PaintSquare.com
      | Connect Follow us on Twitter Like us on Facebook
About | Subscribe | Advertise
  

 


September 12 - September 18, 2011

Half of Massachusetts’ bridge and highway projects are completed late—many of them, years late, a new report shows. In your experience, what is the chief cause of project delays?



More items for Program/Project Management
Answers Votes
Weather or other external factors 19%
Coordination with other trades 12%
Supply issues 0%
Client changes 16%
Deficiencies in project management 53%


Suggest a topic

   

Tagged categories: Project Management

PPG Protective and Marine Coatings Group
Bringing innovation to the surface.™

PPG Protective & Marine Coatings is widely recognized as a world leader in protective and marine coatings, developing innovative, cutting-edge products and services.


Industrial Vacuum Equipment Corp.
Hurricane Vacuums
& Dust Collectors

Vacuum and dust collector hose, filters and related accessories.
IndustrialVacuum.com


Novatek Corporation
Dustless Coatings Removal

Strip it, clean it, and profile it,
all dust free! High production
rates and Blast like finishes.
Comply with new lead
standards.


SABRE Autonomous Solutions
Safety, Productivity, Quality. Robotic Blasting

Learn how this simple to use, field deployed, automatic robot is eliminating hazards in major confined, cluttered and complex surface preparation projects.


Polyval Coatings
Polyflex® Polyurea Linings

Polyflex™ new Polyurea Geotextile Membrane System has been specifically engineered to protect the environment in containment applications.
www.polyflexlinings.com


Corrosion Probe, Inc.
From Detection to Correction

Corrosion Probe, Inc. has the Most Concrete Coatings Experience and Expertise. Contact us today at
860-767-4402, www.cpiengineering.com


Easy-Kleen Pressure Systems Ltd.
HIGH PRESSURE HOT WATER/STEAM UNITS

3000 to 8000 PSI ALL IN ONE: Water tank, reels and unit enclosed in an industrial skid frame. Call Today and ask about the Fill & Play Series 1-800-315-5533


Armakleen Company, The
ARMEX is The Only Choice

When removing coatings & cleaning substrates that cannot be damaged the only blasting abrasive to use is ARMEX. ARMEX for when Non-Destructive Cleaning is Critical.


HoldTight Solutions Inc.
NO FLASH RUST -
NO CONTAMINANTS

Our HoldTight®102 salt remover & flash rust preventer prevents flash
rust by removing surface contaminants. It has no equal; only wannabees.
Contact us for your
nearest distributor.
(800) 319.8802 sales@holdtight.com


KTA-Tator, Inc. - Corporate Office
KTA-Tator EH&S Services

• Ambient & Worker Exposure Air Monitoring
• Safety & Health Program Development
• Lead Paint Assessments
& Specifications
• Health Hazard & Jobsite Safety Assessments
Call 1-800-245-6379

 
 
 
Technology Publishing

The Technology Publishing Network

The Journal of Protective Coatings & Linings (JPCL) PaintSquare
Durability + Design Paint BidTracker

 
EXPLORE:      JPCL   |   PaintSquare News   |   Interact   |   Buying Guides   |   Webinars   |   Resources   |   Classifieds
REGISTER AND SUBSCRIBE:      Free PaintSquare Registration   |   Subscribe to JPCL   |   Subscribe to PaintSquare News
MORE:      About PaintSquare.com   |   Privacy policy   |   Terms & conditions   |   Site Map   |   Search   |   Contact Us
 

© Copyright 2000-2016, Technology Publishing / PaintSquare, All rights reserved
2100 Wharton Street, Suite 310, Pittsburgh PA 15203-1951; Tel 1-412-431-8300; Fax 1-412-431-5428; E-mail webmaster@paintsquare.com