| Connect Follow us on Twitter Like us on Facebook
About | Subscribe | Advertise


Get on-line education from the Pro Video Learning Series.

Paint and Coatings Industry News

Main News Page

Rail Crew Finds Skulls Under London

Monday, October 7, 2013

More items for Program/Project Management

Comment | More

Crews working on a rail project in London are wearing two hats these days—those of construction worker and archaeologist—after discovering about 20 ancient skulls in the sediment of a historic river channel deep beneath the city.

Tunnelers discovered the Roman skulls, along with Roman pottery, while building a utilities tunnel underneath the Liverpool Street station site for Crossrail, the project developers announced.

And because the skulls are up to six meters (just shy of 20 feet) below ground, the archaelogy work is being left to the construction workers for safety reasons.

Crossrail skulls

About 20 Roman skulls and pottery were discovered by construction workers digging a utilities tunnel under London as part of the Crossrail project.

"This is an unexpected and fascinating discovery that reveals another piece in the jigsaw of London's history," said lead archaeologist Jay Carver.

Clusters of Skulls

This isn't the first discovery of skulls in the River Walbrook bed, Carter notes. Early historians suggest they are those of people killed during the Boudicca rebellion against the Romans, he said.

Throughout London's history, Roman skulls have been found along the Thames tributary, and many speculated that they belong to those decapitated by Queen Boudicca's rebels in the 1st Century AD.

However, the skulls are now believed to be from a Roman burial site 50 meters up the river from the Liverpool Street station worksite.

"Their location in the Roman layer indicates they were possibly washed down river during the Roman period," Carver says.

The skulls were located in clusters, suggesting that they had been washed out of the burial ground and caught in a bend in the river.

The skulls were thought to belong to people decapitated during a 1st Century AD rebellion. Now, archaeologists think they were washed out of a Roman burial ground.

The skulls were found below the Bedlam burial ground established in the 16th century. Three thousand skeletons will be removed from the location next year during an archaeological excavation.

The workers also found wooden medieval structures thought to be from the walls of the Bedlam burial ground.

The Museum of London Archaeology, contracted by Crossrail's, will analyze the discovery in hopes of learning more about the age, sex and diet of the people.

Since the Crossrail project started in 2009, more than 10,000 archaelogy items have been discovered across 40 construction sites. The findings represent more than 55 million years of London's history, according to Crossrail Limited.

About Crossrail

Crossrail is Europe's largest infrastructure project and is delivering the UK's largest archaeology program.

Funding for Crossrail totals £14.8 billion (about $23.9 billion USD). The route will pass through 38 stations, increasing London's rail-based transport network capacity by 10 percent.

Crossrail Limited is a wholly owned subsidiary of Transport for London; Crossrail is jointly sponsored by the Department for Transport and Transport for London.

Crossrail is scheduled to open in central London in 2018.


Tagged categories: Construction; Contractors; Rail

Comment from Car F., (10/7/2013, 3:36 PM)

Horror of horrors!!! the government is building a massive infraestructure project,...the sky will fall soon!!!

Comment Join the Conversation:

Sign in to our community to add your comments.

Covestro (formerly Bayer)
Bayer MaterialScience is now Covestro.

The pioneering spirit of our first 150 years will drive the bold vision of our next 150: to develop the industry’s most innovative coatings solutions.

Minerals Research & Recovery

Sharpshot®XL is a new fast-cutting, low-dusting, cost-effective iron silicate abrasive. Call Patrick Conry: 502-552-5895 for details.

PPG Protective and Marine Coatings Group
Industrial strength performance in ONE can.

Now get the durability and protection of two components in one can: Amercoat® ONE, PSX® ONE and Sigmadur ONE.

Graco Inc.
Graco Mortar Pump

The M680 sprays epoxy-based mortars, anti-skid coatings, cementitious and filled materials. Compact.
Easy to use.
Call 877-844-7226 or

CS Unitec
Peening Preparation Tools

CS Unitec’s hand-held scarifiers are an ideal alternative to small-area shot blasting for cleaning and preparing concrete & metal surfaces.

Sidewinder/Persyst Enterprises, Inc.
The Sidewinder Model M2 Solvent Recycler

Combat the rising cost of gunwash, thinners, acetone & more while drastically reducing waste disposal coat.

Safety Lamp of Houston, Inc.
Wet & hazardous area lighting solutions from SAFETY LAMP of Houston

New WOLF LED and fluorescent lights are now available, including low voltage tank lighting kits.
Call: (281) 964-1019.

SSPC: The Society for Protective Coatings
SSPC 2016 Register Now!

SSPC2016 is earlier this year, don't forget to book your plane tickets and hotel. See you soon. For more information visit

SAFE Systems, Inc.
Portable Dust Collectors for Tough Environments

Trailer and skid-mounted models in numerous sizes, powered by electric and/or diesel. Sloped roofs, multiple dust inlets, high static, dampered fans. Lockable power & drive compartments.

Detail Masters
Overspray Removal

We offer professional, turnkey service and unparalleled quality!
Our process can save hundreds— even thousands of dollars. It's fast, environmentally safe and 100% guaranteed.

Technology Publishing

The Technology Publishing Network

The Journal of Protective Coatings & Linings (JPCL) PaintSquare
Durability + Design Paint BidTracker

EXPLORE:      JPCL   |   PaintSquare News   |   Interact   |   Buying Guides   |   Webinars   |   Resources   |   Classifieds
REGISTER AND SUBSCRIBE:      Free PaintSquare Registration   |   Subscribe to JPCL   |   Subscribe to PaintSquare News
MORE:      About   |   Privacy policy   |   Terms & conditions   |   Site Map   |   Search   |   Contact Us

© Copyright 2000-2015, Technology Publishing / PaintSquare, All rights reserved
2100 Wharton Street, Suite 310, Pittsburgh PA 15203-1951; Tel 1-412-431-8300; Fax 1-412-431-5428; E-mail