PaintSquare.com
Follow us on Twitter Follow us on LinkedIn Like us on Facebook Follow us on Instagram Visit the TPC Store
Search the site

 

Poll

| More

February 28 - March 6, 2011

What do you think of President Obama’s six-year, $556 billion infrastructure/transit proposal?

More items for Program/Project Management

Scrap it. We can’t afford it.
Fund it, whatever it takes. Our infrastructure is a catastrophe waiting to happen.
Not sure. Show me the money details.
Take out the rail piece; fund the rest.

Voting for this poll closed on Sunday, March 6, 2011



Tagged categories: Economy; Funding; Government; Infrastructure; Public Transit
   

View Results | Suggest a topic


Previous Polls from the Past Month

February 21 - February 27, 2011
Participating in webinars

February 14 - February 20, 2011
Sarah Palin as a presidential candidate in 2012

February 7 - February 13, 2011
Where current coatings R&D should be focused


More previous polls
Advertisements
 
International Bridge Conference
 
2017 International Bridge Conference
 
June 4-8, 2017, National Harbor, Maryland
 

 
Detail Masters
 
Overspray Removal
 
We offer professional, turnkey service and unparalleled quality!
Our process can save hundreds— even thousands of dollars. It's fast, environmentally safe and 100% guaranteed.
 

 
SABRE Autonomous Solutions
 
Introducing the ALPHA1 Blasting Robot
 
Once installed and commissioned – simply
SCAN PLAN BLAST.
 

 
SEMicro Division, M.E. Taylor Engineering, Inc.
 
Coatings Adhesion Testers
 
The PATTI® accurately measures the bond strength between coating & substrate. Outfitted properly, the surface can be rough, porous, or curved & >10K psi strong!
 

 
Absolute Equipment/Grand Rental Station
 
TIER 4 EQUIPMENT
 
We have Tier 4 Equipment including Air Compressors & Generators for Sale & Rent! Your job may now require Tier-4. www.absoluteequip.com or Call 412-931-6655.
 

 
Termarust Technologies
 
Termarust (HR CSA) Chemically Stops
Active Corrosion
 
Arch truss treated with Termarust's (HR CSA) in 2003. This steel arch bridge is rust free on all surfaces including the crevice corroded joints and connections.
 

 
Atlantic Design, Inc.
 
CLICK HERE
 
to see what we did to this dust collector! ADI can increase the efficiency and life of your equipment! Any brand, for less than new! 866.Call.ADI
 

 
Montipower, Inc.
 
The MBX Bristle Blaster
 
Get a 2.7 to 3.3 mil profile and a Near White Metal Clean. For info visit www.mbxit.com or call 877 629-8777
 

 
Aggreko
 
Climate Control Rental Solutions
 
Aggreko offers rental solutions for your painting/coating project. Dehumidifiers, heating, power and 24/7 service, nationwide.
844-433-9802
 

 
Clemco Industries Corp.
 
Maximum Dust Suppression Systems Start at $14,950
 
The system comprises proven technology and equipment with user-friendly flexibility in mind. See it in action.
 

 
 
 

Technology Publishing Co., 2100 Wharton Street, Suite 310, Pittsburgh PA 15203-1951

TEL 1-412-431-8300  • FAX  1-412-431-5428  •  EMAIL webmaster@paintsquare.com


The Technology Publishing Network

Durability + Design PaintSquare the Journal of Protective Coatings & Linings Paint BidTracker

 
EXPLORE:      JPCL   |   PaintSquare News   |   Interact   |   Buying Guides   |   Webinars   |   Resources   |   Classifieds
REGISTER AND SUBSCRIBE:      Free PaintSquare Registration   |   Subscribe to JPCL   |   Subscribe to PaintSquare News
MORE:      About PaintSquare.com   |   Privacy policy   |   Terms & conditions   |   Site Map   |   Search   |   Contact Us