PaintSquare.com
      | Connect Follow us on Twitter Like us on Facebook
About | Subscribe | Advertise
  

 

Download our free e-book! Corrosion Under Insulation. Sponsored by Thermion.

Paint and Coatings Industry News

Main News Page


And Now, A Project to Really Move You

Friday, March 14, 2014

More items for Program/Project Management

More items from EMEA (Europe, Middle East and Africa)

Comment | More

Think of it as a mobile home for really, really rich people, who want the changing scenery brought to them.

Architect David Fisher calls it “dynamic architecture”—dynamic, as in movingand is proposing a 78-floor tower that does just that in Dubai, United Arab Emirates.

Each floor in the so-called 1,027-foot-high Da Vinci Tower would rotate independently, with one full rotation in 90 minutes, creating a structure whose shape changes constantly, Fisher says.

Images: © Dynamic Architecture

Solar panels and wind turbines between each floor would generate enough power for the 78-floor Da Vinci Tower and five other buildings, the architect says. Only the building core would be constructed on site.

The entire 78-floor structure would be self-powered by 77 wind turbines positioned horizontally between each rotating floor.

The turbines, augmented by solar panels, would generate up to 1.2 million kilowatt-hours of energy—enough to power the tower and five other buildings in the area, Fisher's firm, Dynamic Architecture, says in a video presentation.

The firm says the design represents "a new era in architecture."

Building in 4D

"Life is movement," Fisher's video says. "It's about keeping up with time, with changing of the seasons."

Time is "our best architect," the video says. "If your life travels through time, you need a home which travels accordingly."

DaVinci Tower

The DaVinci Tower would be built with prefabricated techniques. The concrete core would be erected on site, with the luxury units produced in a factory, shipped to the site, and then installed.

The promise: "In our buildings, you can have breakfast facing sunrise and dinner in front of a sunset over the ocean without moving from your room."

The firm calls this "a building in four dimensions."

Prefab Construction

The skyscraper would be the first built with prefabricated techniques, the firm says. Only the concrete core would be built on site; the other 90 percent (all of the building's luxury units) will be produced in a factory and shipped to the site, to allow the building to be erected in just 18 months, the firm says.

Each floor would take just six days to complete, rather than the six weeks required for a conventional project, the designer says.

Dynamic Architecture

The Dubai tower would usher in a "new era in architecture," says Italian architect David Fisher.

In all, the prefab method will save 23 percent in construction costs compared to comparable conventional skyscrapers and would require only 90 works at the construction site, according to the firm.

Getting Started

Dynamic Architecture envisions the Dubai project as the first of a series, with other dynamic skyscrapers planned for London, Paris, Moscow and New York. A "dynamic hotel" is also touted on the firm's site.

However, there is no indication from the firm that any of the projects is underway. The firm's video presentation was uploaded to YouTube in 2008, and the company did not respond this week to questions about the projects' current status.

   

Tagged categories: Architecture; Building design; Commercial Construction; Construction; Design; Prefabrication

Comment Join the Conversation:

Sign in to our community to add your comments.

Desco Mfg. Co., Inc.
DUST-FREE SOLUTIONS For Lead Abatement

Tools operate at levels well below OSHA limits for hazardous material removal; meet SP11 specifications when required and low vibration tools increase productivity.


SABRE Autonomous Solutions
Safety, Productivity, Quality. Robotic Blasting

Learn how this simple to use, field deployed, automatic robot is eliminating hazards in major confined, cluttered and complex surface preparation projects.


Safway Services
Safeguard Assets. Ensure Productivity. HAKI®

Protect assets and equipment. Keep facilities open and operational. Maintain schedules regardless of weather. Ensure smooth and continuous production. Easy to erect. Safway is the primary distributor of HAKI® products including HAKISPAN and HAKITEC® 750 – in North America.


N.T. Ruddock Co.

Our Abrasives Hold Up Under Pressure

N. T. Ruddock focuses on abrasive selection, equipment evaluation, equipment maintenance & reduction of abrasive consumption. Other services include Screen Analysis & Background Radiation Testing.


Tarps manufacturing, Inc.
QUALITY MADE IN AMERICA —Available near you!

CLICK to get a behind-the-scenes look at how Tarps Manufacturing makes the highest-quality tarps right here in the USA — available nationwide.


Covestro Deutschland
What keeps contractors one layer ahead when finishing their projects?

The answer: Pasquick®. Thanks to Pasquick®, one layer of coating is saved – resulting in faster workflows and earlier project finishing. Learn more.


Easy-Kleen Pressure Systems Ltd.
HIGH PRESSURE HOT WATER/STEAM UNITS

3000 to 8000 PSI ALL IN ONE: Water tank, reels and unit enclosed in an industrial skid frame. Call Today and ask about the Fill & Play Series 1-800-315-5533


Seymour Midwest
Coating Application Tools & Supplies

Visit our “Where to Buy” site to find a local paint or tool supplier near you. Click here for a chance to win $500 of Tools & Supplies. 1(844)739-6687 Sales@SeymourMidwest.com


HoldTight Solutions Inc.
NO FLASH RUST -
NO CONTAMINANTS

Our HoldTight®102 salt remover & flash rust preventer prevents flash
rust by removing surface contaminants. It has no equal; only wannabees.
Contact us for your
nearest distributor.
(800) 319.8802 sales@holdtight.com


Clemco International GmbH
Global engineering-trusted solutions

For more than 70 years, Clemco has provided the highest quality blast equipment with a total commitment to comfort and safety.

 
 
 
Technology Publishing

The Technology Publishing Network

The Journal of Protective Coatings & Linings (JPCL) PaintSquare
Durability + Design Paint BidTracker

 
EXPLORE:      JPCL   |   PaintSquare News   |   Interact   |   Buying Guides   |   Webinars   |   Resources   |   Classifieds
REGISTER AND SUBSCRIBE:      Free PaintSquare Registration   |   Subscribe to JPCL   |   Subscribe to PaintSquare News
MORE:      About PaintSquare.com   |   Privacy policy   |   Terms & conditions   |   Site Map   |   Search   |   Contact Us
 

© Copyright 2000-2016, Technology Publishing / PaintSquare, All rights reserved
2100 Wharton Street, Suite 310, Pittsburgh PA 15203-1951; Tel 1-412-431-8300; Fax 1-412-431-5428; E-mail webmaster@paintsquare.com