PaintSquare.com


The First Word in Protective & Marine Coatings

A Product of Technology Publishing / PaintSquare
JPCL | PaintSquare News | Durability + Design | Paint BidTracker

Equipment Suppliers: Get listed in the 2014 JPCL Equipment Buying Guide for FREE!

Paint and Coatings Industry News

Main News Page


Work Crew Destroys Ancient Pyramid

Thursday, May 16, 2013

More items for Program/Project Management

Comment | More

One of the oldest Mayan pyramids has been destroyed by construction crews digging for crushed rock to build a road in Belize.

Authorities said that a construction company was using bulldozers and backhoes to chip away at the Nohmul complex pyramid's sides until barely anything was left. Only a portion of the pyramid's core was reportedly left standing.

Jaime Awe, the head of the Belize Institute of Archaeology, said the Nohmul sat in the middle of a privately owned sugar cane field, and the builders could not have possibly mistaken the 100-foot-tall pyramid mound for a natural hill because the location is a flat area.

Nohmul complex
conzervative.wordpress.com

Once standing 100 feet tall, the Nohmul pyramid has been almost completely destroyed by a construction crew seeking material for road construction.

Although the pyramid was on private land, Belizean law puts any pre-Hispanic ruins under government protection. The ceremonial center dates back at least 2,300 years.

Nohmul, which means "Great Mound," is on a low limestone ridge that lies among sugarcane fields. It was most likely first occupied in the Middle Pre-Classic Period, according to Belize's National Institute of Culture and History.

'Bloody Laziness'

"These guys knew that this was an ancient structure. It's just bloody laziness," Awe said, according to the Huffington Post.

Awe said the destruction was discovered last week. Belizean police said they are conducting an investigation and criminal charges are possible.

"It's a feeling of incredible disbelief because of the ignorance and the insensitivity ... they were using this for road fill," said Awe. "It's like being punched in the stomach, it's just so horrendous."

The Institute of Archaeology is preparing a report for police.

According to an archaeologist, bulldozing ancient Mayan pyramids for road fill is not an uncommon problem in Belize and several other structures have been destroyed.

"I firmly believe it is important that we seek legal action otherwise we are sending a message that it is not important to preserve this heritage," Awe said, according to International Business Times.

"In this case charges against the construction company for willfully destroying an ancient monument and the land owner who have had to be given permission for the company to access the property and then allow the destruction to take place," said Awe.

However, this isn't the first time something like this has happened in Belize, according to Norman Hammond, an emeritus professor of archaeology at Boston University.

Hammond, who worked in Belizean research projects in the 1980s, wrote in an email to the Huffington Post that "bulldozing Maya mounds for road fill is an endemic problem in Belize (the whole of the San Estevan center has gone, both of the major pyramids at Louisville, other structures at Nohmul, many smaller sites), but this sounds like the biggest yet."

   

Tagged categories: Construction; Government; Historic Structures; Roads/Highways

Comment from shane hirvi, (5/16/2013, 8:36 AM)

Shame.


Comment from Douglas Howard, (5/16/2013, 11:37 PM)

It happens everyday in the U.S. You have to save it first for it to become 2,300 years old.


Comment Join the Conversation:

Sign in to our community to add your comments.

JPCL Europe
Special EMEA edition!

Now, the publisher of JPCL offers essential news and knowledge for protective and marine coatings professionals in Europe, the Middle East and Africa: www.jpcleurope.com


SAFE Systems, Inc.
Portable Dust Collectors for Tough Environments

Trailer and skid-mounted models in numerous sizes, powered by electric and/or diesel. Sloped roofs, multiple dust inlets, high static, dampered fans. Lockable power & drive compartments.


LS Industries
LS Blasters: Optimum Steel Cleaning Efficiency

Simplify surface prep with the precise shot control of LS Blasters. Our blast technology delivers optimum coverage and finish. 800-533-8008


Stable Lead (maker of FESI-BOND)
The ultimate lead stabilizing blast additive.

Stable Lead’s FESI-BOND BLAST X1, the only green, nontoxic, lead stabilizing additive in the abrasive blast and paint industry; X1 is transforming our industry!


CS Unitec
Surface Prep Tools for Hazardous Conditions

CS Unitec's Trelawny™
line of surface prep tools
is safe and efficient for
use in marine & protective coatings applications including Ex Zones & Hot Work Zones.


Safety Lamp of Houston, Inc.
Wet & hazardous area lighting solutions from SAFETY LAMP of Houston

New WOLF LED and fluorescent lights are now available, including low voltage tank lighting kits.
Call: (281) 964-1019.


Spider, a Division of SafeWorks, LLC
Complete Suspended Access Solutions

Need Access? From platforms & hoists to rigging & fall protection, Spider leads the industry in rentals, sales & service.
Call today: 877-774-3370

 
 
 
Technology Publishing

The Technology Publishing Network

The Journal of Protective Coatings & Linings (JPCL) PaintSquare
Durability + Design Paint BidTracker JPCL Europe

 
EXPLORE:      JPCL   |   PaintSquare News   |   Interact   |   Buying Guides   |   Webinars   |   Resources   |   Classifieds
REGISTER AND SUBSCRIBE:      Free PaintSquare Registration   |   Subscribe to JPCL   |   Subscribe to PaintSquare News
MORE:      About PaintSquare.com   |   Privacy policy   |   Terms & conditions   |   Site Map   |   Search   |   Contact Us
 

© Copyright 2000-2014, Technology Publishing / PaintSquare, All rights reserved
2100 Wharton Street, Suite 310, Pittsburgh PA 15203-1951; Tel 1-412-431-8300; Fax 1-412-431-5428; E-mail webmaster@paintsquare.com