PaintSquare.com
      | Connect Follow us on Twitter Like us on Facebook
About | Subscribe | Advertise
  

 

Poll

| More

September 12 - September 18, 2011

Half of Massachusetts’ bridge and highway projects are completed late—many of them, years late, a new report shows. In your experience, what is the chief cause of project delays?



More items for Program/Project Management

Weather or other external factors
Coordination with other trades
Supply issues
Client changes
Deficiencies in project management

Voting for this poll closed on Sunday, September 18, 2011



Tagged categories: Project Management
   

View Results | Suggest a topic


Previous Polls from the Past Month

September 5 - September 11, 2011
Who provides the best advancements in coating materials

August 29 - September 4, 2011
The effect of public anger ignited by the debt battle

August 22 - August 28, 2011
The most common cause of premature coating failures


More previous polls

PPG Protective and Marine Coatings Group
Bringing innovation to the surface.™

PPG Protective & Marine Coatings is widely recognized as a world leader in protective and marine coatings, developing innovative, cutting-edge products and services.


Blastman Robotics Ltd.
Robotic Blast Cleaning

Replace manual blasting with new Blastman robot models. Contact us to boost your production and save costs!


Park Derochie Coatings Ltd.
www.ParkDerochie.com

Coatings          Fireproofing
Sandblasting     Scaffolding
Metalizing           Insulation

• Shop & Field Services
• SSPC Certified
• NACE Inspectors on staff
• New Construction &
  Maintenance Programs


Industrial Vacuum Equipment Corp.
Hurricane Vacuums
& Dust Collectors

Vacuum and dust collector hose, filters and related accessories.
IndustrialVacuum.com


Clemco Industries Corp.
Powerful Protection in a Small Package

Mounts inside blast helmet, alerts operator to dangerous breathing-air condition by audible, visual, and vibratory alarms. Easily calibrated, battery operated.


Advanced Recycling Systems
ADVANCED RECYCLING SYSTEMS (ARS)

Recycling Machines, Dust Collectors, Rapid Deployment units are time-tested and approved for the rugged industrial environment. Contact ARS today!
(330)536-8210


DeFelsko Corporation
PosiTector Inspection Kits

PosiTector 6000 Coating Thickness Gage easily converts to a surface profile gage, dew point meter or ultrasonic wall thickness gage with a simple probe change


Atlantic Design, Inc.
CLICK HERE

to see what we did to this dust collector! ADI can increase the efficiency and life of your equipment! Any brand, for less than new! 866.Call.ADI


Dampney Co., Inc.
High Heat Stainless Steel Paint & Coating

Wood burning stoves, fire pits, BBQ Smokers, Exhaust Manifolds Aerosol Cans, Quarts, Gallons, 5 gallons 1200F resistance


Safway Services
Superior Suspended Access with QuikDeck®

Get improved platform stability with QuikDeck®. Open workspace designed for fast installation and safety. Easily moved to reduce cost. Safe to the environment.

 
 
 
Technology Publishing

The Technology Publishing Network

The Journal of Protective Coatings & Linings (JPCL) PaintSquare
Durability + Design Paint BidTracker

 
EXPLORE:      JPCL   |   PaintSquare News   |   Interact   |   Buying Guides   |   Webinars   |   Resources   |   Classifieds
REGISTER AND SUBSCRIBE:      Free PaintSquare Registration   |   Subscribe to JPCL   |   Subscribe to PaintSquare News
MORE:      About PaintSquare.com   |   Privacy policy   |   Terms & conditions   |   Site Map   |   Search   |   Contact Us
 

© Copyright 2000-2016, Technology Publishing / PaintSquare, All rights reserved
2100 Wharton Street, Suite 310, Pittsburgh PA 15203-1951; Tel 1-412-431-8300; Fax 1-412-431-5428; E-mail webmaster@paintsquare.com