PaintSquare.com
      | Connect Follow us on Twitter Like us on Facebook
About | Subscribe | Advertise
  

 

Download our free Wastewater Treatment Coating Systems eResource Book

Paint and Coatings Industry News

Main News Page


Longest Cable-Stayed Bridge Opens

Monday, July 22, 2013

More items for Program/Project Management

More items from Asia Pacific

Comment | More

The world’s longest cable-stayed bridge opened at the stroke of midnight Thursday (July 18) in China, after four and a half years of construction.

The Jiashao Bridge stretches across the Hangzhou Bay with a span that is 10.1 km (6.28 miles) long; the entire structure measures more than 60 km (37.28 miles) in length.

Jiashao Bridge China
Photos: Xinhuanet.com

With its longest span reaching a length of 6.28 miles, the Jiashao Bridge in China is now the world's longest cable-stayed bridge. It opened at midnight on Thursday (July 18).

Travelers eager to drive across the bridge started to line up three hours before it opened, Zhejiang News reported.

Commute Cut in Half

The eight-lane bridge connects two cities in the Zhejiang province, Jiaxing and Shaoxing. Shanghai, located northeast of Jiaxing, would usually take drivers three hours to get to from Shaoxing, but that time is now cut in half with the new bridge.

The bridge is the second cross-sea bridge over Hangzhou Bay. Construction of the Jiashao Bridge started on Dec. 14, 2008.

According to South China Morning Post, the first person to cross the bridge was Li Xinqiao, a businessman traveling to Shanghai. Planning to travel to Shanghai in the afternoon, Xinqiao decided to make the trip earlier once he learned the bridge would open at midnight. (Coincidentally, "xinqiao" can mean "new bridge" in Chinese.)

longest cable stayed bridge

Construction on the bridge started in December 2008 and was featured on the Discovery Channel.

While under construction, the bridge was featured on the Discovery Channel show "Man Made Marvels."

Before the Jiashao Bridge was completed, the Russky Bridge in Russia held the title for the longest cable-stayed bridge with its longest span reaching 0.69 miles.

Drivers will be charged a toll of ¥40 ($6.52 USD).

   

Tagged categories: Bridges; Construction

Comment from Jianhua Yan, (7/22/2013, 9:40 PM)

Just an white elephant


Comment from Chuck Pease, (7/27/2013, 12:58 PM)

Jianhua Yan, please elaborate on your comment. Thank you


Comment Join the Conversation:

Sign in to our community to add your comments.

PPG Protective and Marine Coatings Group
Industrial strength performance in ONE can.

Now get the durability and protection of two components in one can: Amercoat® ONE, PSX® ONE and Sigmadur ONE.


SAFE Systems, Inc.
Enduroguard -
The Tough Cable
for a Tough Industry.

Reduce maintenance costs and down time, increase job site safety with Enduroguard Cable. Available exclusively from SAFE Systems. UL listed, flexible, abrasion resistant and cut resistant.


Abrasives Inc.
One Call Orders it All!

Life is good when it’s simple. We distribute Clemco blast equipment, nozzles & parts alongside our proven blast media. Make your call: Abrasives Inc. 800-584-7524


HoldTight Solutions Inc.
NO FLASH RUST -
NO CONTAMINANTS

Our HoldTight®102 salt remover & flash rust preventer prevents flash
rust by removing surface contaminants. It has no equal; only wannabees.
Contact us for your
nearest distributor.
(800) 319.8802 sales@holdtight.com


Atlantic Design, Inc.
MORE THAN JUST A SALES PITCH!

Simplicity! Dependability! Safety! We’ve built these features into every cleverly engineered inch of our newest models. It’s all there. 866.Call.ADI


Minerals Research & Recovery

HIGH PERFORMANCE ABRASIVES


“Made in the USA!”

Why recycle waste from other countries? Go FASTER, CLEANER, at 1/3 THE COST with MR&R “All-American” Sharpshot®HP!!

WATCH THE VIDEO


Clemco Industries Corp.
Global engineering-trusted solutions

For more than 70 years, Clemco has provided the highest quality blast equipment with a total commitment to comfort and safety.


Armorthane
Best Floor Coatings with Maximum Durability

Coat CONCRETE or WOOD flooring for wheel and foot traffic, chemical resistance, weather-proofing, indoors and outside. Variety of textures for beauty, resilience and safety.


U.S. Zinc
Logistics. Rely On U.S.

Whether via rail, truck, sea or air, you can trust our logistics services to deliver the product you need on time, every time.


Safway Services
One Source. Every Solution.

The Safway Group is your source for multiservices. Painting, coating, insulation and more – all from the most trusted name in the industry.

 
 
 
Technology Publishing

The Technology Publishing Network

The Journal of Protective Coatings & Linings (JPCL) PaintSquare
Durability + Design Paint BidTracker

 
EXPLORE:      JPCL   |   PaintSquare News   |   Interact   |   Buying Guides   |   Webinars   |   Resources   |   Classifieds
REGISTER AND SUBSCRIBE:      Free PaintSquare Registration   |   Subscribe to JPCL   |   Subscribe to PaintSquare News
MORE:      About PaintSquare.com   |   Privacy policy   |   Terms & conditions   |   Site Map   |   Search   |   Contact Us
 

© Copyright 2000-2015, Technology Publishing / PaintSquare, All rights reserved
2100 Wharton Street, Suite 310, Pittsburgh PA 15203-1951; Tel 1-412-431-8300; Fax 1-412-431-5428; E-mail webmaster@paintsquare.com