PaintSquare.com
      | Connect Follow us on Twitter Like us on Facebook
About | Subscribe | Advertise
  

 

Poll

| More

August 22 - August 28, 2011

In your experience, what is the most common cause of premature coating failures?



More items for Quality Control

Poor workmanship
Incorrect specification
Unforeseen exposure condition (due to design defect, for instance)
Defective coating material

Voting for this poll closed on Sunday, August 28, 2011



Tagged categories: Coating failure
   

View Results | Suggest a topic


Previous Polls from the Past Month

August 15 - August 21, 2011
Your company's approach to safety problems, internally, and on site

August 8 - August 14, 2011
Slashing transportation spending

August 1 - August 7, 2011
High profits


More previous polls

Fischer Technology Inc.
NEW PROBE FOR MEASURING TSA THICKNESS

Paired with the PHASCOPE PMP10, Fischer’s new probe is quick and accurate for measuring thermally sprayed aluminum on stainless steel. Click to learn more.


KTA-Tator, Inc. - Corporate Office
KTA-Tator
Coatings Inspection

Any structure, any height, any place - A qualified coatings inspector is always available. Call 1-800-245-6379.


HoldTight Solutions Inc.
NO FLASH RUST - NO CONTAMINANTS

Our HoldTight®102 salt remover & flash rust
preventer prevents flash
rust by removing surface contaminants. Contact us
for your nearest distributor.
(800) 319.8802 sales@holdtight.com


DeFelsko Corporation
NEW PosiTector Shore Harness Durometer

PosiTector SHD measures the hardness of non-metallic materials. Features a digital display, measurement timer, memory, and PosiTector interchangeability.


NACE
It pays to be a know-it-all!

This compilation of articles offers a wealth of information about concrete and corrosion. Ideal for anyone working with concrete. Keep handy for easy reference!


SAFE Systems, Inc.
Custom blast rooms
by SAFE Systems

Don't waste time and money "making do" with a "standard" design. Let us work with you to design and build the system that best fits your requirements.
Call 1-800-634-7278


Covestro Deutschland
What keeps contractors one layer ahead when finishing their projects?

The answer: Pasquick®. Thanks to Pasquick®, one layer of coating is saved – resulting in faster workflows and earlier project finishing. Learn more.


WINOA Group
W Abrasives - Surf Prep Pack

Experts in surface preparation are not working only on greens. To discover the SURF PREP PACK dedicated to experts. Visit our website, www.wabrasives.com.

 
 
 
Technology Publishing

The Technology Publishing Network

The Journal of Protective Coatings & Linings (JPCL) PaintSquare
Durability + Design Paint BidTracker

 
EXPLORE:      JPCL   |   PaintSquare News   |   Interact   |   Buying Guides   |   Webinars   |   Resources   |   Classifieds
REGISTER AND SUBSCRIBE:      Free PaintSquare Registration   |   Subscribe to JPCL   |   Subscribe to PaintSquare News
MORE:      About PaintSquare.com   |   Privacy policy   |   Terms & conditions   |   Site Map   |   Search   |   Contact Us
 

© Copyright 2000-2016, Technology Publishing / PaintSquare, All rights reserved
2100 Wharton Street, Suite 310, Pittsburgh PA 15203-1951; Tel 1-412-431-8300; Fax 1-412-431-5428; E-mail webmaster@paintsquare.com