority to remove trees and structures from private property if they threaten pipeline integrity. What do you think?



More items for Program/Project Management
Answers Votes
It's a public safety issue; the utility should have the final say. 30%
The property owner should have the final say. 16%
A third-party mediator should help the parties forge a compromise. 50%
Settle it in the courts, before a judge. 4%


Suggest a topic

   

Tagged categories: Pipeline; Pipelines

Comment from Karen Fischer, (6/18/2014, 9:25 AM)

Another erosion of property rights.... If the pipeline came AFTER the structures, why should the property owner lose their house, garage, shed, barn etc;? When it comes down to it, this could mushroom into a lot of problems for millions of property owners who have a natural gas pipeline running in front of their houses as most Urban dwellers have. The text and meaning of new laws never remain the same, they morph into just more regulation & control. This is a land grab and an erosion of property rights, government handing over our rights to a mega-business.


Comment from Tom Schwerdt, (6/19/2014, 8:14 AM)

Not a lot of pipelines come AFTER the structures, if the structure is close enough to cause integrity concerns. Typically pipelines are installed open-trench. Lots cheaper that way.


Comment from M. Halliwell, (6/19/2014, 10:38 AM)

The mediator solution seems like the best option for those that are existing. Perhaps for future installations, the utilities need to look at routing their pipes within a small right-of-way. Then all you need in the right-of-way is agreements for maintenance (i.e. landowner gets a small stipend to do upkeep such as mowing the grass) but the utility can come in to prevent root issues (with proper restoration once the work is completed).


Comment from Karen Fischer, (6/19/2014, 12:26 PM)

Tom, this is not necessarily the case. In my geographical area, a pipeline was placed right on the property line between two residential properties. The homes (which existed at the time) are less than 50' from the buried pipeline. Emminent domain at work on that one. Property owners had NO say in it. It does happen...


Comment from Tom Schwerdt, (6/20/2014, 8:28 AM)

Karen, sure - it can happen that a pipeline is installed later near structures. However, it's a pretty big engineering screwup if the existing structures "threaten pipeline integrity" - which was the topic here. The engineering analysis performed before the pipeline goes in must take those structures into account.


Comment Join the Conversation:

Sign in to our community to add your comments.

Desco Mfg. Co., Inc.
DUST-FREE SOLUTIONS For Lead Abatement

Tools operate at levels well below OSHA limits for hazardous material removal; meet SP11 specifications when required and low vibration tools increase productivity.


Industrial Vacuum Equipment Corp.
Hurricane Vacuums
& Dust Collectors

Vacuum and dust collector hose, filters and related accessories.
IndustrialVacuum.com


Tarps manufacturing, Inc.
QUALITY MADE IN AMERICA —Available near you!

CLICK to get a behind-the-scenes look at how Tarps Manufacturing makes the highest-quality tarps right here in the USA — available nationwide.


SABRE Autonomous Solutions
Safety, Productivity, Quality. Robotic Blasting

Learn how this simple to use, field deployed, automatic robot is eliminating hazards in major confined, cluttered and complex surface preparation projects.


Harsco
Find BLACK BEAUTY® Abrasives

Use our online tool to search by address, city or zip code to find where you can buy BLACK BEAUTY® abrasives. Or call us toll free: 1-888-733-3646


Covestro Deutschland
What keeps contractors one layer ahead when finishing their projects?

The answer: Pasquick®. Thanks to Pasquick®, one layer of coating is saved – resulting in faster workflows and earlier project finishing. Learn more.


N.T. Ruddock Co.

Our Abrasives Hold Up Under Pressure

N. T. Ruddock focuses on abrasive selection, equipment evaluation, equipment maintenance & reduction of abrasive consumption. Other services include Screen Analysis & Background Radiation Testing.


Easy-Kleen Pressure Systems Ltd.
HIGH PRESSURE HOT WATER/STEAM UNITS

3000 to 8000 PSI ALL IN ONE: Water tank, reels and unit enclosed in an industrial skid frame. Call Today and ask about the Fill & Play Series 1-800-315-5533


PreTox Products - NexTec, Inc.
GOT LEAD? Specify Pretox System products

The ONLY Lead Stabilizer Compatible with All Paint Removal Methods. Works with all Blast Media: Grits | Recyclable Abrasives | CO2 | Water | Power Tools | Etc. Call Dave Steffen at 800.338.8296.


Corrosion Probe, Inc.
From Detection to Correction

Corrosion Probe, Inc. has the Most Concrete Coatings Experience and Expertise. Contact us today at
860-767-4402, www.cpiengineering.com

 
 
 
Technology Publishing

The Technology Publishing Network

The Journal of Protective Coatings & Linings (JPCL) PaintSquare
Durability + Design Paint BidTracker

 
EXPLORE:      JPCL   |   PaintSquare News   |   Interact   |   Buying Guides   |   Webinars   |   Resources   |   Classifieds
REGISTER AND SUBSCRIBE:      Free PaintSquare Registration   |   Subscribe to JPCL   |   Subscribe to PaintSquare News
MORE:      About PaintSquare.com   |   Privacy policy   |   Terms & conditions   |   Site Map   |   Search   |   Contact Us
 

© Copyright 2000-2016, Technology Publishing / PaintSquare, All rights reserved
2100 Wharton Street, Suite 310, Pittsburgh PA 15203-1951; Tel 1-412-431-8300; Fax 1-412-431-5428; E-mail webmaster@paintsquare.com