PaintSquare.com
Follow us on Twitter Follow us on LinkedIn Like us on Facebook Follow us on Instagram
Search the site

 

Download our FREE eResource: Specifier's Choice Guide. Get it now.

Coatings Industry News

Main News Page


Bids Invited for $5M+ Bridge Painting

Thursday, October 3, 2013

Comment | More

The Maryland Transportation Authority is seeking contractors with SSPC-QP 1 and QP 2 certification to clean and paint the Francis Scott Key Bridge over Curtis Bay in Baltimore, MD.

The project cost is estimated at $5 million to $10 million. Bids are due Oct. 10.

Scope of Work

The project includes cleaning and painting the structural steel surfaces of the drawbridge portion of the Key Bridge over Curtis Bay. Contractors will be required to coat the approach spans, two walkways, and steel parapets of the bascule spans along Interstate 695.

Francis Scott Key Bridge
Wikimedia Commons / Jeff Kubina

Bids are being accepted until Oct. 10 for cleaning and painting of the Francis Scott Key Bridge over Curtis Bay in Baltimore, MD. The total structure is nearly 11 miles long.

In addition, the steel will be abrasive blast-cleaned to Near-White (SSPC-SP 10), spot cleaned to SP 11 (Bare Metal), and recoated with MDSHA System C, which consists of an organic zinc-rich primer, an epoxy intermediate, and a polyurethane finish.

The contractor will also be required to handle installation and removal of all traffic measures and maintenance.

About the Structure

The Francis Scott Key Bridge is the second-longest continuous steel truss in the United States. Including the Curtis Creek Drawbridge and approach ways, the bridge reaches approximately 10.9 miles long, according to the Maryland Transportation Authority (MTA).

On completion, the bridge and approaches were the final links of the Baltimore Beltway.

The idea for the crossing dates to the 1960s, when MTA declared interest in building a single-tube tunnel beneath the Patapsco River. However, bids for the project were significantly higher than the engineering estimates, resulting in alternative plans for a four-lane bridge.

Francis Scott Key Bridge
MTA

The Francis Scott Key Bridge, named for the composer, carries about 11.7 million vehicles annually.

Construction on the $60.3 million project began in 1972, and the bridge finally opened on March 23, 1997.

Carrying about 11.7 million vehicles annually, the bridge crosses within 100 yards of the location where scholars believe Francis Scott Key witnessed the bombardment of Fort McHenry, inspiring him to write the Star Spangled Banner.

The Engineer’s Guide to Baltimore explains that the bridge combines the behaviors of an arch, truss, and cantilever,with no expansion joints.

Reported by Paint BidTracker, a construction reporting service devoted to identifying contracting opportunities for the coatings community.

Try Paint BidTracker free!

   

Tagged categories: Bridges; Contractors; Contracts; Department of Transportation (DOT); Paint BidTracker; SSPC-QP 1; SSPC-QP 2; Steel

Comment Join the Conversation:

Sign in to our community to add your comments.

Advertisements
 
International Bridge Conference
 
2017 International Bridge Conference
 
June 4-8, 2017, National Harbor, Maryland
 

 
Industrial Vacuum Equipment Corp.
 
Hurricane Vacuums
& Dust Collectors
 
Vacuum and dust collector hose, filters and related accessories.
IndustrialVacuum.com
 

 
SAFE Systems, Inc.
 
Enduroguard -
The Tough Cable
for a Tough Industry.
 
Reduce maintenance costs and down time, increase job site safety with Enduroguard Cable. Available exclusively from SAFE Systems. UL listed, flexible, abrasion resistant and cut resistant.
 

 
Detail Masters
 
Overspray Removal
 
We offer professional, turnkey service and unparalleled quality!
Our process can save hundreds— even thousands of dollars. It's fast, environmentally safe and 100% guaranteed.
 

 
HoldTight Solutions Inc.
 
NO FLASH RUST - NO CONTAMINANTS
 
Our HoldTight®102 salt remover & flash rust
preventer prevents flash
rust by removing surface contaminants. Contact us
for your nearest distributor.
(800) 319.8802 sales@holdtight.com
 

 
W Abrasives
 
Steel Abrasives from
W Abrasives
 
As the global leader in steel abrasives, W Abrasives material is the efficient and eco-friendly solution blasting with you to reach the perfect profile.
 

 
Mitsubishi Gas Chemical America
 
Performance Amine 1,3-BAC
 
A highly reactive cycloaliphatic diamine offering superior performance. Reasonable cost and curing efficacy makes it suitable for all types of epoxy resin applications.
 

 
Sherwin-Williams
 
Sherwin-Williams Oil & Gas App
 
Our coatings and linings expertise available 24/7, allowing you to explore the best Sherwin-Williams solutions for oil refineries, shale drilling sites, and offshore. Android users
click here. Download today!
 

 
Termarust Technologies
 
Termarust (HR CSA) Chemically Stops
Active Corrosion
 
Arch truss treated with Termarust's (HR CSA) in 2003. This steel arch bridge is rust free on all surfaces including the crevice corroded joints and connections.
 

 
SSPC: The Society for Protective Coatings
 
http://www.sspc.org/
 
Join SSPC and Enhance
Your Career !
 

 
 
 

Technology Publishing Co., 2100 Wharton Street, Suite 310, Pittsburgh PA 15203-1951

TEL 1-412-431-8300  • FAX  1-412-431-5428  •  EMAIL webmaster@paintsquare.com


The Technology Publishing Network

Durability + Design PaintSquare the Journal of Protective Coatings & Linings Paint BidTracker

 
EXPLORE:      JPCL   |   PaintSquare News   |   Interact   |   Buying Guides   |   Webinars   |   Resources   |   Classifieds
REGISTER AND SUBSCRIBE:      Free PaintSquare Registration   |   Subscribe to JPCL   |   Subscribe to PaintSquare News
MORE:      About PaintSquare.com   |   Privacy policy   |   Terms & conditions   |   Site Map   |   Search   |   Contact Us