PaintSquare.com
      | Connect Follow us on Twitter Like us on Facebook
About | Subscribe | Advertise
  

 

Free Download of our eBook on Overcoating Bridges and Other Structures

Paint and Coatings Industry News

Main News Page


Longest Cable-Stayed Bridge Opens

Monday, July 22, 2013

More items for Program/Project Management

More items from Asia Pacific

Comment | More

The world’s longest cable-stayed bridge opened at the stroke of midnight Thursday (July 18) in China, after four and a half years of construction.

The Jiashao Bridge stretches across the Hangzhou Bay with a span that is 10.1 km (6.28 miles) long; the entire structure measures more than 60 km (37.28 miles) in length.

Jiashao Bridge China
Photos: Xinhuanet.com

With its longest span reaching a length of 6.28 miles, the Jiashao Bridge in China is now the world's longest cable-stayed bridge. It opened at midnight on Thursday (July 18).

Travelers eager to drive across the bridge started to line up three hours before it opened, Zhejiang News reported.

Commute Cut in Half

The eight-lane bridge connects two cities in the Zhejiang province, Jiaxing and Shaoxing. Shanghai, located northeast of Jiaxing, would usually take drivers three hours to get to from Shaoxing, but that time is now cut in half with the new bridge.

The bridge is the second cross-sea bridge over Hangzhou Bay. Construction of the Jiashao Bridge started on Dec. 14, 2008.

According to South China Morning Post, the first person to cross the bridge was Li Xinqiao, a businessman traveling to Shanghai. Planning to travel to Shanghai in the afternoon, Xinqiao decided to make the trip earlier once he learned the bridge would open at midnight. (Coincidentally, "xinqiao" can mean "new bridge" in Chinese.)

longest cable stayed bridge

Construction on the bridge started in December 2008 and was featured on the Discovery Channel.

While under construction, the bridge was featured on the Discovery Channel show "Man Made Marvels."

Before the Jiashao Bridge was completed, the Russky Bridge in Russia held the title for the longest cable-stayed bridge with its longest span reaching 0.69 miles.

Drivers will be charged a toll of ¥40 ($6.52 USD).

   

Tagged categories: Bridges; Construction

Comment from Jianhua Yan, (7/22/2013, 9:40 PM)

Just an white elephant


Comment from Chuck Pease, (7/27/2013, 12:58 PM)

Jianhua Yan, please elaborate on your comment. Thank you


Comment Join the Conversation:

Sign in to our community to add your comments.

Desco Mfg. Co., Inc.
DUST-FREE SOLUTIONS For Lead Abatement

Tools operate at levels well below OSHA limits for hazardous material removal; meet SP11 specifications when required and low vibration tools increase productivity.


SABRE Autonomous Solutions
Safety, Productivity, Quality. Robotic Blasting

Learn how this simple to use, field deployed, automatic robot is eliminating hazards in major confined, cluttered and complex surface preparation projects.


Park Derochie Coatings Ltd.
www.ParkDerochie.com

Coatings          Fireproofing
Sandblasting     Scaffolding
Metalizing           Insulation

• Shop & Field Services
• SSPC Certified
• NACE Inspectors on staff
• New Construction &
  Maintenance Programs


Novetas Solutions
Number 1 Crushed Glass Abrasive in America!

Manufactured from 100% Recycled Glass.
NO Crystalline Silica,
Beryllium & Arsenic
Great White Metal Finish!
4 plants on Navy QPL
Call us at 866-775-6226


SAFE Systems, Inc.
Custom blast rooms
by SAFE Systems

Don't waste time and money "making do" with a "standard" design. Let us work with you to design and build the system that best fits your requirements.
Call 1-800-634-7278


Novatek Corporation
Novatek Corporation, Dustless Coatings Removal

Strip, clean and profile all dust free! Comply with new lead standards. Contact today: (866) 563-7800


Atlantic Design, Inc.
GOING BEYOND INDUSTRY STANDARDS

The ADI HD40 Dust Collector is a smaller, more economical way to meet/ exceed Industry standards. Watch the video for details on our website. 866.Call.ADI


Safway Services
Superior Suspended Access with QuikDeck®

Get improved platform stability with QuikDeck®. Open workspace designed for fast installation and safety. Easily moved to reduce cost. Safe to the environment.


Clemco International GmbH
Global engineering-trusted solutions

For more than 70 years, Clemco has provided the highest quality blast equipment with a total commitment to comfort and safety.


HoldTight Solutions Inc.
NO FLASH RUST -
NO CONTAMINANTS

Our HoldTight®102 salt remover & flash rust preventer prevents flash rust by removing surface contaminants. It has no equal; only wannabees.
Contact us for your
nearest distributor.
(800) 319.8802 sales@holdtight.com

 
 
 
Technology Publishing

The Technology Publishing Network

The Journal of Protective Coatings & Linings (JPCL) PaintSquare
Durability + Design Paint BidTracker

 
EXPLORE:      JPCL   |   PaintSquare News   |   Interact   |   Buying Guides   |   Webinars   |   Resources   |   Classifieds
REGISTER AND SUBSCRIBE:      Free PaintSquare Registration   |   Subscribe to JPCL   |   Subscribe to PaintSquare News
MORE:      About PaintSquare.com   |   Privacy policy   |   Terms & conditions   |   Site Map   |   Search   |   Contact Us
 

© Copyright 2000-2016, Technology Publishing / PaintSquare, All rights reserved
2100 Wharton Street, Suite 310, Pittsburgh PA 15203-1951; Tel 1-412-431-8300; Fax 1-412-431-5428; E-mail webmaster@paintsquare.com