| Connect Follow us on Twitter Like us on Facebook
About | Subscribe | Advertise



| More

September 12 - September 18, 2011

Half of Massachusetts’ bridge and highway projects are completed late—many of them, years late, a new report shows. In your experience, what is the chief cause of project delays?

More items for Program/Project Management

Weather or other external factors
Coordination with other trades
Supply issues
Client changes
Deficiencies in project management

Voting for this poll closed on Sunday, September 18, 2011

Tagged categories: Project Management

View Results | Suggest a topic

Previous Polls from the Past Month

September 5 - September 11, 2011
Who provides the best advancements in coating materials

August 29 - September 4, 2011
The effect of public anger ignited by the debt battle

August 22 - August 28, 2011
The most common cause of premature coating failures

More previous polls

Desco Mfg. Co., Inc.

Steel Fabrication

• Shipyards
• Plate Fabrication
• Structural Steel
• Maintenance

DESCO Mfg.Co., Inc.

Sika® Industrial Floor Coatings

Click to learn about floor and wall systems relied upon for performance, durability, easy maintenance and aesthetics across the every industry and environment.

Tarps manufacturing, Inc.
QUALITY MADE IN AMERICA —Available near you!

CLICK to get a behind-the-scenes look at how Tarps Manufacturing makes the highest-quality tarps right here in the USA — available nationwide.

Blastman Robotics Ltd.
Robotic Blast Cleaning

Replace manual blasting with new Blastman robot models. Contact us to boost your production and save costs!

W Abrasives - Surf Prep Pack

Experts in surface preparation are not working only on greens. To discover the SURF PREP PACK dedicated to experts. Visit our website,

Safway Services
Safeguard Assets. Ensure Productivity. HAKI®

Protect assets and equipment. Keep facilities open and operational. Maintain schedules regardless of weather. Ensure smooth and continuous production. Easy to erect. Safway is the primary distributor of HAKI® products including HAKISPAN and HAKITEC® 750 – in North America.

Clemco Industries Corp.
Powerful Protection in a Small Package

Mounts inside blast helmet, alerts operator to dangerous breathing-air condition by audible, visual, and vibratory alarms. Easily calibrated, battery operated.

Fischer Technology Inc.
DUALSCOPE®FMP100 with DataCenter IP

Transfer customized inspection plans from PC to FMP100 using step-by-step guidance with prompts and pictures throughout the measurement procedure

KTA-Tator, Inc. - Corporate Office

• Coating failure analysis
• Independent
  comparative testing
• Accelerated
  weathering testing
• Toxic metals testing
• A2LA Accredited
Contact: Cindy O'Malley,
at 412-788-1300 x180

Novatek Corporation
Novatek Corporation, Dustless Coatings Removal

Strip, clean and profile all dust free! Comply with new lead standards. Contact today: (866) 563-7800

Technology Publishing

The Technology Publishing Network

The Journal of Protective Coatings & Linings (JPCL) PaintSquare
Durability + Design Paint BidTracker

EXPLORE:      JPCL   |   PaintSquare News   |   Interact   |   Buying Guides   |   Webinars   |   Resources   |   Classifieds
REGISTER AND SUBSCRIBE:      Free PaintSquare Registration   |   Subscribe to JPCL   |   Subscribe to PaintSquare News
MORE:      About   |   Privacy policy   |   Terms & conditions   |   Site Map   |   Search   |   Contact Us

© Copyright 2000-2016, Technology Publishing / PaintSquare, All rights reserved
2100 Wharton Street, Suite 310, Pittsburgh PA 15203-1951; Tel 1-412-431-8300; Fax 1-412-431-5428; E-mail