PaintSquare.com
      | Connect Follow us on Twitter Like us on Facebook
About | Subscribe | Advertise
  

 

Poll

| More

January 27 - January 31, 2014

Some building professionals complain that building codes are revised too often. How often should codes be revised for significant building or energy-efficient practices?


As often as the local authority deems necessary
No more than every three years
No more than every five years
No more than every 10 years

Voting for this poll closed on Friday, January 31, 2014



Tagged categories: Building codes
   

View Results | Suggest a topic


Previous Polls from the Past Month

January 20 - January 24, 2014
Gridlock in 112th Congress

January 13 - January 18, 2014
Who should set the minimum wage

January 2 - January 12, 2014
New Year's goals


More previous polls

Nationwide Overspray
Profession Overspray Removal Services

The Finest Name in Safe Overspray Removal. We specialize in removing all contaminants from any surface. Family Owned and Operated for 33 years! Fully insured. Satisfaction is guaranteed.


Tarps manufacturing, Inc.
QUALITY MADE IN AMERICA —Available near you!

CLICK to get a behind-the-scenes look at how Tarps Manufacturing makes the highest-quality tarps right here in the USA — available nationwide.


Novetas Solutions
Safer Abrasive! 100% Recycled Glass!

NO Free Silica, Beryllium or other human Toxins! Great White Metal Finish and safer than Slags!
Call us at 866-775- 6226


N.T. Ruddock Co.

Our Abrasives Hold Up Under Pressure

N. T. Ruddock focuses on abrasive selection, equipment evaluation, equipment maintenance & reduction of abrasive consumption. Other services include Screen Analysis & Background Radiation Testing.


DRYCO
Environmental Controls
Equipment & Service

Temporary climate control equipment. Dehumidifiers,
Heaters, A/C, Power, More…
Call: 866-379-2600


Atlantic Design, Inc.
CLICK TO SEE...

what we did to this machine! Let ADI upgrade your machine, extending the life, efficiency, and value. Any make. Like new, but better! 866.Call.ADI


DeFelsko Corporation
PosiTector Inspection Kits

PosiTector 6000 Coating Thickness Gage easily converts to a surface profile gage, dew point meter or ultrasonic wall thickness gage with a simple probe change


Novatek Corporation
Dustless Coatings Removal

Strip it, clean it, and profile it,
all dust free! High production
rates and Blast like finishes.
Comply with new lead
standards.


SAFE Systems, Inc.
SAFE Systems'
Blast Lights &
Deadman Switches

Halogen or LED blast lights available with our NEW urethane bumper. Switches available in many colors for color coding your hoses.

 
 
 
Technology Publishing

The Technology Publishing Network

The Journal of Protective Coatings & Linings (JPCL) PaintSquare
Durability + Design Paint BidTracker

 
EXPLORE:      JPCL   |   PaintSquare News   |   Interact   |   Buying Guides   |   Webinars   |   Resources   |   Classifieds
REGISTER AND SUBSCRIBE:      Free PaintSquare Registration   |   Subscribe to JPCL   |   Subscribe to PaintSquare News
MORE:      About PaintSquare.com   |   Privacy policy   |   Terms & conditions   |   Site Map   |   Search   |   Contact Us
 

© Copyright 2000-2016, Technology Publishing / PaintSquare, All rights reserved
2100 Wharton Street, Suite 310, Pittsburgh PA 15203-1951; Tel 1-412-431-8300; Fax 1-412-431-5428; E-mail webmaster@paintsquare.com