PaintSquare.com
Follow us on Twitter Follow us on LinkedIn Like us on Facebook Follow us on Instagram Visit the TPC Store
Search the site

 

Advertisement

PaintSquare


Coatings Industry News

Main News Page


U.S. Bridge, Highway Contracts Slump

Tuesday, September 2, 2014

More items for Program/Project Management
More items from North America

Comment | More

State and local government awards for highway and bridge work have declined by nearly 14 percent in the first half of 2014, compared with the same period last year, a new analysis shows.

State and local governments awarded $29.8 billion in highway and bridge work between January and June 2014, compared to $34.6 billion during the same time period in 2013, when adjusted for material costs and inflation, according to an American Road & Transportation Builders Association (ARTBA) analysis of data from McGraw Hill.

Phill G. McDonald Bridge
Eric Sakowski / highestbridges.com

The pipeline for bridge and highway work has slowed, but West Virginia has three projects, including the Phill G. McDonald Bridge, up for bids until Sept. 9.

Worse, ARTBA says, the slowdown continued into the summer construction season, when state and local governments put out most of their awards.

Trust Bust

One culprit, according to ARTBA, is uncertainty over the future of the federal Highway Trust Fund.

Although Congress approved a stopgap spending measure for the fund shortly after ARTBA released its analysis, the U.S. Department of Transportation and other advocates have been disappointed at Congress's failure to secure a multiyear appropriations package, and the uncertainty over federal transportation funding persists.

The $10.8 billion measure, signed into law Aug. 8, will expire in 10 months.

At least 35 states were warning of project delays or cancellations on the eve of the law.

CBO Warnings

Meanwhile, in June, the Congressional Budget Office (CBO) reported that the Highway Trust Fund, which channels some $50 billion a year in grants through state and local governments, had spent $52 billion more than it took in in the last 10 years. The CBO said that gap would grow to $167 billion from 2015 to 2024 at current rates.

ARTBA Chart
ARTBA

Half of U.S. states are awarding fewer bridge and highway contracts than they did a year ago. Contract activity in five other states was flat.

And in August, the CBO projected: "Beginning in fiscal year 2015, CBO projects, revenues credited to the highway and transit accounts of the Highway Trust Fund will be insufficient to meet the fund's obligations."

Widespread Slowdown

Meanwhile, the construction slowdown is widespread, with 25 states awarding fewer highway and bridge contracts by June 2014 than they did a year ago, according to ARTBA. Awards were up in 21 states and Washington, D.C., and programs were fairly flat in five states, either up or down within five percent.

Contract awards are a leading indicator of future work in the industry as projects get underway.

Detailed data by state and mode is available as part of ARTBA’s market subscription reports.  For more information, contact ARTBA’s Lital Shair.

   

Tagged categories: Bridges; Construction; Contracts; Federal Highway Administration (FHWA); Government; Government contracts; Roads/Highways

Comment Join the Conversation:

Sign in to our community to add your comments.

Advertisements
 
SABRE Autonomous Solutions
 
Productivity
 
Personnel are free to do other tasks while the ALPHA1 does the “dirty work”.
 

 
SAFE Systems, Inc.
 
Portable Dust Collectors for Tough Environments
 
Trailer and skid-mounted models in numerous sizes, powered by electric and/or diesel. Sloped roofs, multiple dust inlets, high static, dampered fans. Lockable power & drive compartments.
 

 
Industrial Vacuum Equipment Corp.
 
Hurricane Vacuums
& Dust Collectors
 
Vacuum and dust collector hose, filters and related accessories.
IndustrialVacuum.com
 

 
HoldTight Solutions Inc.
 
NO FLASH RUST - NO CONTAMINANTS
 
Our HoldTight®102 salt remover & flash rust
preventer prevents flash
rust by removing surface contaminants. Contact us
for your nearest distributor.
(800) 319.8802 sales@holdtight.com
 

 
ABKaelin, LLC
 
ABKAELIN EH&S SERVICES
 
Programs/Training/Monitoring for Silica, Lead, Noise, Beryllium, Hexavalent Chromium, Cadmium, Hazardous Waste*PM10 & TSP-Lead Ambient Air Monitoring*SSPC C3/C5
 

 
NLB Corporation
 
NLB Sure Shroud: Greater Protection and Flexibility
 
NLB’s Sure Shroud’s lighter weight and flexibility reduces operator fatigue and offers unmatched protection against high pressure hose ruptures. 10k to 40k psi rated.
 

 
US Minerals
 
Hit Harder. Clean Faster.
 
Black Diamond abrasive products are the toughest, most effective blasting media and supply the superior power you need to get any job done.
 

 
KTA-Tator, Inc. - Corporate Office
 
KTA-TATOR LABORATORY SERVICES
 
• Coating failure analysis
• Independent testing
• Accelerated weathering testing
• Abrasives Testing
• Oil & Gas Material Qualification
• A2LA Certificate #2455.01
Contact: Rob Leggat
at 412-788-1300 x176
 

 
Monti Tools, Inc.
 
BRISTLE BLASTER® – THE ORIGINAL ONE
 
  • Abrasive blast with a power tool
  • Remove corrosion, mill scale and coatings
  • Cleans & roughens
  • Meets SSPC-SP 10 / NACE No. 2
  • Profile up to 4.7 mils
  • ATEX Zone 1
  •  

     
     
     

    Technology Publishing Co., 1501 Reedsdale Street, Suite 2008, Pittsburgh, PA 15233

    TEL 1-412-431-8300  • FAX  1-412-431-5428  •  EMAIL webmaster@paintsquare.com


    The Technology Publishing Network

    Durability + Design PaintSquare the Journal of Protective Coatings & Linings Paint BidTracker

     
    EXPLORE:      JPCL   |   PaintSquare News   |   Interact   |   Buying Guides   |   Webinars   |   Resources   |   Classifieds
    REGISTER AND SUBSCRIBE:      Free PaintSquare Registration   |   Subscribe to JPCL   |   Subscribe to PaintSquare News
    MORE:      About PaintSquare.com   |   Privacy policy (Updated 1/8/2018)   |   Terms & conditions   |   Site Map   |   Search   |   Contact Us