PaintSquare.com
      | Connect Follow us on Twitter Like us on Facebook
About | Subscribe | Advertise
  

 


September 12 - September 18, 2011

Half of Massachusetts’ bridge and highway projects are completed late—many of them, years late, a new report shows. In your experience, what is the chief cause of project delays?



More items for Program/Project Management
Answers Votes
Weather or other external factors 19%
Coordination with other trades 12%
Supply issues 0%
Client changes 16%
Deficiencies in project management 53%


Suggest a topic

   

Tagged categories: Project Management

NACE International, The Corrosion Society
Get the Basics Anytime, Anywhere!

Take this online training to eliminate juggling your work schedule with continuous education. Learn corrosion causes, types, and how it can be controlled.


Sika-Us
Sika® Industrial Floor Coatings

Click to learn about floor and wall systems relied upon for performance, durability, easy maintenance and aesthetics across the every industry and environment.


Novetas Solutions
Abrasive Blasting near or over water?

100% Recycled Glass! NO Arsenic, Beryllium or other Toxic Metals! Great White Metal Finish and Safer than Slags! Call us at 866-775-6226


Fischer Technology Inc.
NEW PROBE FOR MEASURING TSA THICKNESS

Paired with the PHASCOPE PMP10, Fischer’s new probe is quick and accurate for measuring thermally sprayed aluminum on stainless steel. Click to learn more.


Dampney Co., Inc.
High Temperature White Paint

New Coating with not yellow, remains white and will withstand temperatures up to 1,200ºF


PSS Industrial Group
AirTech - World Leader in Custom Spray Solutions

AirTech is the solution
for any custom spray application. We have painting & finishing equipment, blast equipment, painting accessories, booth filter and many more items in inventory.


KTA-Tator, Inc. - Corporate Office
KTA-Tator EH&S Services

• Ambient & Worker Exposure Air Monitoring
• Safety & Health Program Development
• Lead Paint Assessments
& Specifications
• Health Hazard & Jobsite Safety Assessments
Call 1-800-245-6379


SAFE Systems, Inc.
Portable Blast &
Recovery Equipment

Trailer or skid mounted blast and recovery equipment. Systems designed for maximum versatility, environmental compliance
and overall cost savings.
Call 1-800-634-7278


International WorkBoat Show


HoldTight Solutions Inc.
NO FLASH RUST - NO CONTAMINANTS

Our HoldTight®102 salt remover & flash rust
preventer prevents flash
rust by removing surface contaminants. Contact us
for your nearest distributor.
(800) 319.8802 sales@holdtight.com

 
 
 
Technology Publishing

The Technology Publishing Network

The Journal of Protective Coatings & Linings (JPCL) PaintSquare
Durability + Design Paint BidTracker

 
EXPLORE:      JPCL   |   PaintSquare News   |   Interact   |   Buying Guides   |   Webinars   |   Resources   |   Classifieds
REGISTER AND SUBSCRIBE:      Free PaintSquare Registration   |   Subscribe to JPCL   |   Subscribe to PaintSquare News
MORE:      About PaintSquare.com   |   Privacy policy   |   Terms & conditions   |   Site Map   |   Search   |   Contact Us
 

© Copyright 2000-2016, Technology Publishing / PaintSquare, All rights reserved
2100 Wharton Street, Suite 310, Pittsburgh PA 15203-1951; Tel 1-412-431-8300; Fax 1-412-431-5428; E-mail webmaster@paintsquare.com