| Connect Follow us on Twitter Like us on Facebook
About | Subscribe | Advertise


Download our free eResource: Specifier's Choice Guide Download Now

Paint and Coatings Industry News

Main News Page

Feds Do the Math on Maintenance

Monday, May 6, 2013

More items for Program/Project Management

Comment | More

“Pay now or pay later” is the mantra of those who support rigorous maintenance of bridges, highways and other infrastructure.

But what does the maintenance math actually look like, both in terms of dollars and structural degradation? And what's the optimal process to confront it?

That's what the U.S. Transportation Research Board wants to find out.

$450K RFP

The agency's National Cooperative Highway Research Program has issued a Request for Proposals to "develop processes for quantifying the consequences of delayed application of maintenance treatments on highway pavements, bridges, and other physical assets."

Bridge painting

Bridge painting and other maintenance are increasingly being deferred. U.S. researchers want a process to help determine the consequences of that.

The agency has budgeted $450,000 for a 27-month study, and proposals are due June 6. The work is expected to begin Oct. 1.

The RFP notes that budget constraints and other factors are increasingly leading to reduction (and even elimination) of maintenance treatments for highway pavements, bridges and other assets.

Counting Costs

TRB is not challenging the premise that deferred maintenance costs more in the long run; it is seeking better tools to help guide maintenance programs. Current tools for quantifying the consequences of delayed maintenance are insufficient, the board said.

"[P]rocesses for using these tools to demonstrate the potential savings and performance enhancements resulting from applying maintenance treatments at the right time are not readily available," the RFP said..

Toll Plaza

The 27-month study would develop processes and data for at least five types of assets, including highway pavement and bridges.

"Research is needed to develop such processes. This information will help highway agencies better assess the economic benefits of maintenance actions and their role in enhancing the level of service of the highway system.

"In addition, incorporating these processes in asset management systems would provide a means for optimizing the allocation of resources."

Project Objectives

The goal of the project is to develop processes for quantifying the consequences of delayed application of maintenance treatments of at least five asset types, including bridges and pavement.

Consequences will be expressed in terms of performance indicators (e.g., distress and level of service), costs to owners and road users, and other relevant factors.

The processes developed should "flexible enough such that they will not require the use of a specific commercially available analytical tool."

The complete RFP is available here.


Tagged categories: Bridges; Government contracts; Infrastructure; Maintenance coating work; Maintenance programs; Research; Roads/Highways; Transportation

Comment from Mike McCloud, (5/6/2013, 8:08 AM)

Mor excuses to give to social programs and not the infrastructure of this country.

Comment from Ron Cros, (5/6/2013, 5:04 PM)

Someone give that painter a wand!!

Comment Join the Conversation:

Sign in to our community to add your comments.

Minerals Research & Recovery

Sharpshot®XL is a new fast-cutting, low-dusting, cost-effective iron silicate abrasive. Call Patrick Conry: 502-552-5895 for details.

SAFE Systems, Inc.
SAFE Systems'
Blast Lights &
Deadman Switches

Halogen or LED blast lights available with our NEW urethane bumper. Switches available in many colors for color coding your hoses.

PPG Protective and Marine Coatings Group
Industrial strength performance in ONE can.

Now get the durability and protection of two components in one can: Amercoat® ONE, PSX® ONE and Sigmadur ONE.

SSPC: The Society for Protective Coatings
SSPC 2016 Register Now!

SSPC2016 is earlier this year, don't forget to book your plane tickets and hotel. See you soon. For more information visit

Termarust Technologies
Termarust (HR CSA) Chemically Stops
Active Corrosion

Truss bridge treated with Termarust's (HR CSA) in 1995. This highway & rail truss bridge is still stable and there still is no active corrosion.

Ethox Chemicals LLC
Ethoflex® ER instantly upgrades your epoxy!

The only epoxy additive that improves flexibility, corrosion resistance, toughness, and adhesion, without hurting pot life, cure time, or increasing VOCs.

Absolute Equipment/Grand Rental Station
Portable Power from Absolute Equipment

•Lighting Systems
•Light Compaction
Sales • Rental • Service
Call 1-866-931-6655
Over a century of
providing excellence.

Julbert, Inc.
Built from the ground up.

Dust Collectors Available!
We deliver to your Jobsite!
Built Tough! Priced Right!
PH: 208-437-2100

Thermion Inc
Buy Back Program

We are offering $5,000
credit for your old Model
This drive system is
being discontinued by
the manufacturer.
More information at

HoldTight Solutions Inc.

Our HoldTight®102 salt remover & flash rust preventer prevents flash
rust by removing surface contaminants. It has no equal; only wannabees.
Contact us for your
nearest distributor.
(800) 319.8802

Technology Publishing

The Technology Publishing Network

The Journal of Protective Coatings & Linings (JPCL) PaintSquare
Durability + Design Paint BidTracker

EXPLORE:      JPCL   |   PaintSquare News   |   Interact   |   Buying Guides   |   Webinars   |   Resources   |   Classifieds
REGISTER AND SUBSCRIBE:      Free PaintSquare Registration   |   Subscribe to JPCL   |   Subscribe to PaintSquare News
MORE:      About   |   Privacy policy   |   Terms & conditions   |   Site Map   |   Search   |   Contact Us

© Copyright 2000-2015, Technology Publishing / PaintSquare, All rights reserved
2100 Wharton Street, Suite 310, Pittsburgh PA 15203-1951; Tel 1-412-431-8300; Fax 1-412-431-5428; E-mail