PaintSquare.com
Follow us on Twitter Follow us on LinkedIn Like us on Facebook Follow us on Instagram Visit the TPC Store
Search the site

 

Advertisement

PaintSquare


Coatings Industry News

Main News Page


China Aims for Twin Tower Record

Wednesday, July 2, 2014

More items for Program/Project Management
More items from Asia Pacific

Comment | More

Talk about high hopes: China has unveiled a new project that will include the world’s tallest pair of towers.

The project will also reportedly include the world’s tallest living wall, the world’s tallest kaleidoscope, and coatings designed to filter pollution.

Phoenix Towers
Photos: Chetwoods Architects

London-based Chetwoods Architects unveiled its plan for the world's tallest pair of towers this month.

Intended to reach some 3,280 feet into the sky, the Phoenix Towers in Wuhan, China, are poised to put the central Chinese city on the environmental map and top the height of the world’s tallest skyscraper—Burj Khalifa in Dubai.

London-based Chetwoods Architects unveiled its plan for the pair of towers this month.

Landmark, Technologies

The towers, which will function as landmark tourist attractions housing shops, restaurants, offices and other amenities, will occupy 17 acres of a 116-acre site that sits upon an island in a lake, the architects say.

The project will incorporate a vast array of environmental building technologies, including biodynamic pollution-absorbing coatings meant to filter and clean the city’s air, the firm adds.

Phoenix Towers

A variety of innovative technologies will be incorporated in the buildings, according to project details.

The towers will also have green walls; insect hotels; biomass boilers; wind turbines; solar photovoltaics; a thermal chimney; rainwater harvesting; and evaporative cooling systems, according to project details.

The design was inspired by Chinese Phoenix mythological birds, Gizmag reported.

Currently, the development is awaiting final approval from the Wuhan Mayor. Should the project move forward, it would be completed by 2018, reports say.

The estimated cost of the towers is $2.4 billion, according to the Telegraph.

   

Tagged categories: Aesthetics; Architects; Architecture; Commercial Construction; Design; Environmentally friendly

Comment Join the Conversation:

Sign in to our community to add your comments.

Advertisements
 
Tarps manufacturing, Inc.
 
QUALITY MADE IN AMERICA —Available near you!
 
CLICK to get a behind-the-scenes look at how Tarps Manufacturing makes the highest-quality tarps right here in the USA — available nationwide.
 

 
SEMicro Division, M.E. Taylor Engineering, Inc.
 
Coatings Adhesion Testers
 
The PATTI® accurately measures the bond strength between coating & substrate. Outfitted properly, the surface can be rough, porous, or curved & >10K psi strong!
 

 
SAFE Systems, Inc.
 
Enduroguard -
The Tough Cable
for a Tough Industry.
 
Reduce maintenance costs and down time, increase job site safety with Enduroguard Cable. Available exclusively from SAFE Systems. UL listed, flexible, abrasion resistant and cut resistant.
 

 
Detail Masters
 
Overspray Removal
 
We offer professional, turnkey service and unparalleled quality!
Our process can save hundreds— even thousands of dollars. It's fast, environmentally safe and 100% guaranteed.
 

 
PPG Protective and Marine Coatings Group
 
We Protect and Beautify the World
 
PPG is widely recognized as a world leader in protective and marine coatings, developing innovative, cutting-edge products and services.
 

 
PreTox Products - NexTec, Inc.
 
GOT LEAD? Specify Pretox System products
 
The ONLY Lead Stabilizer Compatible with All Paint Removal Methods. Works with all Blast Media: Grits | Recyclable Abrasives | CO2 | Water | Power Tools | Etc. Call Dave Steffen at 800.338.8296.
 

 
SABRE Autonomous Solutions
 
Safety
 
Removing blasting operators from harmful environments is our key objective.
 

 
Blastox/The TDJ Group, Inc.
 
Blastox® - One Step Lead Abatement
 
Sandblast additive delivered to jobsite pre-blended to eliminate hazardous abrasive wastes. Why mix, meter or apply at the job-site? Blast with ease and
Let your painters paint!
1(800)-252-7869
 

 
Termarust Technologies
 
Termarust (HR CSA) Chemically Stops
Active Corrosion
 
Arch truss treated with Termarust's (HR CSA) in 2003. This steel arch bridge is rust free on all surfaces including the crevice corroded joints and connections.
 

 
Monti Tools, Inc.
 
BRISTLE BLASTER® – THE ORIGINAL ONE
 
  • Abrasive blast with a power tool
  • Remove corrosion, mill scale and coatings
  • Cleans & roughens
  • Meets SSPC-SP 10 / NACE No. 2
  • Profile up to 4.7 mils
  • ATEX Zone 1
  •  

     
     
     

    Technology Publishing Co., 1501 Reedsdale Street, Suite 2008, Pittsburgh, PA 15233

    TEL 1-412-431-8300  • FAX  1-412-431-5428  •  EMAIL webmaster@paintsquare.com


    The Technology Publishing Network

    Durability + Design PaintSquare the Journal of Protective Coatings & Linings Paint BidTracker

     
    EXPLORE:      JPCL   |   PaintSquare News   |   Interact   |   Buying Guides   |   Webinars   |   Resources   |   Classifieds
    REGISTER AND SUBSCRIBE:      Free PaintSquare Registration   |   Subscribe to JPCL   |   Subscribe to PaintSquare News
    MORE:      About PaintSquare.com   |   Privacy policy   |   Terms & conditions   |   Site Map   |   Search   |   Contact Us