PaintSquare.com
Follow us on Twitter Follow us on LinkedIn Like us on Facebook Follow us on Instagram Visit the TPC Store
Search the site

 

Advertisement

PaintSquare


Coatings Industry News

Main News Page


Enbridge Begins Recoating Gaps on Line 5

Wednesday, September 13, 2017

More items for Coating Application
More items from North America

Comment | More

Pipeline giant Enbridge Energy is reportedly working to repair coatings on its Line 5 under the Straits of Mackinac in Michigan after inspections over the summer turned up three small areas of bare metal on the pipeline, which has been subject to scrutiny this year by activists and government officials.

Line 5 map
Images: Enbridge Energy unless noted

Line 5, a dual pipeline that carries crude oil and natural gas liquids from Alberta to Sarnia, Ontario, via Michigan, runs under the Straits of Mackinac, between Michigan's Upper and Lower Peninsula.

The Petoskey News reported Sept. 7 that work was set to commence to repair the areas of coating loss on the underwater pipeline that were uncovered in August. Enbridge did not immediately respond to a request for an update on the status of the recoating project Tuesday (Sept. 12).

About Line 5

Line 5, a dual pipeline that carries crude oil and natural gas liquids from Alberta to Sarnia, Ontario, via Michigan, was built in 1953 and has never experienced a rupture, according to Enbridge. But environmentalists have expressed concerns over the potential for catastrophic damage if the aging steel pipeline were to fail.

Enbridge’s pipelines in Michigan have been scrutinized since the 2010 rupture of the company’s Line 6B in Kalamazoo, which released nearly 850,000 gallons of oil into the ground and the Kalamazoo River.

Mackinac Bridge
© iStock.com / Dough4537

Environmentalists have expressed concerns over the potential for catastrophic damage if the aging steel pipeline under the Straits were to fail.

Earlier this year, activists clashed with Enbridge over reports from 2016 that seemed to indicate areas of coating loss on the underwater pipeline; the company said at the time that those reports referred to hypothetical situations, and did not describe the pipeline in its current state. In March, Enbridge said that there were 18 areas of delamination on the twin pipelines, but that it was only the outer coating that was affected, and that protective coatings and cathodic protection on the pipeline were “working as designed.”

The new areas of exposed metal on the line are not associated with the previously discussed delamination, Enbridge said in late August: “None of the areas involve where delamination of the outer wrap over the coating had been observed.”

Caused by Anchoring Work

A spokesperson for the company told MLive.com that Enbridge believes the coating loss is associated with previously performed anchoring work. The company added four new screw anchors in 2016 to support areas where stretches of greater than 75 feet were unsupported due to erosion. It expects to add 18 more in the future. A report from MLive earlier this summer revealed that the pipeline operated for years in violation of easement stipulations regarding the maximum length of unsupported stretches of pipeline.

The company says there is “no visual evidence of any corrosion or impact on the integrity of the pipe” associated with the areas of coating failure. “Enbridge will repair these sections of coating immediately following the completion of all sampling and coating inspections, and after obtaining any necessary permits,” the firm added.

Government Response

While Enbridge says the catch and the subsequent repairs to the line show that its monitoring and maintenance programs are effective, several state agencies and other government figures have expressed concerns about the findings.

“The possibility this loss of coating occurred during the anchor installation process and was not immediately addressed is completely unacceptable," said Michigan Department of Environmental Quality director C. Heidi Grether.

Line 5 underwater

The company added four new screw anchors in 2016 to support areas where stretches of greater than 75 feet were unsupported due to erosion. (Photo from June 2016 underwater inspection does not depict the new anchors.)

“This recent finding raises concerns about the actions Enbridge is taking to protect the waters of the Great Lakes,” said Michigan Department of Natural Resources director Keith Creagh. “We need to ensure that all appropriate risk mitigation measures have been put in place by Enbridge. Until that happens, we as a state will not be satisfied.”

In June, Line 5 passed a series of pressure tests at 1,200 psi—eight times the normal operating pressure of the pipelines—and was declared “fit for service” by the company.

“While the hydrotest results give us confidence that the pipeline is not in imminent danger from these gaps, the fact that human error, not a mussel, created them is something that raises real concern,” said Valerie Brader, executive director of the Michigan Agency for Energy. “Human error was a major factor in Enbridge’s spill into the Kalamazoo River. These coating gaps point to other areas where human error, not the environment, are creating problems.”

And on Tuesday, U.S. Rep. Fred Upton, R-St. Joseph, sent a letter to Enbridge calling for more transparency on the company's part.

Legislative Action

In March, State Sen. Rick Jones, R-Grand Ledge, introduced legislation that would order new risk assessments for underwater pipelines like Line 5, and shut down the lines if they were determined to be at high risk. That bill is still in the Senate’s Committee on Natural Resources.

   

Tagged categories: Oil and Gas; Pipeline; Spot repair

Comment Join the Conversation:

Sign in to our community to add your comments.

Advertisements
 
Waterjet Technology Association (WJTA)
 
Click to register today!
 
See the latest automated and handheld UHP waterblasting tools/systems/products. Exhibits, live demos, educational sessions, waterjet short course, networking.
 

 
Strategic Materials Inc.
 
Crushed Glass Abrasives
 
Competitively priced, high-performing crushed glass abrasive. Available today. Toll-free 1-866-775-6226
 

 
Industrial Vacuum Equipment Corp.
 
Hurricane Vacuums
& Dust Collectors
 
Vacuum and dust collector hose, filters and related accessories.
IndustrialVacuum.com
 

 
CS Unitec
 
Remove Coatings, Corrosion & More!
 
For metal & concrete. Scalers, scabblers, deck hammers & scarifiers. Safe for hot work zones. Call our specialists: 800-700-5919.
Demo videos at www.csunitec.com.
 

 
Jotun Paints Inc.
 
Jotachar JF750 - The Time Saving Solution
 
The only mesh free solution for jet fire scenarios. Jotachar saves installation time and material costs - the next generation of epoxy passive fire protection.
 

 
W Abrasives
 
Optimize your blasting process and operations!
 
Blasting is a complex process that goes above and beyond the simple question of the shot used, no matter how innovative and efficient it is. W Abrasives is there to help.
 

 
CHLOR*RID International Inc.
 
SOLUTIONS THAT WORK
 
Companies that invest in corrosion control use CHLOR RID products
  • Soluble salt removal liquid
  • Test kits to verify contamination levels
  • Surface passivation to hold the blast
INFO@CHLOR-RID.COM 800.422.3217
 

 
Termarust Technologies
 
Termarust (HR CSA) Chemically Stops
Active Corrosion
 
Arch truss treated with Termarust's (HR CSA) in 2003. This steel arch bridge is rust free on all surfaces including the crevice corroded joints and connections.
 

 
DeFelsko Corporation
 
PosiTector SHD Shore Hardness Durometer
 
PosiTector SHD measures the hardness of non-metallic materials. Features a measurement timer, auto ignore mode and internal memory. Shore A or D available.
 

 
Carboline Company
 
Fireproofing Solutions
 
Pyroclad® X1 Thermo-Lag® Pyrocrete® – protecting against hydrocarbon and jet fires, explosions, and cryogenic spills.
 

 
 
 

Technology Publishing Co., 1501 Reedsdale Street, Suite 2008, Pittsburgh, PA 15233

TEL 1-412-431-8300  • FAX  1-412-431-5428  •  EMAIL webmaster@paintsquare.com


The Technology Publishing Network

Durability + Design PaintSquare the Journal of Protective Coatings & Linings Paint BidTracker

 
EXPLORE:      JPCL   |   PaintSquare News   |   Interact   |   Buying Guides   |   Webinars   |   Resources   |   Classifieds
REGISTER AND SUBSCRIBE:      Free PaintSquare Registration   |   Subscribe to JPCL   |   Subscribe to PaintSquare News
MORE:      About PaintSquare.com   |   Privacy policy   |   Terms & conditions   |   Site Map   |   Search   |   Contact Us