PaintSquare.com


The First Word in Protective & Marine Coatings

A Product of Technology Publishing / PaintSquare
JPCL | PaintSquare News | Durability + Design | Paint BidTracker

Get Paint BidTracker's Bridge Painting Opportunities of 2015

Paint and Coatings Industry News

Main News Page


UK Ship Company Fined for Paint Waste

Tuesday, July 23, 2013

More items for Environmental Controls

More items from Europe

Comment | More

A ship repair company in the United Kingdom was fined after it released toxic waste paint into a protected environmental area, the local government announced.

A&P Falmouth Ltd. was fined £10,000 ($15,364 USD), with costs of over £14,000 ($21,509.60 USD) awarded to the Environment Agency and Cornwall Council, the local authority for Cornwall, England, after the company pleaded guilty to an 'Environmental Permitting' Regulations offense at a hearing held in Truro Magistrates Court on July 5, the Cornwall Council announced.

A&P Falmouth operates a ship repair business that includes stripping paint from vessels and applying new surface coatings in dry dock.

A&P Falmouth
A&P Falmouth

A UK ship repair company was recently fined after pleading guilty to releasing waste paint containing copper, zinc, lead and tributyltin into an environmentally protected area.

The guilty plea stemmed from an incident on Sept. 29, 2011, when waste paint containing toxic substances was unintentionally discharged into the Fal Estuary from the Queen Elizabeth Dry Dock.

Several Toxic Substances Leaked

The paint discharge caused a visible plume, approximately the size of a "football pitch," which is a playing field that can range from 100 to 130 yards in length and 50 and 100 yards in width, according to BBC Sport.

The plume contained toxic substances including tributyltin, copper, zinc and lead.

"It is extremely rare for enforcement action to be taken against businesses carrying out activities requiring a permit because the vast majority recognise the importance of fulfilling their environmental and legal responsibilities," said Rebecca Kirk, Cornwall Council Assistant Head of Service for Community and Environmental Protection.

"However, in this particular instance A&P Falmouth fell significantly short of this standard by failing to meet the requirements of their permit. This meant that there was little option but to take enforcement action, as is the public expectation in such cases especially where the release of toxic subtances in the environment are concerned," Kirk said.

RFA Cardigan Bay
RoyalNavy.mod.uk

A&P Falmouth was using ultra-high-pressure waterjetting to remove coatings from the RFA Cardigan Bay class ship, a Royal Fleet Auxilliary vessel, when it released the toxic paint waste.

The estuary is part of a Special Area of Conservation, a European designation to protect rare and threatened wildlife, and is close to Sites of Special Scientific Interest (SSSI), a conservation designation for a protected area in the UK.

Company Apologizes

The waste paint discharged into the estuary was from the RFA Cardigan Bay, which was in dry dock for a complete refit, including removal of antifouling paint from the entire hull using ultra-high-pressure waterjetting prior to recoating.

RFA Cardigan Bay class ship is a Royal Fleet Auxilliary vessel that delivers the Royal Navy, can support the Royal Marines and can assist in disaster and humanitarian relief.

For this type of work, a permit is required under environmental legislation, which is issued and regulated by the Public Health and Protection Service (PH&P) or Cornwall Council. The permit contains conditions to ensure that pollution is prevented and/or controlled and includes conditions related to discharges to water drafted by the Environment Agency.

The incident was reported anonymously, and an Environment Agency officer took a boat out on the estuary to take samples of the water.

A&P Falmouth apologized for the incident and stated that it was an isolated occurence cause by washing out paint sludge that had fallen onto the floor of the dry dock.

"A&P takes its envirnmental responsibilities very seriously and our activities are strictly regulated. We deeply regret and apologise for this accidental discharge and have taken steps to ensure that it will not happen again," said Peter Child, A&P Falmouth managing director, the Falmouth Packet reported.

The company has since taken measures to prevent any similar incidents from occuring, according to the Cornwall Council.

   

Tagged categories: Enforcement; Environmental Protection; Shipyards; UHP waterjetting

Comment from Gordon Kuljian, (7/23/2013, 2:37 PM)

Unfortunate occurrence. UHPWJ is and has been a great technology for the ship repair insustry. Those utilizing it however must be trained in proper collection, disposal and treatment.


Comment Join the Conversation:

Sign in to our community to add your comments.

Barton International
East Coast Shipyard Cut Blasting Costs 30% with BARTON

A comparison trial convinced this shipyard that they could realize significant savings by switching to Barton’s garnet instead of coal or copper slag.
Watch the video now.


CHLOR*RID International Inc.
Free Webinar

Learn about soluble salts, along with a discussion on allowable levels.
More information at
www.chlor-rid.com,

800-422-3217


Graco Inc.
Blast with 92% less dust.

Graco EcoQuip Vapor Blast equipment performs as well as dry blasting, but reduces airborne dust up to 92%! Use less media, save money in material and cleanup. See our FREE shipping offer!


DRYCO
The one way to control
a tank: DRYCO

Temporary climate control equipment. Dehumidifiers,
Heaters, A/C, Power, More…
Toll Free: 866-379-2600


Spider, a Division of SafeWorks, LLC
Complete Suspended Access Solutions

Need access? From platforms & hoists to rigging & fall protection, Spider leads the industry in rentals, sales & service. Call 877-774-3370 or click today.


Blastox/The TDJ Group, Inc.
Blastox - One Step
Lead Abatement

Don't waste $$ on added labor steps with other methods. Don't mix, meter or apply at the job-site. Avoid strict hazardous waste rules.
Let your painters paint!


Advanced Recycling Systems
ADVANCED RECYCLING SYSTEMS (ARS)

Recycling Machines, Dust Collectors, Rapid Deployment units are time-tested and approved for the rugged industrial environment. Contact ARS today!
(330)536-8210

 
 
 
Technology Publishing

The Technology Publishing Network

The Journal of Protective Coatings & Linings (JPCL) PaintSquare
Durability + Design Paint BidTracker JPCL Europe

 
EXPLORE:      JPCL   |   PaintSquare News   |   Interact   |   Buying Guides   |   Webinars   |   Resources   |   Classifieds
REGISTER AND SUBSCRIBE:      Free PaintSquare Registration   |   Subscribe to JPCL   |   Subscribe to PaintSquare News
MORE:      About PaintSquare.com   |   Privacy policy   |   Terms & conditions   |   Site Map   |   Search   |   Contact Us
 

© Copyright 2000-2014, Technology Publishing / PaintSquare, All rights reserved
2100 Wharton Street, Suite 310, Pittsburgh PA 15203-1951; Tel 1-412-431-8300; Fax 1-412-431-5428; E-mail webmaster@paintsquare.com