PaintSquare.com
      | Connect Follow us on Twitter Like us on Facebook
About | Subscribe | Advertise
  

 


June 16 - June 20, 2014

A California utility wants the authority to remove trees and structures from private property if they threaten pipeline integrity. What do you think?



More items for Program/Project Management
Answers Votes
It's a public safety issue; the utility should have the final say. 30%
The property owner should have the final say. 16%
A third-party mediator should help the parties forge a compromise. 50%
Settle it in the courts, before a judge. 4%


Suggest a topic

   

Tagged categories: Pipeline; Pipelines

Comment from Karen Fischer, (6/18/2014, 9:25 AM)

Another erosion of property rights.... If the pipeline came AFTER the structures, why should the property owner lose their house, garage, shed, barn etc;? When it comes down to it, this could mushroom into a lot of problems for millions of property owners who have a natural gas pipeline running in front of their houses as most Urban dwellers have. The text and meaning of new laws never remain the same, they morph into just more regulation & control. This is a land grab and an erosion of property rights, government handing over our rights to a mega-business.


Comment from Tom Schwerdt, (6/19/2014, 8:14 AM)

Not a lot of pipelines come AFTER the structures, if the structure is close enough to cause integrity concerns. Typically pipelines are installed open-trench. Lots cheaper that way.


Comment from M. Halliwell, (6/19/2014, 10:38 AM)

The mediator solution seems like the best option for those that are existing. Perhaps for future installations, the utilities need to look at routing their pipes within a small right-of-way. Then all you need in the right-of-way is agreements for maintenance (i.e. landowner gets a small stipend to do upkeep such as mowing the grass) but the utility can come in to prevent root issues (with proper restoration once the work is completed).


Comment from Karen Fischer, (6/19/2014, 12:26 PM)

Tom, this is not necessarily the case. In my geographical area, a pipeline was placed right on the property line between two residential properties. The homes (which existed at the time) are less than 50' from the buried pipeline. Emminent domain at work on that one. Property owners had NO say in it. It does happen...


Comment from Tom Schwerdt, (6/20/2014, 8:28 AM)

Karen, sure - it can happen that a pipeline is installed later near structures. However, it's a pretty big engineering screwup if the existing structures "threaten pipeline integrity" - which was the topic here. The engineering analysis performed before the pipeline goes in must take those structures into account.


Comment Join the Conversation:

Sign in to our community to add your comments.

SAFE Systems, Inc.
Custom blast rooms
by SAFE Systems

Don't waste time and money "making do" with a "standard" design. Let us work with you to design and build the
system that best fits
your requirements.
Call 1-800-634-7278


Tinker & Rasor
Holiday Detectors Made in the USA

When it comes to coating inspection, get the right instrument for the job. Tinker & Rasor pulse –type DC holiday detectors come standard with the widest voltage range available, 800 volts to 35,000 volts in one instrument.


LS Industries
LS Blasters: Optimum Steel Cleaning Efficiency

Simplify surface prep with the precise shot control of LS Blasters. Our blast technology delivers optimum coverage and finish. 800-533-8008


Armakleen Company, The
ARMEX when nondestructive cleaning is critical

The gentle physical propriety of baking soda but yet aggressive cleaning ability is what makes ARMEX the only choice for nondestructive abrasive blasting.


Midsun Specialty Products
Stopaq 30+ Year Coatings

Use Stopaq corrosion prevention coatings on pipelines, field joints, tank chimes, structural steel and more. Learn more at www.midsunsp.com/stopaq


WINOA Group
Steel Abrasives :Think Premium

The Premium series is the perfect mix of high-quality products and related technical services provided by skilled experts. Visit us during the GIFA (Hall15 - D14).


Termarust Technologies
Termarust (HR CSA) Chemically Stops
Active Corrosion

Pipeline Utility Aerial crossings coated since 1992. Termarust's (HR CSA) was used to overcoat lead paint and preserve cables, pipes and support towers.


Clemco Industries Corp.
Powerful Protection in a Small Package

Mounts inside blast helmet, alerts operator to dangerous breathing-air condition by audible, visual, and vibratory alarms. Easily calibrated, battery operated.

 
 
 
Technology Publishing

The Technology Publishing Network

The Journal of Protective Coatings & Linings (JPCL) PaintSquare
Durability + Design Paint BidTracker

 
EXPLORE:      JPCL   |   PaintSquare News   |   Interact   |   Buying Guides   |   Webinars   |   Resources   |   Classifieds
REGISTER AND SUBSCRIBE:      Free PaintSquare Registration   |   Subscribe to JPCL   |   Subscribe to PaintSquare News
MORE:      About PaintSquare.com   |   Privacy policy   |   Terms & conditions   |   Site Map   |   Search   |   Contact Us
 

© Copyright 2000-2015, Technology Publishing / PaintSquare, All rights reserved
2100 Wharton Street, Suite 310, Pittsburgh PA 15203-1951; Tel 1-412-431-8300; Fax 1-412-431-5428; E-mail webmaster@paintsquare.com