PaintSquare.com


The First Word in Protective & Marine Coatings

A Product of Technology Publishing / PaintSquare
JPCL | PaintSquare News | Durability + Design | Paint BidTracker

Paint and Coatings Industry News

Main News Page


Gunboat Museum Painting Up for Bid

Wednesday, February 5, 2014

Comment | More

The North Carolina Department of Cultural Resources has invited bids for the power washing, priming, and painting of the CSS Neuse Civil War Interpretive Center in Kinston, NC.

The project involves cleaning, priming, surface preparation, and recoating the exterior masonry surfaces of the building, which houses a gunboat from the Civil War.

C.S.S. Neuse
visitkinston.com

Officials are seeking a contractor to repaint exterior surfaces of the CSS Neuse Civil War Interpretive Center building in downtown Kinston, NC.

Bids are due Feb 24.

Project Details

The contractor will be expected to power-wash the exterior precast masonry and previously painted masonry surfaces through use of a chlorinated cleaning solution to remove all debris without harm to the building. The surface may be scraped to remove all areas of loose paint. No heat torches or rotary sanders will be permitted on this project.

All surfaces to be painted will require cleaning and drying before application

Contractors will paint the exterior masonry surfaces using either brushes, 3/8-inch nap rollers, or a sprayer. All unpainted surfaces will require adequate masking to prevent overspray.

About the Vessel

The CSS Neuse Civil War Interpretive Center opened to the public on July 18, 2013. It houses the reassembled CSS Neuse, one of the 26 ironclads commissioned by the Confederate navy, according to the North Carolina Department of Cultural Resources.

North Carolina Department of Cultural Resources / YouTube

The CSS Neuse is transported through downtown Kinston, NC, to the Interpretive Center in June 2012.

The ship measured 158 feet long and 34 feet wide, but delays in construction prevented the gunboat from seeing combat. The vessel was deliberately burned by its crew during Union occupation of Kinston in March 1858, ultimately sinking the craft.

The boat was preserved by the muddy water of the Neuse River for nearly 100 years until its recovery began in 1961. By 1963, the ship was finally raised, along with nearly 15,000 artifacts that were recovered from within.

The Interpretive Center is available for tours while permanent exhibits are still in development, according to the owner.

Reported by Paint BidTracker, a construction reporting service devoted to identifying contracting opportunities for the coatings community.

Get a free trial of Paint BidTracker now.

   

Tagged categories: Bidding; Exterior painting; Government contracts; Masonry coatings

Comment Join the Conversation:

Sign in to our community to add your comments.

SAFE Systems, Inc.
Portable Dust Collectors for Tough Environments

Trailer and skid-mounted models in numerous sizes, powered by electric and/or diesel. Sloped roofs, multiple dust inlets, high static, dampered fans. Lockable power & drive compartments.


Modern Safety Techniques
Modern Safety Techniques

See our Low Temperature Catalyst for your CO removal needs. Help to provide your workers with safe, comfortable breathing air!


Termarust Technologies
Termarust (HR CSA) Chemically Stops
Active Corrosion

Hydro Utility Penstock Overcoated in 1997. Was power washed and overcoated with major cost saving. No environmental impact with Termarust's low LC50 of 41,007 ppm.


U.S. Zinc

Combat deterioration and corrosion with our zinc dust in your paints and coatings. U.S. Zinc – Helping the world work™


Safway Services
Suspended Access Made Easy With QuikDeck™

The smart choice for suspended access, QuikDeck’s interchangeable, lightweight components make them easy to set up and reassemble when you need to move.


Minerals Research & Recovery

HIGH PERFORMANCE ABRASIVES

(no needles to embed!)
Why recycle waste from other countries? Go FASTER, CLEANER, at 1/3 THE COST with MR&R “All-American” Sharpshot®HP!!

WATCH THE VIDEO


Advanced Recycling Systems
ADVANCED RECYCLING SYSTEMS (ARS)

Recycling Machines, Dust Collectors, Rapid Deployment units are time-tested and approved for the rugged industrial environment. Contact ARS today!
(330)536-8210

 
 
 
Technology Publishing

The Technology Publishing Network

The Journal of Protective Coatings & Linings (JPCL) PaintSquare
Durability + Design Paint BidTracker JPCL Europe

 
EXPLORE:      JPCL   |   PaintSquare News   |   Interact   |   Buying Guides   |   Webinars   |   Resources   |   Classifieds
REGISTER AND SUBSCRIBE:      Free PaintSquare Registration   |   Subscribe to JPCL   |   Subscribe to PaintSquare News
MORE:      About PaintSquare.com   |   Privacy policy   |   Terms & conditions   |   Site Map   |   Search   |   Contact Us
 

© Copyright 2000-2014, Technology Publishing / PaintSquare, All rights reserved
2100 Wharton Street, Suite 310, Pittsburgh PA 15203-1951; Tel 1-412-431-8300; Fax 1-412-431-5428; E-mail webmaster@paintsquare.com