PaintSquare.com
      | Connect Follow us on Twitter Like us on Facebook
About | Subscribe | Advertise
  

 


June 16 - June 20, 2014

A California utility wants the authority to remove trees and structures from private property if they threaten pipeline integrity. What do you think?



More items for Program/Project Management
Answers Votes
It's a public safety issue; the utility should have the final say. 30%
The property owner should have the final say. 16%
A third-party mediator should help the parties forge a compromise. 50%
Settle it in the courts, before a judge. 4%


Suggest a topic

   

Tagged categories: Pipeline; Pipelines

Comment from Karen Fischer, (6/18/2014, 9:25 AM)

Another erosion of property rights.... If the pipeline came AFTER the structures, why should the property owner lose their house, garage, shed, barn etc;? When it comes down to it, this could mushroom into a lot of problems for millions of property owners who have a natural gas pipeline running in front of their houses as most Urban dwellers have. The text and meaning of new laws never remain the same, they morph into just more regulation & control. This is a land grab and an erosion of property rights, government handing over our rights to a mega-business.


Comment from Tom Schwerdt, (6/19/2014, 8:14 AM)

Not a lot of pipelines come AFTER the structures, if the structure is close enough to cause integrity concerns. Typically pipelines are installed open-trench. Lots cheaper that way.


Comment from M. Halliwell, (6/19/2014, 10:38 AM)

The mediator solution seems like the best option for those that are existing. Perhaps for future installations, the utilities need to look at routing their pipes within a small right-of-way. Then all you need in the right-of-way is agreements for maintenance (i.e. landowner gets a small stipend to do upkeep such as mowing the grass) but the utility can come in to prevent root issues (with proper restoration once the work is completed).


Comment from Karen Fischer, (6/19/2014, 12:26 PM)

Tom, this is not necessarily the case. In my geographical area, a pipeline was placed right on the property line between two residential properties. The homes (which existed at the time) are less than 50' from the buried pipeline. Emminent domain at work on that one. Property owners had NO say in it. It does happen...


Comment from Tom Schwerdt, (6/20/2014, 8:28 AM)

Karen, sure - it can happen that a pipeline is installed later near structures. However, it's a pretty big engineering screwup if the existing structures "threaten pipeline integrity" - which was the topic here. The engineering analysis performed before the pipeline goes in must take those structures into account.


Comment Join the Conversation:

Sign in to our community to add your comments.

SAFE Systems, Inc.
SAFE Systems'
Blast Lights &
Deadman Switches

Halogen or LED blast lights available with our NEW urethane bumper. Switches available in many colors for color coding your hoses.


Armakleen Company, The
ARMEX when nondestructive cleaning is critical

The gentle physical propriety of baking soda but yet aggressive cleaning ability is what makes ARMEX the only choice for nondestructive abrasive blasting.


SSPC: The Society for Protective Coatings
http://www.sspc.org/

Join SSPC and Enhance
Your Career !


Midsun Specialty Products
Stopaq 30+ Year Coatings

Use Stopaq corrosion prevention coatings on pipelines, field joints, tank chimes, structural steel and more. Learn more at www.midsunsp.com/stopaq


Chicago Corrosion Group
Vendor-neutral corrosion consulting

What you don’t know about painting is costing you a fortune. Call today to see how CCG’s vendor-neutral, owner’s advocacy saves our clients millions.


KTA-Tator, Inc. - Corporate Office
KTA-Tator EH&S Services

• Ambient & Worker Exposure Air Monitoring
• Safety & Health Program Development
• Lead Paint Assessments
& Specifications
• Health Hazard & Jobsite Safety Assessments
Call 1-800-245-6379


Montipower, Inc.
The MBX Bristle Blaster

Get a 2.7 to 3.3 mil profile and a Near White Metal Clean. For info visit www.mbxit.com or call 877 629-8777


International Paint LLC

International Paint Engineered Coatings

Learn about our solutions for:
  • Structural Steel
  • Piping & Equipment
  • Storage Tanks
  • Pressure Vessels
  • Secondary Containment


    CHLOR*RID International Inc.
    Free Webinar

    Learn about soluble salts, along with a discussion on allowable levels.
    More information at
    www.chlor-rid.com,

    800-422-3217


    PreTox Products - NexTec, Inc.
    GOT LEAD? Specify Pretox System products

    The ONLY Lead Stabilizer Compatible with All Paint Removal Methods. Works with all Blast Media: Grits | Recyclable Abrasives | CO2 | Water | Power Tools | Etc. Call Dave Steffen at 800.338.8296.

  •  
     
     
    Technology Publishing

    The Technology Publishing Network

    The Journal of Protective Coatings & Linings (JPCL) PaintSquare
    Durability + Design Paint BidTracker

     
    EXPLORE:      JPCL   |   PaintSquare News   |   Interact   |   Buying Guides   |   Webinars   |   Resources   |   Classifieds
    REGISTER AND SUBSCRIBE:      Free PaintSquare Registration   |   Subscribe to JPCL   |   Subscribe to PaintSquare News
    MORE:      About PaintSquare.com   |   Privacy policy   |   Terms & conditions   |   Site Map   |   Search   |   Contact Us
     

    © Copyright 2000-2015, Technology Publishing / PaintSquare, All rights reserved
    2100 Wharton Street, Suite 310, Pittsburgh PA 15203-1951; Tel 1-412-431-8300; Fax 1-412-431-5428; E-mail webmaster@paintsquare.com