PaintSquare.com
Follow us on Twitter Follow us on LinkedIn Like us on Facebook Follow us on Instagram
Search the site

 

Download our FREE eResource: Specifier's Choice Guide. Get it now.

Coatings Industry News

Main News Page


Obama Urges Faster Track for Projects

Tuesday, May 21, 2013

Comment | More

Calling for more green lights and less red tape, President Obama has announced an initiative to halve the time needed to launch infrastructure construction projects.

The Presidential Memorandum—"Modernizing Federal Infrastructure Review and Permitting Regulations, Policies, and Procedures"—was announced Friday (May 17).

The plan tasks a federal panel with reviewing the entire process for infrastructure construction, to identify efficiencies and best practices in permitting, technologies and processes. At every stage, the goal is to expedite processes, streamline coordination, and prune delays and redundancies that slow projects.

"Our workers are at our best when we're building stuff," Obama said in a speech at Ellicott Dredges, a dredge equipment manufacturing company in Baltimore. "So today, I'm announcing the next step in our effort to cut through red tape that keeps big construction projects from getting off the ground."

speed up infrastructure
WhiteHouse.gov

President Obama announced an initiative to streamline and speed the process required before breaking ground on infrastructure construction projects

"Now, some of you, if you've heard me, I'm really big on us rebuilding our infrastructure in this country," said Obama. "I want to put people back to work improving our roads, our bridges, our airports, our ports."

Review Timeline

The memorandum gives the Steering Committee on Federal Infrastructure Permiting and Review Process Improvement 60 days to identify and prioritize opportunities to modernize key regulations, policies and procedures to reduce time.

The committee has 120 days from the memorandum date to prepare a plan for permitting infrastructure projects that identifies proposed actions and timelines to:

  • Institutionalize or expand best practices or process improvements that agencies are already implementing to improve the efficiency of reviews;
  • Revise key agency and government-wide review and permitting regulations, policies and procedures;
  • Identify high-performance attributes of infrastructure projects that demonstrate how the projects seek to advance existing statutory and policy objectives and how they lead to improved outcomes for communities and the environment;
  • Create process efficiencies, including additional use of concurrent and integrated reviews;
  • Identify opportunities to use existing share-in-cost authorities and other non-appropriated funding sources to support early coordination and project review;
  • Effectively engage the public and interested stakeholders;
  • Expand coordination with state, local, and tribal governments;
Presidential Memorandum
Virginia DOT

President Obama said it took too long for projects to get off the ground. His memorandum directs federal agencies to identify technologies and processes that can cut that time in half.

  • Expand the use of information technology and identify priority areas for investment to replace paperwork processes, enhance project siting decisions and interagency collaboration, and improve monitoring of project impact and mitigation committments; and
  • Improve mitigation policies to provide developers with added predictability, facilitate landscape-scale mitigation and interagency mitigation plans, and ensure accountability and effectiveness of mitigation activities.

'We Could Do It Faster'

"So we've got to up our game when it comes to infrastructure," Obama said. "[O]ne of the problems we've had in the past is, is that sometimes it takes too long to get projects off the ground. There are all these permits and red tape and planning, and this and that, and some of it's important to do, but we could do it faster."

"Today, I'm directing agencies across the government to do what it takes to cut timelines for breaking ground on major infrastructure projects in half."

Infrastructure sectors covered by the effort include surface transportation, ports, water resources and systems, renewable energy generation, conventional energy production in high-demand areas, electricity transmission, broadband and pipelines.

The modernization effort builds on Executive Order 13604, "Improving Performance of Federal Permitting and Review of Infrastructure Projects," which Obama implemented in March 2012.

   

Tagged categories: Bridges; Department of Transportation (DOT); Economy; Federal Highway Administration (FHWA); Infrastructure; Pipelines; President Obama; Roads/Highways

Comment from John Fauth, (5/21/2013, 8:21 AM)

How bad has regulation become when government complains about it?


Comment from Tom Schwerdt, (5/22/2013, 8:00 AM)

I read elsewhere that this streamlining will cut 3 years off the required prep/study/review time on major projects. Yes, three years.


Comment from josh hutcheson, (5/23/2013, 7:35 AM)

at the speed and rate the government works they might get some part of it in place in say ten years or so!!!


Comment Join the Conversation:

Sign in to our community to add your comments.

Advertisements
 
International Bridge Conference
 
2017 International Bridge Conference
 
June 4-8, 2017, National Harbor, Maryland
 

 
Industrial Vacuum Equipment Corp.
 
Hurricane Vacuums
& Dust Collectors
 
Vacuum and dust collector hose, filters and related accessories.
IndustrialVacuum.com
 

 
Detail Masters
 
Overspray Removal
 
We offer professional, turnkey service and unparalleled quality!
Our process can save hundreds— even thousands of dollars. It's fast, environmentally safe and 100% guaranteed.
 

 
US Minerals
 
Hit Harder. Clean Faster.
 
Black Diamond abrasive products are the toughest, most effective blasting media and supply the superior power you need to get any job done.
 

 
Atlantic Design, Inc.
 
ENGINEERING SOLUTIONS, NOT EXCUSES
 
See our website for features of our best seller, the ADI 3500CFM 4-Pot Blast Vacuum Recycler. A smaller package with all the ADI power you need. 866.Call.ADI
 

 
Sherwin-Williams
 
Sherwin-Williams Oil & Gas App
 
Our coatings and linings expertise available 24/7, allowing you to explore the best Sherwin-Williams solutions for oil refineries, shale drilling sites, and offshore. Android users
click here. Download today!
 

 
Termarust Technologies
 
Termarust (HR CSA) Chemically Stops
Active Corrosion
 
Arch truss treated with Termarust's (HR CSA) in 2003. This steel arch bridge is rust free on all surfaces including the crevice corroded joints and connections.
 

 
W Abrasives
 
Steel Abrasives from
W Abrasives
 
As the global leader in steel abrasives, W Abrasives material is the efficient and eco-friendly solution blasting with you to reach the perfect profile.
 

 
Mitsubishi Gas Chemical America
 
Performance Amine 1,3-BAC
 
A highly reactive cycloaliphatic diamine offering superior performance. Reasonable cost and curing efficacy makes it suitable for all types of epoxy resin applications.
 

 
Safway Services
 
Safeguard Assets. Ensure Productivity. HAKI®
 
Protect assets and equipment. Keep facilities open and operational. Maintain schedules regardless of weather. Ensure smooth and continuous production. Easy to erect. Safway is the primary distributor of HAKI® products including HAKISPAN and HAKITEC® 750 – in North America.
 

 
 
 

Technology Publishing Co., 2100 Wharton Street, Suite 310, Pittsburgh PA 15203-1951

TEL 1-412-431-8300  • FAX  1-412-431-5428  •  EMAIL webmaster@paintsquare.com


The Technology Publishing Network

Durability + Design PaintSquare the Journal of Protective Coatings & Linings Paint BidTracker

 
EXPLORE:      JPCL   |   PaintSquare News   |   Interact   |   Buying Guides   |   Webinars   |   Resources   |   Classifieds
REGISTER AND SUBSCRIBE:      Free PaintSquare Registration   |   Subscribe to JPCL   |   Subscribe to PaintSquare News
MORE:      About PaintSquare.com   |   Privacy policy   |   Terms & conditions   |   Site Map   |   Search   |   Contact Us